ML20138K795
| ML20138K795 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 12/12/1985 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Berry K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20138K799 | List: |
| References | |
| NUDOCS 8512190076 | |
| Download: ML20138K795 (2) | |
Text
-
t December 12, 1985 Docket No. 50-155 DISTRIBUTION Docket BGrimes NRC PDR JPartlow Local PDR TRotella Mr. Kenneth W. Berry ORB #5 RDG "Jamerson Director, Nuclear Licensing HThompson JZwolinski Consumers Power Company 0 ELD ACRS(10) 1945 West Parnall Road EJordan GHolahan Jackson, Michigan 49201 TBarnhart(4) CMiles HDenton RDigg (w/ TAC)
Dear Mr. Berry:
PLEng, RIII
SUBJECT:
REQUEST FOR INSERVICE TESTING RELIEF FOR VALVES IN THE FEEDWATER AND REACTOR DEPRESSURIZATION NITROGEN BACKUP SYSTEMS Re:
Big Rock Point Plant By letter dated April 10, 1985, Consumers Power Company submitted two relief requests for valve testing in the subject systems for the second ten-year inservice inspection and testing interval at the Big Rock Point Plant.
The staff has reviewed the material provided by letter dated April 10, 1985.
The staff's Safety Evaluation concludes that the required testing is impractical to perform and that the alternate methods of examination discussed in the Safety Evaluation provide reasonable assurance of the operability of the subject valves. The staff also concludes that granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest considering the burden that could result upon Consumers Power Company if the Code requirements were imposed upon the Big Rock Point Plant.
Accordingly, pursuant to 10 CFR 50.55a(g)(6)(1) of the Commissions regulations, Consumers Power Company is granted the requested relief from the Code valve testing requirements for the subject valves. A copy of our Safety Evaluation is enclosed.
Sincerely, W
gaW e512190076 e51212 pe#>n DR ADOCK 050 5
Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc: See next page
/
Tr WW,gd,ylc DL:0RBf5 DL:0RBf5 A DL-J QS, D-0:DL g/[;p;P rywyn -
CJamerson TRotella:jg JZ TMs4 DC utchfield
^
ll/'J\\/8
$/t4/85 gg
/85 pk/85
/85 on 85 f/p/85
///g85 c
P l
Mr. Kenneth W. Berry Consumers Power Company Big Rock Point Plant CC:
I Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire y
Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Big Rock Point Plant ATTN: Mr. David P. Hoffman Plant Superintendent l
Route 3 Post Office Box 591 Charlevoix, Michigan 49720 Mr. I. Lee Moerland Chairman, Board of Comissioners P. O. Box 218 g
Charlevoix, Michigan 49720 f
Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator Nuclear Regulatory Comission, Region III 799 Roosevelt Road a
Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 f
Lansing, Michigan 48909 Resident Inspector Big Rock Point Plant c/o U.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720 i
y 7
_