Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000352/LER-1985-077, :on 850926,spurious Div IV Trip Signals Received Resulting in Load Shedding in Anticipation of Diesel Generator Loading.Caused by Loose Connection in Power Panel.Connection Tightened + (23:53:18, 11 December 2024)
- ML20138L058 + (23:53:20, 11 December 2024)
- ML20138L057 + (23:53:21, 11 December 2024)
- ML20138L056 + (23:53:21, 11 December 2024)
- PNO-III-85-102, on 851214,during Outage,Both Trains of RHR Sys Lost When Water in Reactor Vessel Drained Below Level of Suction Line.Caused by Erroneous Control Room Indication of RCS Configuration Used for Outage + (23:53:25, 11 December 2024)
- ML20138L049 + (23:53:26, 11 December 2024)
- ML20138L045 + (23:53:27, 11 December 2024)
- ML20138L044 + (23:53:28, 11 December 2024)
- ML20138L040 + (23:53:29, 11 December 2024)
- IR 05000373/1985036 + (23:53:32, 11 December 2024)
- ML20138L037 + (23:53:33, 11 December 2024)
- ML20138L035 + (23:53:34, 11 December 2024)
- ML20138L034 + (23:53:34, 11 December 2024)
- ML20138L031 + (23:53:35, 11 December 2024)
- ML20138L027 + (23:53:36, 11 December 2024)
- ML20138L026 + (23:53:37, 11 December 2024)
- ML20138L024 + (23:53:38, 11 December 2024)
- ML20138L022 + (23:53:38, 11 December 2024)
- ML20138L019 + (23:53:39, 11 December 2024)
- ML20138L020 + (23:53:39, 11 December 2024)
- ML20138L018 + (23:53:40, 11 December 2024)
- ML20138L014 + (23:53:40, 11 December 2024)
- ML20138L013 + (23:53:41, 11 December 2024)
- B11681, Forwards Summary of Integrated Safety Assessment Program Topic 1.17, Replacement of Motor-Operated Valves, Which Was Evaluated for Public Safety Impacts,Per 850731 Request. Safety Impact Scores Considered Preliminary + (23:53:42, 11 December 2024)
- ML20138L011 + (23:53:42, 11 December 2024)
- RA-97-0002, Forwards Rev 33 to Industrial Security Plan.Encl Withheld + (23:53:43, 11 December 2024)
- ML20138L002 + (23:53:44, 11 December 2024)
- ML20138L004 + (23:53:44, 11 December 2024)
- ML20138K999 + (23:53:45, 11 December 2024)
- ML20138L000 + (23:53:45, 11 December 2024)
- ML20138K997 + (23:53:46, 11 December 2024)
- ML20138K995 + (23:53:46, 11 December 2024)
- ML20138K993 + (23:53:47, 11 December 2024)
- ML20138K991 + (23:53:48, 11 December 2024)
- ML20138K987 + (23:53:48, 11 December 2024)
- ML20138K985 + (23:53:49, 11 December 2024)
- ML20138K984 + (23:53:53, 11 December 2024)
- ML20138K982 + (23:53:53, 11 December 2024)
- U-600352, Part 21 & Deficiency Rept (21-85-15) Re Bar Stock Matl Heat Code 3876 Used by Yarway Corp to Mfg Valve Stems for 1/2 & 3/4 Inch Welbond Valves.Evaluation Being Conducted + (23:53:54, 11 December 2024)
- ML20138K979 + (23:53:54, 11 December 2024)
- ML20138K978 + (23:53:55, 11 December 2024)
- ML20138K975 + (23:53:56, 11 December 2024)
- ML20138K976 + (23:53:56, 11 December 2024)
- ML20138K973 + (23:53:57, 11 December 2024)
- ML20138K974 + (23:53:57, 11 December 2024)
- B11769, Forwards Addl Request for Deviations from Branch Technical Position Cmeb 9.5-1 Re Hose Stations,For Approval Per 850724 Commitment + (23:53:58, 11 December 2024)
- ML20138K971 + (23:53:58, 11 December 2024)
- ST-HL-AE-5571, Submits Suppl Info Re STP Proposed Improved TS + (23:53:59, 11 December 2024)
- ML20138K963 + (23:54:00, 11 December 2024)
- ML20138K960 + (23:54:01, 11 December 2024)
- ML20138K959 + (23:54:01, 11 December 2024)
- ML20138K958 + (23:54:02, 11 December 2024)