1 Osu.24 AMENDMENT OF SOLICJATION/ MODIFICATION OF CONTRACT

'^f 2

2. AME NDME N1/ MODI F I cal lON NO.
3. O fFCTIVE DATE
4. REQUISlil0N/ PURCHASE REQ. NO.
5. PROJECT NO.

FFE O e ic87 (If applicable)

RES-C97-003

6. ISSUED BY CODE
7. ADMINISTERED BY CODE I

(!f other than item 6)

US Nuclear Regulatory Commission DIvlsionofCuntracts/ Technical Acquisition Branch 1 Mail Stop i-712 Washington, DC 20555

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITAll0N NO.

Purdue Researth Foundation Attn: Ms. Debbie Clanpitt Office of Contract & Grant Business

98. DATED (SEE 11EM 11) 1063 Frederick L. Hovde Hall of Admin West Lafayette, IN 47907 10A. M001FICAflON OF CONTRACi/ ORDER NO.

Principal Investigator /Technicat X

NRC-04-93-049 Contacts Dr. Namoru Ishii 108. DATED (SEE ITEM 13)

CODE I FACIL!fY CODE

11. THis ITEM ONLY APPLIES 10 (MENDMENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers Q is extended, Q is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, cnd returning copier of the amendment; (b By acknowledging receipt of this amendment on each copy of the effer submitted or (c) By separate letter or te egram which includes a reference to the solicitation and amendment numbers. F AILUR$ OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FC.R THE RECElP10F OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED HAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendnent you desire to change an offer already submitted such change may be made by telegram or letter, provided each telegram or letter makes rraference to the solicitatlon and this amer *ent, and is received prior to the opening hour and date specified.
12. ACCOUNilNG AND APPROPRIAT10N DATA (If required)

B&R No. 76015122010 Job Code E2202 BOC: 252A APPN No. 31XO200.760 Amountobligaled: 1650,000.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS !$ SUED PURSUANT 10: (Specify authority) THE CHANGES SET FORTH IN 11EM 14 ARE MADE IN 1HE CONTRACT ORDER NO IN ITEM 10A.

B. THE ABOVE NUMBERED CON 1RACT/ ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying j

of fice, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

i C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

By mutual agreement of the parties.

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor O is not.

E is required to sign this document and return 2 copics to the issuing office.

14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)

Please see the attached page.

%' ' Ch I 200004 Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed remains unchen,g d and in full force and effect.

154. WAME AND fliLE OF SIGNER (1ype or print) 16A. NAME AND TITLE OF CONTRAC11N OFFICER (Type or print)

Loul5 Pellegrino. OlrectOF MarvA1. Mace

/

011ic,e Of Sponsored Programs Contifacting A icy 7 /g

__'1 TR F ROR 15C. DATE SIGNED 168. U

.R 16C. DATE SIG ED (Sig6atu e o person a6th ed to sign)

Sign 6 re of/ Cont / acting 0fficer)

~

NSN 7540-01-152-8070 30-105 l

STANDARD FORM 30 (REV.10 83)

P.,EVIOUS EDITION UNUSABLE Prescribed by CSA FAR (48 CFR) 53.243 9702200046 970204 PDR CONTP NRC.04-93-049 PDR

_ ~_ __

NRC-04-93-049 Modification No. 9 Page 2 of 2 g,,y g

The purpose of this modification is to (1) shorten the project title.

[

Y/

(2) increase the contract ceiling by $650.000 from $4.049.416 to $4.699.41 (3) provide incremental funding in the amount of $650.000 which increases the obligated amount from $3.635.000 to 54.285.000. (4) revise Task 5 under subsection C.1.3.5 for a within scope change, and (5) extend the period of performance.

The contract is therefore modified as follows:

1.

Section B.1. PROJECT TITLE is shortened from " Confirmatory Integral System Testing for the GE SBWR Design" to " Confirmatory Integral System Testing."

2.

Section B.3 CONSIDERATION AND OBLIGATION--COST REIMBURSEMENT (JUN 1988) is deleted in its entirety and replaced with the following:

under this contract is -54,t)9A16.

pgigygrppttl for full performance

"(a) The total estimated cost to "

S4, W 4IG.

y Theamountpresentlyobligated[mjthe'j (c[mentwithrespectto (b) w k

this contract is $4.285.000."

)

3.

This modification arovides for a within scope change to the Statement of Work in accordance wit 1 the contractor's proposal dated November 15, 1996. As a result, the following change is hereby made to subsection C.1.3.5. Scope of j

Work:

Revise Task 5 under Phase III in accordance with the attached modification to l

the Statement of Work.

4.

Section F.6. DURATION OF CONTRACT PERIOD (MAR 1987) is deleted in its entirety and replaced with the following:

"This contract shall commence on July 26. 1993 and will expire on 4

December 29, 1997."

A sunmary of obligations for this contract, from date of award through the date of this action. is given below:

Total FY93 Obligation:

$ 465.000.00 Total FY94 Obligations:

12.570.000.00 Total FY95 Obligations:

5 600.000.00 Total FY96 Obligations:

$ Total FY97 Obligations:

5 650.000.00 Cumulative Total NRC Obligations:

$4.285.000.00 i

This modification obligates FY97 funds in the amount of $650.000.00.

All other terms and conditions, including the ceiling amount of ?4,C79,415.00, remain the same.

h,M9,M,@

INITIAL HUME W

\\

s

\\

l i

i

)

0FFICE OF NUCLEAR REGULATORY RESEARCH DIVISION OF SYSTEMS TECHNOLOGY MODIFICATION TO NRC-04-93-049 i

Revise the Contract No. NRC-04-93-049. dated July 26. 1993, to reflect the revision to Task 5 identified below.

The separate effects test outcomes need 1

further validation in order to reach definite conclusions.

Task 5 Perform the following separate-effects tests:

(1) single-phase natural circulation tests in the RPV. a total of approximately 10 tests by varying j

core power. pressure. temperature, water level, and heat sink (ICS): (2) two-j phase natural circulation tests in the RPV a total of approximately 20 tests and (3) SRV condensation in the sup)ression pool tests, a total of i

approximately 10 tests by varying t1e steam pressure, temperature flow rate, and suppression pool water temperature.

Perform analysis of the test results.

This work was initiated on December 30, 1996 and should be completed by December 29. 1997.

Submit a letter report detailing the results of the analysis of the test results.