Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151Q482 + (10:32:39, 11 December 2024)
- ML20151Q477 + (10:32:40, 11 December 2024)
- ML20151Q475 + (10:32:44, 11 December 2024)
- ML20151Q474 + (10:32:45, 11 December 2024)
- ML20151Q470 + (10:32:45, 11 December 2024)
- ML20151Q468 + (10:32:46, 11 December 2024)
- PNO-I-88-079, on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied + (10:32:47, 11 December 2024)
- IR 05000423/1988003 + (10:32:48, 11 December 2024)
- ML20151Q452 + (10:32:49, 11 December 2024)
- ML20151Q448 + (10:32:49, 11 December 2024)
- ML20151Q447 + (10:32:50, 11 December 2024)
- ML20151Q443 + (10:32:51, 11 December 2024)
- ML20151Q437 + (10:32:52, 11 December 2024)
- ML20151Q432 + (10:32:53, 11 December 2024)
- ML20151Q428 + (10:32:54, 11 December 2024)
- B12982, Responds to 880707 Request for Addl Info Re Spent Fuel Pool Capacity Expansion + (10:32:55, 11 December 2024)
- ML20151Q415 + (10:32:56, 11 December 2024)
- ST-HL-AE-2694, Submits Description of Rev to FSAR Section 14.2 on Initial Startup Test Program,Deleting Test 27, Static Rcca Drop & Rcca Below-Bank Position Measurement Test + (10:32:57, 11 December 2024)
- ML20151Q405 + (10:32:58, 11 December 2024)
- ML20151Q401 + (10:32:59, 11 December 2024)
- ML20151Q403 + (10:32:59, 11 December 2024)
- ML20151Q397 + (10:33:00, 11 December 2024)
- 05000327/LER-1987-001-01, Informs of Complete Implementation of Recurrence Control Commitment Re LER 87-001-01, Trip Setpoint for Acbs on Shutdown Boards That Feed Control & Auxiliary Bldg Vent Boards Incorrect Due to Design Error + (10:33:03, 11 December 2024)
- ML20151Q379 + (10:33:05, 11 December 2024)
- ML20151Q383 + (10:33:05, 11 December 2024)
- ML20151Q376 + (10:33:06, 11 December 2024)
- ML20151Q374 + (10:33:07, 11 December 2024)
- 05000344/LER-1988-022, :on 880704,Train a Safety Injection Initiated During Plant Heatup.Caused by Spurious Electronic Spike on One Pressurizer Pressure Channel Generated When Test Switch Placed in Test.Troubleshooting Conducted + (10:33:08, 11 December 2024)
- PNO-I-88-057D, on 880624,order Issued to Neutron Products Re Inadequate Monitoring of Workers Leaving Restricted Area.As of 880802,almost All Offsite Contamination Surveys Complete. Small Fixed Contamination Noted on Employee Mattress + (10:33:10, 11 December 2024)
- ML20151Q362 + (10:33:11, 11 December 2024)
- ML20151Q359 + (10:33:12, 11 December 2024)
- ML20151Q352 + (10:33:12, 11 December 2024)
- ST-HL-AE-2627, Discusses Highlights from 880405 Meeting Re as-built Reconciliation Program.Adequate Info Provided for NRC to Confirm That Design & Const Program Incorporated Features Per IE Bulletin 79-14 + (10:33:13, 11 December 2024)
- ML20151Q348 + (10:33:14, 11 December 2024)
- 05000366/LER-1988-004, :on 880120,failure of Primary Containment Isolation Sys Penetrations & Hatches to Meet Tech Spec Leakage Requirements Determined.Caused by Normal Equipment Use & Wear.Affected Valves Replaced + (10:33:16, 11 December 2024)
- ML20151Q344 + (10:33:17, 11 December 2024)
- 05000341/LER-1988-014, :on 880320,Div I Emergency Diesel Generators Inadvertently Started.Caused by Procedural Error.Revs Issued Which Corrected Sequence of Steps + (10:33:18, 11 December 2024)
- 05000366/LER-1988-009, :on 880321,local Leak Rate Test Missed Resulting in Condition Prohibited by Tech Specs.Caused by Personnel Error.Test Performed & Penetrations Declared Operable + (10:33:20, 11 December 2024)
- TXX-8838, Final Deficiency Rept CP-88-29 Re Feedwater split-flow Bypass Valves (Fsbvs).Initially Reported on 880323. Westinghouse Requested to Perform Evaluation of Fsbv. Corrective Actions Scheduled for Completion by 881031 + (10:33:21, 11 December 2024)
- ML20151Q338 + (10:33:22, 11 December 2024)
- ML20151Q335 + (10:33:23, 11 December 2024)
- ML20151Q328 + (10:33:24, 11 December 2024)
- ML20151Q333 + (10:33:24, 11 December 2024)
- ML20151Q325 + (10:33:25, 11 December 2024)
- ML20151Q322 + (10:33:26, 11 December 2024)
- ML20151Q319 + (10:33:27, 11 December 2024)
- ML20151Q317 + (10:33:27, 11 December 2024)
- ML20151Q311 + (10:33:29, 11 December 2024)
- ML20151Q309 + (10:33:29, 11 December 2024)
- ML20151Q308 + (10:33:31, 11 December 2024)
- TXX-1014, Discusses Engineering Contractor & Util Engineering Responsibilities & Organizational Structure + (10:33:32, 11 December 2024)