b August 1,1988 Docket No. 50-458 Gulf States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)
Post Office Box 220 St. Francisville, Louisiana 70775
Dear Mr. Deddens:
SUBJECT:
FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM -
RIVER BEND STATION, UNIT NO. 1 (TAC N0. 62971)
By letter dated October 20, 1987, the NRC staff forwarded its safety evaluation regarding the River Bend Station first ten-year inscryice inspection program. The staff concluded that your program was acceptable and incompliancewiththerequirementsof10CFR50.55a(g)(4).
Gulf States Utilities (GSU) identified ASME Section 11 Code requirements that were determined to be impractical to perfonn at River Bend Station. The NRC's October 20, 1987 Safety Evaluation did not grant relief for the examination of Category B-A welds in the reactor pressure vessel. GSU requested reconsideration of these relief requests. Accordingly, the NRC staff and its contractor, Idaho National Engineering Laboratory, met with GSU representatives i
on February 17-18, 1988,at the River Bend Station to review the requests and the examination procedures for the reactor pressure vessel.
Based on its review, the staff concurs with the determination made by GSU that ASME Code requirements for Category B-A welds in the reactor pressure vessel are impractical to perform at the River Bend Station, Unit 1.
The requested relief from the ASME Code requireirents for the examination of Category B-A welds in the reactor pressure vessel is granted pursuant to 10 CFR Section 50.55a(g)(6)(1). The staff's supplemental Safety Evaluation is enclosed.
Sincerely, Josek(Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION NRC & Local PDRs PD4 Reading L. Rubenstein Docket. File.
J. Calvo W. Paulson P. Noonan F Litton E. Jordan Partlow ACRS (10)
Plant File OGC-WFN PDIV:D{l%
- See previous concurrences:
PDIV:LA*
PDIV:PM*
C l
PNoonan Paulson:kb JCalvo O
I 07/12/88 07/11/88 0
/88 (F/ /88
.hI I $E get1o161esoso3 p
ADOCK 05000458 PDC
c-i 1
4 Docket No. 50-458 Gulf States Utilities ATTN: Mr. James C. -Deddens SeniorVicePresident(RBNG)
Post Office Box 220 St. Francisville, Louisiana 70775
Dear Mr. Deddens:
SUBJECT:
FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM -
RIVER BEND STATION,-UNIT NO. 1 (TAC N0. 629/1) l By letter dated October 20, 1987, th.. NRC staff forwarded safety evaluation regarding the River Bend Station first ten-ye inservice inspection program. The staff concluded that your pro am was acceptable and in compliance with the requirements of 10 CFR 50.55a (4).
Gulf States Utilities (GSU) identified ASME Secti i 11 Code requirements that were determined to be impractical to perform at iver Bend Station. The NRC's October 20, 1987 Safety Evaluation did not gra relief for the examination of Category B-A welds in the reactor pressur vessel.
GSU requested reconsideration of these relief requests.
cordingly, the NRC staff and its j
contractor, Idaho National Engineering La ratory, met with GSU representatives on February 17-18, 1988 at the River Ben Station to review the requests and 1
the examination procedures for the rea or pressure vessel.
Based on its review, the staff concu s with the determination made by GSU that i
ASME Code requirements for Category /B-A welds in the reactor pressure vessel are impractical to perform at the/ River Bend Station, Unit 1.
The staff's supplemental Safety Evaluation 14 enclosed.
Sincerely, Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
/
Enclosure:
As stated
/
/
cc w/enclosur_e':
See next page
/
DISTRIBUTION Docliet File NRC & Local PDRs PD4 Reading L. Rubenstein f
J. Calyo W. Paulson P. Noonan F. Litton E. Jo dan Partlow ACRS (10)
Plant File OGC-WFN 1
PNoona @n' p P
Pp V:L OGC PDIV:D P ulson:kb JCalvo
/07//j/88 07/d/88 07/ /88 07/ /88 i
,-,-y
-,e&-e y-g*p wg-y t-'T--t
-gT---git g e-
+*~&
'-T"
T'
T' I
1 August 1,1988 l
Docket No. 50-458 Gulf States Utilities ATTN: Mr. James C. Deddens SeniorVicePresident(RBNG)
Post Office Box 220 St. Francisville, Louisiana 70775
Dear Mr. Deddens:
SUBJECT:
FIPST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM -
RIVER BEND STATION, UNIT N0. 1 (TAC NO. 62971)
By letter dated October 20, 1987, the NRC staff forwarded its safety evaluation regarding the River Bend Station first ten-year inservice inspection program. The staff concluded that your program was acceptable and in compliance with the requirements of 10 CFR 50.55a(g)(4).
Gulf States Utilities (GSU) identified ASME Section 11 Code requirements that were determined to be impractical to perform at River Bend Station. The NRC's October 20, 1987 Safety Evaluation did not grant relief for the examination of Category B-A welds in the reactor pressure vessel.
GSU requested reconsideration of these relief requests. Accordingly, the NRC staff and its contractor, Idaho National Engineering Laboratory, met with GSU representatives on February 17-18, 1988 at the River Bend Station to review the requests and the examination procedures for the reactor pressure vessel.
Based on its review, the staff concurs with the determination made by GSU that ASME Code requirements for Category B-A welds in the reactor pressure vessel are impractical to perform at the River Bend Station, Unit 1.
The requested relief from the ASME Code requirerrents for the examination of Category B-A welds in the reactor pressure vessel is granted pursuant to 10 CFR Section 50.55a(g)(6)(1). The staff's supplemental Safety Evaluation is enclosed.
Sincerely, Jose k( Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation As stated cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC & Local PDRs PD4 Reading L. Rubenstein J. Calvo W. Paulson P. Noonan F. Litton E. Jordan Partlow ACRS (10)
Plant File OGC-WFN
- See previous concurrences:
PDIV:LA*
PDIV:PM*
C PDIV:D PNoenan Paulson:kb JCalvo 07/12/88 07/11/88 0
/88
@7 /88
&I fif
- o UNITED STATES g
I NUCLEAR REGULATORY COMMISSION g
{
wAsMNGTON, D. C. 20665
- g.....,/
August 1,1988 Docket No. 50-458 Gulf States Utilities ATTN: Mr. James C. Deddens SeniorVicePresident(RBNG)
Post Office Box 220 St. Francisville, Louisiana 70775
Dear Mr. Deddens:
SUBJECT:
FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM -
RIVER BEND STATION, UNIT NO. 1 (TAC NO. 62971)
By letter dated October 20, 1987, the NRC staff forwarded its safety evaluation regarding the River Bend Station first ten-year inservice inspection program. The staff concluded that your program was acceptable and in compliance with the requirements of 10 CFR 50.55a(g)(4).
Gulf States Utilities (GSU) identified ASME Section 11 Code requirements that were detemined to be impractical to perfom at River Bend Station. The NRC's October 20, 1987 Safety Evaluation did not grant relief for the examination of Category B-A welds in the reactor pressure vessel. GSU requesteo reconsideration of these relief requests. Accordingly, the NRC staff and its contractor Idaho National Engineering Laboratory, met with GSU representatives on February 17-18, 1988 at the River Bend Station to review the requests and the exarr.ination procedures for the reactor pressure vessel.
Based on its review, the staff concurs with the detemination made by GSU that ASME Code requirements for Category B-A welds in the reactor pressure vessel are impractical to perform at the River Bend Station, Unit 1.
The requested relief from the ASME Code requirements for the examination of Category B-A welds in the reactor pressure vessel is granted pursuant to 10 CFR Section 50.55a(g)(6)(1). The staff's supplemental Safety Evaluation is enclosed.
Sincerely, g, bb Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
.------,--..-,~~,a-.
,,- e
--,e--s,e,
...,,+-w-,-.-
-,~,,e.rv,,-,,,.wer,,w r,
,w-m,,-,a,wn,,~,-~,~,-eny-wg.p.
,.,w,
Mr. James C. Deddens Gulf States Utilities Company River Bend Nuclear Plant cc:
Troy B. Conner, Jr., Esq.
Mr. J. E. Booker Conner and Wetterhahn Manager-River Bend Oversight 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.
20006 Beaumont, TX 77704 Mr. Les England Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Troy, Jr., Esq.
Assistant Attorney General in Charge Mr. J. David McNeill, Ill State of Louisiana Department of Justice William G. Davis, Esq.
234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office 7434 Perkins Road Resident Inspector Baton Rouge, Louisiana 70808 P. O. Box 1051 St. Francisv111e, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive Gretchen R. Rothschild-Reinike Baton Rouge, Louisiana 70806 Louisianians for Safe Energy, Inc.
2108 Broadway Street New Orleans, Louisiana 70118-5462 President of West Feliciana Police Jury Regional Administrator, Region IV P. O. Box 1921 U.S. Nuclear Regulatory Commission St. Francisville, Louisiana 70775 Office of Executive Director for Operations Mr. Frank J. Uddo 611 Ryan Plaza Drive, Suite 1000 Uddo & Porter Arlington, Texas 76011 6305 Elysian Fields Avenue Suite 400 Philip G. Harris New Orleans, Louisiana 70122 Cajun Electric Power Coop. Inc.
10719 Airline Highway P. O. Box 15540 Baton Rouge, LA 70895