Advises That Rev 31 to 880331 Emergency Plan Appears to Meet Planning Stds of 10CFR50.47(b) & App E to 10CFR50 & Acceptable
ML20151Q474
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/25/1988
From: Mccoy F
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8808110173
Download: ML20151Q474 (2)


Text

- _ --------

O$1Dk-s JUL 2 51988 Te3nessee Valley Authority CATTN: Mr. S. A. White Senior Vice President, Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

SEQU0YAH EMERGENCY PLAN REVIEW, REVISION 31, DOCKET NOS, 50-327 AND 50-328 We have completed our review of Revision 31 to your Sequoyah Emergency Plan dated March 11, 1988. Our review indicates that the changes appear to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission. However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with trie requirements of 10 CFR 50, Appendix E, Section V.

Should you nave any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2559.

Sincerely, Frank R. McCoy, Assistant Director for Inspection Programs, TVA Projects Division Office of Special Projects cc:

(See page 2)

$$h kD F

9 i

ar

Tennessee Valley Authority 2

y L. Abercrombie, Site Director cc:

Sequoyah Nuclear Plant F A. Kirkebo, Director, Nuclear Engineering S< L. Gridley, Director Nuclear Safety and Licensing

()k R. Harding, Site Licensing Manager

-TVA Representative, Rockville Office bec: J. N. Grace, RII ak G. Partlow, OSP (p D. Richardson, OSP W. Black, OSP JK D. Liaw, OSP K. P. Barr, OSP/RII J. B. Brady, OSP/RII MJ.Rutberg,0GC M C Resident Inspector DRS, Technical Assistant NRC Document Control Desk State of Tennessee RII RII RII RII RII RJ I Aho nd:es TD c r D

r o rady B rr 7//. 88 7/%/88 7/74/88 7/#/88 7/gg/88 7/;j/88