Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151Q649 + (10:31:51, 11 December 2024)
- IR 05000369/1988019 + (10:31:52, 11 December 2024)
- ML20151Q642 + (10:31:53, 11 December 2024)
- BECO-88-025, Discharge Monitoring Rept for Jan-Mar 1988 + (10:31:54, 11 December 2024)
- ML20151Q636 + (10:31:55, 11 December 2024)
- ML20151Q634 + (10:31:55, 11 December 2024)
- ML20151Q631 + (10:31:56, 11 December 2024)
- ML20151Q627 + (10:31:57, 11 December 2024)
- ML20151Q620 + (10:31:58, 11 December 2024)
- ML20151Q624 + (10:31:58, 11 December 2024)
- ML20151Q615 + (10:31:59, 11 December 2024)
- BSEP-88-0378, Discusses Util Reconsideration of Commitment to Reduce Low Level 2 Water Level Setpoint Provided in 871013 Updated Status of Facility Strategy for Avoiding Partial Low Level 2 Initiations/Isolation on Scrams + (10:32:00, 11 December 2024)
- ML20151Q613 + (10:32:00, 11 December 2024)
- 05000293/LER-1988-018, :on 880705,full Scram Signal Occurred.Caused by Procedure Weakness & Previous Administrative Controls That Were Not Entirely Adequate for Previous Changes Made to Procedure.Procedure Revised + (10:32:02, 11 December 2024)
- ML20151Q607 + (10:32:03, 11 December 2024)
- PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies + (10:32:04, 11 December 2024)
- ML20151Q602 + (10:32:05, 11 December 2024)
- ML20151Q599 + (10:32:06, 11 December 2024)
- ML20151Q593 + (10:32:06, 11 December 2024)
- ML20151Q581 + (10:32:08, 11 December 2024)
- ML20151Q577 + (10:32:08, 11 December 2024)
- ML20151Q575 + (10:32:09, 11 December 2024)
- ML20151Q572 + (10:32:10, 11 December 2024)
- ML20151Q565 + (10:32:11, 11 December 2024)
- ST-HL-AE-2695, Informs That More Definitive Test of Negative Flux Rate Trip Performed on Both Four & Three Loop Plants W/Rod Worths Significantly Less than Max Worth Noted in WCAP-10298, Resulting in Indication of No Reactor Trip + (10:32:11, 11 December 2024)
- ML20151Q561 + (10:32:12, 11 December 2024)
- ML20151Q558 + (10:32:13, 11 December 2024)
- 05000327/LER-1987-078, :on 871221,inadequate Procedure for RCS Chemical Addition Resulted in Noncompliance W/Tech Spec Action Statement.Procedures Revised to Provide Instructions for RCS Chemical Addition + (10:32:15, 11 December 2024)
- ML20151Q552 + (10:32:16, 11 December 2024)
- ML20151Q550 + (10:32:17, 11 December 2024)
- ML20151Q546 + (10:32:18, 11 December 2024)
- BSEP-88-0405, Forwards Revs to Emergency Procedures,Including Rev 4 to PEP-2.6.1 Re Plant Operations Director & Rev 1 to PEP-02.6.22 Re Technical Assessment Director.List of Revs to Procedures Encl.W/O Procedures + (10:32:19, 11 December 2024)
- ML20151Q541 + (10:32:20, 11 December 2024)
- ML20151Q538 + (10:32:20, 11 December 2024)
- ML20151Q528 + (10:32:21, 11 December 2024)
- ML20151Q524 + (10:32:22, 11 December 2024)
- ML20151Q521 + (10:32:23, 11 December 2024)
- ML20151Q517 + (10:32:23, 11 December 2024)
- 05000366/LER-1988-006-01, :on 880318,unplanned Scram Occurred & Main Steam Line Isolation Valve Failed to Close.Scram Caused by Deficiency in Procedure.Cause of Valve Failure Unknown. Procedure Rev Issued + (10:32:25, 11 December 2024)
- ML20151Q511 + (10:32:26, 11 December 2024)
- ML20151Q509 + (10:32:27, 11 December 2024)
- ML20151Q507 + (10:32:28, 11 December 2024)
- 05000382/LER-1988-005, :on 880321,blown Undervoltage Circuit Fuse Replacement Results in Tech Spec 3.0.3 Entry.Caused by Inadvertent Shortening of Two Wire Connections.Change to Tech Spec Being Pursued to Correct Deficiency + (10:32:30, 11 December 2024)
- ML20151Q500 + (10:32:31, 11 December 2024)
- ML20151Q496 + (10:32:32, 11 December 2024)
- ML20151Q492 + (10:32:32, 11 December 2024)
- ML20151Q491 + (10:32:33, 11 December 2024)
- 05000341/LER-1988-024, :on 880705,isolation of HPCI During Performance of Functional Test Occurred.Caused by Personnel Error. Surveillance Successfully Performed on Same Day & Accountability Meeting Held W/Individual + (10:32:35, 11 December 2024)
- 05000370/LER-1986-001, :on 860115,reactor Trip on lo-lo Steam Generator Level Occurred.Caused by Reducted Main Feedwater Flow After Pump Turbine Tripped on Low Condenser Vacuum. Plant Stabilized & Vacuum Inspected/Repaired + (10:32:37, 11 December 2024)
- ML20151Q485 + (10:32:38, 11 December 2024)
- ML20151Q483 + (10:32:39, 11 December 2024)