Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151U437 + (09:59:02, 11 December 2024)
- ML20151U436 + (09:59:03, 11 December 2024)
- ML20151U435 + (09:59:03, 11 December 2024)
- ML20151U434 + (09:59:04, 11 December 2024)
- ML20151U432 + (09:59:04, 11 December 2024)
- ML20151U429 + (09:59:05, 11 December 2024)
- ML20151U427 + (09:59:06, 11 December 2024)
- ST-HL-AE-1605, Forwards Updated Schedule for Remaining Equipment Qualification Tests + (09:59:06, 11 December 2024)
- ML20151U423 + (09:59:07, 11 December 2024)
- ML20151U425 + (09:59:07, 11 December 2024)
- IR 05000266/1988008 + (09:59:08, 11 December 2024)
- ML20151U422 + (09:59:08, 11 December 2024)
- 05000295/LER-1988-015-05, :on 880715,Edison Sys Grid Voltage Experienced Degradation Due to Unusually High Load Demand.Caused by Sys Grid Voltage Degradation.Diesel Generator Secured & Bus 147 Restored + (09:59:12, 11 December 2024)
- ML20151U416 + (09:59:13, 11 December 2024)
- ML20151U414 + (09:59:13, 11 December 2024)
- 05000369/LER-1988-005-02, :on 880323,during Monthly Functional Test,Train a Safety Injection & Main Steam Sys Isolation Resulted in Reactor Trip.Cause Undetermined.New Procedures Implemented + (09:59:15, 11 December 2024)
- ML20151U411 + (09:59:16, 11 December 2024)
- ML20151U410 + (09:59:16, 11 December 2024)
- ML20151U408 + (10:00:24, 11 December 2024)
- ML20151U405 + (10:00:25, 11 December 2024)
- ML20151U407 + (10:00:25, 11 December 2024)
- ST-HL-AE-1603, Advises That Process Control Program,Revised to Include NRC Draft Guidelines,Will Be Submitted by 861101,after Signing of Contract W/Waste Solidification Vendor + (10:00:26, 11 December 2024)
- ST-HL-AE-2587, Responds to NRC Re Violations Noted in Insp Rept 50-499/88-16.Corrective Actions:Startup Mgt Holding Group Meetings W/Engineers & Technicians to Reiterate Requirements Re Temporary Alterations + (10:00:26, 11 December 2024)
- ML20151U400 + (10:00:27, 11 December 2024)
- ML20151U401 + (10:00:27, 11 December 2024)
- ML20151U399 + (10:00:28, 11 December 2024)
- ML20151U398 + (10:00:29, 11 December 2024)
- ML20151U397 + (10:00:29, 11 December 2024)
- ML20151U396 + (10:00:30, 11 December 2024)
- ML20151U394 + (10:00:30, 11 December 2024)
- ML20151U393 + (10:00:31, 11 December 2024)
- W3P88-1259, Clarifies Basis for Bypassing Low RCS Flow Trip Below 1.0E-04% Full Reactor Power.Supports Installation of Low Primary Coolant Flow Trip Bypass + (10:00:31, 11 December 2024)
- ML20151U391 + (10:00:32, 11 December 2024)
- IR 05000315/1986002 + (10:00:42, 11 December 2024)
- ML20151U389 + (10:00:43, 11 December 2024)
- ML20151U387 + (10:00:44, 11 December 2024)
- ML20151U388 + (10:00:44, 11 December 2024)
- ML20151U386 + (10:00:45, 11 December 2024)
- IR 05000254/1986001 + (10:00:46, 11 December 2024)
- ML20151U384 + (10:00:46, 11 December 2024)
- ML20151U379 + (10:00:47, 11 December 2024)
- ML20151U380 + (10:00:47, 11 December 2024)
- LIC-98-0067, Forwards Updated Pages of TS Bases of Sections Listed & Requests That NRC Adminstratively Incorporate Pages Into Master Copy of FCS TSs & Reissue Pages + (10:00:48, 11 December 2024)
- ML20151U377 + (10:00:48, 11 December 2024)
- ML20151U376 + (10:00:49, 11 December 2024)
- ML20151U373 + (10:00:50, 11 December 2024)
- ML20151U374 + (10:00:50, 11 December 2024)
- IR 05000285/1987024 + (10:00:51, 11 December 2024)
- ML20151U370 + (10:00:51, 11 December 2024)
- W3P88-1362, Informs of Util Intent to Take Credit for Technical Justification Provided in CEN-367, Leak-Before-Break Evaluation of Primary Coolant Loop Piping in C-E Designed Nsss + (10:00:52, 11 December 2024)
- ML20151U369 + (10:00:52, 11 December 2024)