ML20151U427
| ML20151U427 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/11/1988 |
| From: | Mallett B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML20151U431 | List: |
| References | |
| NUDOCS 8808190087 | |
| Download: ML20151U427 (2) | |
See also: IR 05000346/1988022
Text
D C-D
'
[ "p l l A 7 Y
M [ A n fylA T M
U Un
\\ su
ei
v.s....
..
m.,
a -
i
AU G 1 1 1983
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Donald Shelton
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safeguards inspection conducted by
Ms. G. M. Christoffer of this office on July 25-29, 1988, of activities
at Davis-Besse Nuclear Power Station authorized by NRC Operating License
No. NPF-3 ar;d to the discussion of our findings with Mr. L. Storz and
cther members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
Additiona.lly, you are requested to submit certain information
regarding the open item described in Section 5 of the enclosed report.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21.
Consequently, the enclosure
to this letter, our report of the inspection, and your response to the
violation identified in the enclosure to this letter will not be placed in
the NRC Public Document Room.
Therefore, your statement of corrective action
regarding the violation identified in the enclosure should be submitted as
a separate enclosure to your transmittal letter in the manner prescribed.
y
b/
'(/
I
/
Ni
\\
.
8808190087 880811
ADOCK 05000346
Enclosure contains
,
0
PNU
SAFEGUARDS INF0PJMTION
Upon separation this
para is Decontrolled
$ n e r m,, nr a
. . .
.
.
um cuun.mu wa vwmun
O trrm i a n ^ ^
'
i~-
-
^
mu w unl\\UU
lifUlH/liiI,'ON
.
-
.
Toledo Edison Company
2
AUG I I 1983
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Bruce S. Mallett, Ph.D., Chief
Nuclear Materials Safety and
Safeguards Branch
Enclosures:
1.
2.
Inspection Report
No. 50-346/88022(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
L. Storz, Plant Manager
NRR/DRIS/SGB
NRR/DRIS/S1B
NRR/DLPQ/PEB
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
'
James W. Harris, State of Ohio
Robert M. Quillin, Ohio
Department of Health
State of Ohio, Public
1
Utilities Commission
s
Enclo:uro contains
SAFEGUARDS INFORMATI0,'(
Upon separation this
rego is Decontrolled
RIII
4
RIII
RI I
III
,hs
Gyll
~ ulk
b
Christoffer/ib
Qreed
DYyete
Mglig'tt
ofk0
240
S
E DUI
I
cu
-
n i
--
7,u n
y
un