ML20151U437

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept CP-88-11 Re Battery Charger Overheating.Initially Reported on 880111.Based on Vendor Recommendation,Util Proposed Mod to Chargers Placed on Hold Until Further Testing Completed.Next Rept by 880624
ML20151U437
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/26/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-11, TXX-88369, NUDOCS 8805020059
Download: ML20151U437 (2)


Text

-

== .

""" 9 Log # TXX-88369

= File # 10110 C Z 908.3 7UELECTR/C Ref. # 10CFR50.55(e)

April 26, 1988

%!!Unm G. roundl bruertw he besarn:

V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 SUBJECI: COMAtlCHEPEAKSTEAMELECTRICSTAT10ft(CPSES)

DOCKET fl05. 50-445 AND 50-446 BATTERY CHARGER OVERitEATING SDAR: CP-88-11 (INTERIM REPORT)

Gentlemen:

On January 11, 1988, we informed you via our report logged TXX-88070 of a reportable deficiency involving battery charger overheating. This is an interim report on the corrective action implementation schedule.

Corrective action, as stated in our last report (TXX-88070), and as irdicated in our Electrical Project Status Report (TXX-88097, dated January 15, 1988),

involved the installation of permanent fans or other cooling devices to service Battery Chargers BCIEDl-1 and BCIE01-2. Subsequent to our last report, however, the battery charger vendor's site representative has also completed an evaluation of the chargers and indicated that no overheating problem was evident and recommended against installing cooling fans (due to dirt accumulation / fan failure problems). Based on the vendor's recommendation, our proposed modification to the chargers has been placed on hold until further testing can be completed.

Our evaluation of this deficiency with the vendor is still in progress and is not sufficiently developed to allow setting of a completion schedule for corrective actions at this time, in light of the vendor's evaluation, we are also re-evaluating our reportability conclusion for this issue.

~5005020059 880426 PDR ADOCK 05000445 e S DCD 3 0

M bra lbs Street i B 81 Dalk. Te s.n 7.1.'01

TXX-88369 April 26, 1988 Page 2 of 2 Our next report on this issue will be submitted no later than June 24, 1983.

Very truly yours,

-(0 W. G. Counsil By:

D. R. Woodlan Docket Licensing Manager WJil/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) l l