Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN048603, 1985 Annual Environ Radiological Monitoring Rept for Arkansas Nuclear One Units 1 & 2 + (16:25:48, 10 December 2024)
- ML20198E629 + (16:25:49, 10 December 2024)
- ML20198E628 + (16:25:50, 10 December 2024)
- ML20198E625 + (16:25:50, 10 December 2024)
- 05000269/LER-1986-006-03, :on 860410,hot Full Power Moderator Temp Coefficient Exceeded Assumed Limit.Caused by Disparity Between Measured Data & Calculated Value.Fsar Will Be Updated + (16:25:52, 10 December 2024)
- 05000269/LER-1998-017-01, :on 981128,missed Surveillance Was Noted.Caused by Inadequate Work Planning.Operations Mgt Expectations for Performance of Qpt SR Were Communicated to Appropriate Operations Personnel + (16:25:55, 10 December 2024)
- ML20198E618 + (16:25:56, 10 December 2024)
- ML20198E613 + (16:25:59, 10 December 2024)
- ML20198E611 + (16:25:59, 10 December 2024)
- ML20198E609 + (16:26:00, 10 December 2024)
- ML20198E603 + (16:26:01, 10 December 2024)
- ML20198E605 + (16:26:01, 10 December 2024)
- 3F1298-17, Notifies of Withdarawal of Topical Rept, Boron Dilution by RCS Hot Leg Injection, from NRC Review + (16:26:02, 10 December 2024)
- ML20198E599 + (16:26:02, 10 December 2024)
- ML20198E597 + (16:26:03, 10 December 2024)
- ML20198E595 + (16:26:07, 10 December 2024)
- ML20198E594 + (16:26:07, 10 December 2024)
- ML20198E593 + (16:26:09, 10 December 2024)
- ML20198E592 + (16:26:09, 10 December 2024)
- ML20198E589 + (16:26:10, 10 December 2024)
- ML20198E590 + (16:26:10, 10 December 2024)
- B11852, Forwards Addl Info Re Request for Deviation from Branch Technical Position Cmeb 9.5-1 & Revised Responses to Fire Protection Audit Open Items + (16:26:28, 10 December 2024)
- IR 05000289/1986002 + (16:26:28, 10 December 2024)
- ML20198E582 + (16:26:29, 10 December 2024)
- ML20198E585 + (16:26:29, 10 December 2024)
- ML20198E581 + (16:26:30, 10 December 2024)
- ML20198E580 + (16:26:31, 10 December 2024)
- ML20198E578 + (16:26:31, 10 December 2024)
- ML20198E577 + (16:26:32, 10 December 2024)
- ML20198E575 + (16:26:32, 10 December 2024)
- ML20198E574 + (16:26:33, 10 December 2024)
- PNO-III-85-093C, on 851106,licensee Submitted Request for Restart Concurrence,Per 851030 Confirmatory Action Ltr.Insp & Testing of Reactor Trip Breakers Completed.Failed Breakers Shipped to Vendors for Testing & Evaluation + (16:26:34, 10 December 2024)
- ML20198E569 + (16:26:36, 10 December 2024)
- ML20198E566 + (16:26:37, 10 December 2024)
- ML20198E567 + (16:26:37, 10 December 2024)
- RBG-23671, Special Rept:On 860301,actuation of Div III ECCS Occurred Following Unit Scram.Caused by Feedwater Pump Trip Due to Voltage Transient in Associated 13.8-kV Switchgear. Evaluation Continuing + (16:26:38, 10 December 2024)
- ML20198E561 + (16:26:39, 10 December 2024)
- ML20198E562 + (16:26:39, 10 December 2024)
- ML20198E559 + (16:26:40, 10 December 2024)
- ML20198E558 + (16:26:41, 10 December 2024)
- 05000458/LER-1986-033, :on 860426,reactor Scrammed Due to Combination of Planned half-scram from Surveillance Test & Unplanned half-scram.Caused by Blown Fuse in Reactor Protection Sys. Fuse Replaced + (16:26:42, 10 December 2024)
- ML20198E555 + (16:26:43, 10 December 2024)
- ML20198E553 + (16:26:44, 10 December 2024)
- ML20198E552 + (16:26:45, 10 December 2024)
- ML20198E550 + (16:26:45, 10 December 2024)
- IR 05000508/1985006 + (16:26:47, 10 December 2024)
- ML20198E547 + (16:26:48, 10 December 2024)
- 05000413/LER-1986-022, :on 860419,reactor Tripped During Venting of High Pressure Line to RCS Loop C Flow Transmitter.Caused by Defective Procedures.Procedures IP/1/A/3222/15A,B & C Revised + (16:26:49, 10 December 2024)
- ML20198E545 + (16:26:50, 10 December 2024)
- PNO-III-85-094, on 851107,bypass Reactor Trip Breaker B Failed to Operate During Performance of Tests Per IE Bulletin 85-002.Cause Not Stated.Plant Restored to Condition in Which Both Main Reactor Trip Breakers Operable + (16:26:51, 10 December 2024)
- ML20198E543 + (16:26:52, 10 December 2024)
- 05000275/LER-1986-005, :on 860422,opening Created in Fire Barrier W/O Establishing Continuous Fire Watch.Caused by Misinterpretation of Const Requirements by Plant Fire Protection Personnel.Procedure Revised + (16:26:53, 10 December 2024)