MAY 141986
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Report Nos. 50-277/86-08 and 50-278/86-08
This refers to the special safety inspection conducted by a team led by
Mr. A. Krasopoulos of this office on March 17-21, 1986 at Peach Bottom Units 2
and 3, Delta, Pennsylvania, of activities authorized by NRC License Nos. DPR 44
and DPR 56 and to the discussions of our findings held by Mr. A. Krasopoulos
with Mr. W. Ullrich of your staff at the conclusion of the inspection.
The purpose of this inspection was to evaluate your efforts toward full com-
pliance with the applicable requirements of 10 CFR 50, Appendix R.
Since full
compliance is not required until the end of the next refueling outage of Unit 2
and because a substantial part of the work involved is incomplete, a Confirma-
tory Action Letter was sent to you on April 11, 1986 describing our understand-
ing of your future actions in this area.
The areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures, analyses, repre-
sentative records, interviews with personnel, and observations by the team.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
.
Sincerely,
[2gggggg89
7
0
Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosure:
Combined NRC Region I Inspection Report
Numbers 50-277/86-08 and 50-278/86-08
0FFICIAL RECORD COPY
CIR PB 86-08 - 0001.0.0
05/09/86
'/
,
l
.
Philadelphia Electric Company
2
,
cc w/ encl:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
G. Leitch, Superintendent Nuclear Generation Division
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (FCR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
S. Pullani, DRS
RI: RS
RI:DRS
R DR
RI:DRS
jjAnderson/rw/mjd/ms
Durr
Johnston
Ebneter
'
5/8/86
5/f/86
5//2/86
5/h/86
0FFICIAL RECORD COPY
CIR PB 86-08 - 0002.0.0
05/06/86