Forwards Safety Insp Repts 50-277/86-08 & 50-278/86-08 on 860317-21.No Violation Noted.Confirmatory Action Ltr Sent on 860411 Describing NRC Understanding of Util Corrective Actions
ML20198E559
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/14/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20198E563 List:
References
NUDOCS 8605280056
Download: ML20198E559 (2)


See also: IR 05000277/1986008

Text

.

.

MAY 141986

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection Report Nos. 50-277/86-08 and 50-278/86-08

This refers to the special safety inspection conducted by a team led by

Mr. A. Krasopoulos of this office on March 17-21, 1986 at Peach Bottom Units 2

and 3, Delta, Pennsylvania, of activities authorized by NRC License Nos. DPR 44

and DPR 56 and to the discussions of our findings held by Mr. A. Krasopoulos

with Mr. W. Ullrich of your staff at the conclusion of the inspection.

The purpose of this inspection was to evaluate your efforts toward full com-

pliance with the applicable requirements of 10 CFR 50, Appendix R.

Since full

compliance is not required until the end of the next refueling outage of Unit 2

and because a substantial part of the work involved is incomplete, a Confirma-

tory Action Letter was sent to you on April 11, 1986 describing our understand-

ing of your future actions in this area.

The areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures, analyses, repre-

sentative records, interviews with personnel, and observations by the team.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

.

Sincerely,

[2gggggg89

7

0

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure:

Combined NRC Region I Inspection Report

Numbers 50-277/86-08 and 50-278/86-08

0FFICIAL RECORD COPY

CIR PB 86-08 - 0001.0.0

05/09/86

'/

,

l

.

Philadelphia Electric Company

2

,

cc w/ encl:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

G. Leitch, Superintendent Nuclear Generation Division

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (FCR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

S. Pullani, DRS

RI: RS

RI:DRS

R DR

RI:DRS

jjAnderson/rw/mjd/ms

Durr

Johnston

Ebneter

'

5/8/86

5/f/86

5//2/86

5/h/86

0FFICIAL RECORD COPY

CIR PB 86-08 - 0002.0.0

05/06/86