ML20198E613

From kanterella
Jump to navigation Jump to search
Notification of 980112-13 Meeting W/Nuclear Energy Institute (NEI) in Miami,Florida to Discuss Licensing Issues,Including Proposed Industry Guidance for Implementation of 10CFR50.59 & 10CFR50.71(e)
ML20198E613
Person / Time
Issue date: 12/30/1997
From: Mckenna E
NRC (Affiliation Not Assigned)
To: Essig T
NRC (Affiliation Not Assigned)
References
PROJECT-689 NUDOCS 9801090165
Download: ML20198E613 (6)


Text

.- - . _

Decembsr 30, 1997

< MEMORANDUM TO: Thom:s H. Essig, Acting Chi;f Generic issues cnd Environm:nt:1 Proj; cts Branch l Division of Reactor Program Management, NRR FROM: Eileen M. McKenna, Senior Reactor Engineer Original Signed By:

Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)

DATE AND TIME: January 12 13,1998 8:30 a.m. - 5 p.m. and 8:30 a.m. to noon LOCATION: Biscayne Bay Marriott Hotel 1633 North Bayshore Drive Miami, Florida PURPOSE: To participate in NEl-sponsored workshop with utility representatives for discussions concerning licensing issues, including proposed industry guidance for implementstion of 10 CFR 50.59 and 10 CFR 50.71(e) (See attached preliminary agenda).

PARTICIPANTS: NRG NEl F. Miraglia R. Beedle F. Akstulewicz A. Pietrangelo T. Bergman R. Bell E. McKenna D. Walters, et al.

Project No. 689 cc: See next page

' Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, retitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy U;atement on Staff Meeting Open to the Public," 59 E.ederal Reaister 48244,9/20/94. The workshop is being sponsored by NEl and is open to the public. Members of the public who wish to attend should contact Nicki Rocco at NEl for workshop registration information. (Phone (202) 739-8014, or ngr@nei.org).

Distribution: See next page

' DOCUMENT: G:\emm\mtg0112.not OFFICE PGEBg g I SC:PGEB kh NAME EMcKenna FAkstulewick DATE '12/ 3 /97 126D/97 - h r

a 1.1 E. .ll.ll.lll.l l.l l.l g

9e0109o16s 97123o PDR REVQP ERONUMRC E 6 $ C @-g gg PDR f( & $( , IN. DT

i

, i

, pn cacg j UNITED STATES

(

[ '4 j' NUCLEAR REGULATORY COMMISSION

s

'o g WASHINGTON, D.C. 30046 4 001 )

% l 4*****/ l December 30,1997 MEMORANDUM TO: Thomas H. Essig, Acting Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management, NRR FROM: Eileen M. McKenna, Senior Reactor Engineer bA lhh Generic lasues and Environmental Projects Branch Division of Reactor Program Management, NRR

SUBJECT:

NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEl)

DATE AND TIME: January 12-13,1998 8:30 a.m. - 5 p.m. and 8:30 a.m. to noon LOCATION: Biscayne Bay Marriott Hotel 1633 North Bayshore Drive Miami, Florida PURPOSE: To participate in NEl sponsored workshop with utility representatives for discussions concerning licensing issues, including proposed industry guidance for implementation of 10 CFR 50.59 and 10 CFR 50.71(e) (See I attached preliminary agenda).

PARTICIPANTS: NRC NEl F. Miraglia R. Beedle F. Akstulewicz A. Pietrangelo T. Bergman R. Bell E. McKenna D. Walters, et al.

Project No. 689 cc: See next page l

l l Meetings between the NRC technical staff and applicants or licensees are open for interested l members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94. The workshop is being sponsored by NEl and is open to the public. Members of the public who wish to attend should contact Nicki Rocco at NEl for workshop registration information. (Phone (202) 739-8014, or ngr@nel.org).

- ~

1 LICENSING ISSUES WORKSHOP JANUARY 11,12 AND 13,1997 BISCAYNE BAY MARRIOTT MIAMI, FLORIDA PRELIMINARY PROGRAM SUNDAY, JANUARY 11 4:M PM 5:M PM Registration 6:00 PM 7:30 PM Welcoming Reception MONDAY,J ANUARY 12 7:30 AM Registratica and Continental Breakfast 8:30AM Introductory Remarks Mr. Astph #sedAe Sr. Vke PresidentandCNO NuclearEnergyinstitute 8:45 A M Workshop Overview Mr. Tony Pietrangelo, NE,1 9:00 A M Panet Discuulon on 10 CFR 50.59 Mr. Dost Weisers, NEI Meabers of NEl Task Force 10:15 AM Break 10:30 AM Panel Dheussion on 10 CFR 50.7t(e) Mr. Russ self, NEL Members ofNEl Task Force 12:M Noom Lunch (On your own) 1:30 PM Breakout Session on 10 CFR 50.59 Attendees wiu be grouped by Region. Sessions will be moderaard by NEl1841f anda representativefrom the NEI saskforce. These sessions will be an opportunityfor attendees to discuss 10 CFR 50.59 and implementa!!cn of the ladustry laitiative on NEl 96 07.

3:00 PM Break 9

v

6,

. PRELIMINARY PROGRAM (CONT'D)

>6 3:M PM Besakeet Sesolos en 10 CFR M.71(e)

\

n a,e, a ,e,ro ana. n s.se - .a u .ae -

6p #Elsedend a represenemise pom at NEl askfbres. These susinet ont be an apperana%)(nr amendest u dironst 10 CFR M.7Re).

Site FM A(jours I i

WESDAY, JANUARY 13 7:30 AM Continental Breakfhst 8:MAM Highlights of Besakout Sessises Mr. Tesqr Pueeggelo,NEI 4:45 AM NRC Perspecti" Mr Frank Miraglia NaicinerRescantRegadeelen

  1. melearRegalsasey Commissies 9:30 AM Esecutive Perspective Mr.NereldRay Essentire Vice President Senaars Californiaidissa 10:15 AM Break 10:30 AM Integr'stion of Other Regulatory Process Mr. Tony Plearsagelo,NKI and LicensingIssues Mr.3seye flopd,NKI e Design Bases,NEI97 44 . ,

e Commitment management e Generic Letter 9118.Rev.1 e Curreat IJcensing Basis e Risk. Informed Regulatory Framework e NRC anessment Process 11:45 AM Closing Remarks Mr.Rayn seedia,NEl .

12
00Noom AGours 3

O M ew =memen goon = aman r = . e- m ***** = .* o -**===me-

    • ; _ --w. ,.m,4 et a. .w4

e Nuclear Energy Institute Project No. 689 cc: Mr. Ra'ph Beedle Ms. Lynnette Hendricks, Director Senior Vice President Plant Support

- and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy Institute Suite 400 Suite 400 1776 l Street, NW 1776 i Street, NW Washington, DC 20006-3708 4

Washington, DC 20006-3708 Mr. Alex Marion, Director Programs Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC ' 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute.

Suite 400 .

1776 l Street, NW Washington, DC - 20006-3708 -

- . = , . . - . . - . . _ - .. . . . . . - . . .

- Ji

> l Distribution z Mtg.. Notice w/NEl DatedD ecember 30, 1997

- Hard Cooy i Project No'."689 File PUBLIC PGEB R/F

.OGC-ACRS:

SMagruder-

. EMcKenna TBergman OWFN Receptionist EMall SCollins/FMiraglia BSheron RZimmerman FGillespie

'JRoe DMatthews TEssig FAkstulewicz.

WDean, OEDO PMNS OPA GMizuno, OGC 1

. .