Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000482/LER-1986-023, :on 860419,control Room Intake Chlorine Monitors Left in Bypass Over 1 H W/O Initiation of Control Room Emergency Ventilation Sys in Recirculation Mode.Caused by Personnel Error + (16:22:27, 10 December 2024)
- ML20198E940 + (16:22:29, 10 December 2024)
- ML20198E942 + (16:22:29, 10 December 2024)
- ML20198E939 + (16:22:30, 10 December 2024)
- 05000213/LER-1995-022, :on 951215,identified Potential That Actual Post of LOCA Low Pressure Safety Injection Sys Delivery Rates May Be Less than Safety Analysis Assumptions.Caused by Sys Flow Path Degradation or Pump Wear.Assessment Performed + (16:22:32, 10 December 2024)
- IR 05000373/1998022 + (16:22:35, 10 December 2024)
- ML20198E933 + (16:22:39, 10 December 2024)
- ML20198E932 + (16:22:40, 10 December 2024)
- ML20198E930 + (16:22:41, 10 December 2024)
- ML20198E931 + (16:22:41, 10 December 2024)
- ML20198E928 + (16:22:42, 10 December 2024)
- ML20198E929 + (16:22:42, 10 December 2024)
- 05000213/LER-1995-017, :on 950810,degraded Weld Was Discovered in CAR Fan Svc Water Return Pipe.Caused by Galvanic Corrosion. Replaced Four Dissimilar Welds at Inlet to Throttle Valves by Installing Carbon Steel Flanges + (16:22:44, 10 December 2024)
- ML20198E925 + (16:22:45, 10 December 2024)
- ML20198E923 + (16:22:46, 10 December 2024)
- B16647, Requests Relief from Requirements of 10CFR50.55a(g) for Performing Required Exams for Certain Class 1 Components IAW ASME Section XI for Unit 3 + (16:22:47, 10 December 2024)
- ML20198E919 + (16:22:51, 10 December 2024)
- 05000414/LER-1986-007-01, :on 860422,main Feedwater Isolation Occurred During Maint on Solid State Protection Sys.Caused by Supervisor Failing to Perform Review of Relevent Procedures. Personnel Counseled + (16:22:53, 10 December 2024)
- ML20198E916 + (16:22:54, 10 December 2024)
- IR 05000397/1985026 + (16:22:56, 10 December 2024)
- ML20198E914 + (16:22:56, 10 December 2024)
- CY-97-080, Forwards LERs 95-017-01,95-022-02,96-001-01 & 96-014-01 Which Has Been Revised to Retract Originally Proposed CAs That Will No Longer Be Implemented as Result of Util Decision to Cease Operations at Plant + (16:22:57, 10 December 2024)
- 05000341/LER-1986-010, :on 860423,NRC Inspector Discovered Tech Spec Surveillances Not Performed for Safety/Relief Valve lo-lo Setpoint.Caused by Inadequate Procedure for Updating Survtrac Schedule.Survtrac Program Corrected + (16:22:59, 10 December 2024)
- ML20198E910 + (16:23:00, 10 December 2024)
- ML20198E907 + (16:23:01, 10 December 2024)
- ML20198E906 + (16:23:01, 10 December 2024)
- ML20198E904 + (16:23:02, 10 December 2024)
- ML20198E905 + (16:23:02, 10 December 2024)
- 05000366/LER-1986-011-01, :on 860425,component Failures Prevented 4 H Grab Sampling.Iodine/Noble Gas Sample Sys Inoperable Due to Blown Power Fuse.Particulate Sample Sys Inoperable Due to Sys Vacuum Pump Failure + (16:23:04, 10 December 2024)
- ML20198E898 + (16:23:07, 10 December 2024)
- ML20198E896 + (16:23:08, 10 December 2024)
- 05000271/LER-1986-005, :on 860426,detected Ultrasonic Indications Indicative of IGSCC in Iconel 182 Weld Butter of Both Core Spray Nozzles During Exams Performed Per IE Info Notice 84-41.Weld Overlays Will Be Applied to Nozzles + (16:23:09, 10 December 2024)
- ML20198E892 + (16:23:10, 10 December 2024)
- 05000324/LER-1986-014, :on 860429,automatic Trip of Reactor Protection Sys Logic Channels a & B Occurred.Caused by Upscale Trip of Reactor Power intermediate-range Monitor D. Channels Reset + (16:23:12, 10 December 2024)
- CY-97-078, Submits Response to CAL 1-97-07 Re Radiation Protection Improvement Plan Implementation + (16:23:13, 10 December 2024)
- ML20198E889 + (16:23:13, 10 December 2024)
- TXX-4812, Interim Deficiency Rept CP-86-34 Re Anomalies Observed in Class 1E Inverters Supplied by Elgar Corp & Installed in Ac Distribution Sys.Evaluation Continuing.Submittal of Next Rept Anticipated by 860627 + (16:23:14, 10 December 2024)
- NRC-97-0090, Informs of Removal of Instrument Lines in SG Building to Improve Industrial Safety + (16:23:15, 10 December 2024)
- 05000321/LER-1986-020, :on 860425,RWCU Sys Inboard & Outboard Primary Containment Isolation Valves 2G31-F001 & 2G31-F004 Isolated on High Leakage Flow Signal.Caused by Disconnected Jumper During Functional Test.Isolation Reset + (16:23:17, 10 December 2024)
- ML20198E876 + (16:23:19, 10 December 2024)
- ML20198E871 + (16:23:22, 10 December 2024)
- ML20198E870 + (16:23:24, 10 December 2024)
- ML20198E868 + (16:23:25, 10 December 2024)
- ML20198E867 + (16:23:26, 10 December 2024)
- ML20198E866 + (16:23:26, 10 December 2024)
- ML20198E865 + (16:23:27, 10 December 2024)
- ML20198E863 + (16:23:28, 10 December 2024)
- ML20198E860 + (16:23:29, 10 December 2024)
- ML20198E862 + (16:23:29, 10 December 2024)
- NOC-AE-0382, Commitment Change Summary Rept for Period 970107-981208, Per 10CFR50.5(b)(2).Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change.With + (16:23:53, 10 December 2024)
- ML20198E856 + (16:23:53, 10 December 2024)
- ML20198E853 + (16:23:54, 10 December 2024)