D Arizona Nuclear Power Project P.o. Box 52034
- PHOENIX ARIZONA 85072-2034 May 14, 1986 ANPP-36580-EEVB/LAS/DRL-92.11 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Unit 2, 3 Docket No. 50/529, 530
Subject:
Time Extension For Report - DER 85-43 A 50.55(e) Potentially Reportable Deficiency Relating to Lack of Compliance to Bechtel/ANPP Requirements For Class Q1E Materials File: 86-006-216; 86-056-026; D.4.33.2
Reference:
(A) Telephone Conversation between R. C. Sorenson and T. R. Bradish on December 30, 1985 (Initial Reportability - DER 85-43))
(B) ANPP-34803, dated January 24, 1986 (Interim Report - DER 85-43)
(C) ANPP-35350, dated February 28, 1986 (Interim Report, Rev. 1, DER 85-43)
(D) ANPP-36068, dated April 11, 1986 (Time Extension, DER 85-43)
Dear Sir:
The NRC was notified of a Potentially Reportable Deficiency in Reference (A),
Interim Reports were issued by References (B) and (C), and a time extension by Reference (D). At that time it was estimated that a Final Report would be available by May 14, 1986.
Due to additional documentation required, from the Brown Boveri facility, to resolve ANPP concerns, it is now expected that a Final Report will be submitted by June 19, 1986.
There is no new information or change to the Interim Report at this time.
Very truly yours
}
CLEA._
4 LAA.-
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/DRL/1df Idf/001/TE85-43 8605280343 860514 R
ADOCK 05000529 S
cc: See Page Two PDR I 0
. ff.27
i ANPP-36580-EEVB/LAS/DRL-92.~11 May 14, 1986
- DER 85 Time Extension Mr. D. F. Kirsch
. Acting Director.
Page Two a
+
cc:
J. M. Taylor, Director Office of Inspection.and Enforcement i
U. S. Nuclear Regulatory Commission i
Washington, D. C. 20555 r
A. C. Geht (4141)
R. P. Zimmerman (6295) 4 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4
?
A 4
1 4
b 4