Interim Deficiency Rept DER 85-43 Re Lack of Compliance to Bechtel/Arizona Nuclear Power Project Requirements for Class Q1E Matls.Initially Reported on 851230.Final Rept Delayed Until 860619,per 860411 Request for Extension
ML20198E925
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/14/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-36580-EEVB, DER-85-43, NUDOCS 8605280343
Download: ML20198E925 (2)


Text

.

D Arizona Nuclear Power Project P.o. Box 52034

  • PHOENIX ARIZONA 85072-2034 May 14, 1986 ANPP-36580-EEVB/LAS/DRL-92.11 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Unit 2, 3 Docket No. 50/529, 530

Subject:

Time Extension For Report - DER 85-43 A 50.55(e) Potentially Reportable Deficiency Relating to Lack of Compliance to Bechtel/ANPP Requirements For Class Q1E Materials File: 86-006-216; 86-056-026; D.4.33.2

Reference:

(A) Telephone Conversation between R. C. Sorenson and T. R. Bradish on December 30, 1985 (Initial Reportability - DER 85-43))

(B) ANPP-34803, dated January 24, 1986 (Interim Report - DER 85-43)

(C) ANPP-35350, dated February 28, 1986 (Interim Report, Rev. 1, DER 85-43)

(D) ANPP-36068, dated April 11, 1986 (Time Extension, DER 85-43)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A),

Interim Reports were issued by References (B) and (C), and a time extension by Reference (D). At that time it was estimated that a Final Report would be available by May 14, 1986.

Due to additional documentation required, from the Brown Boveri facility, to resolve ANPP concerns, it is now expected that a Final Report will be submitted by June 19, 1986.

There is no new information or change to the Interim Report at this time.

Very truly yours

}

CLEA._

4 LAA.-

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/DRL/1df Idf/001/TE85-43 8605280343 860514 R

ADOCK 05000529 S

cc: See Page Two PDR I 0

. ff.27

i ANPP-36580-EEVB/LAS/DRL-92.~11 May 14, 1986

DER 85 Time Extension Mr. D. F. Kirsch

. Acting Director.

Page Two a

+

cc:

J. M. Taylor, Director Office of Inspection.and Enforcement i

U. S. Nuclear Regulatory Commission i

Washington, D. C. 20555 r

A. C. Geht (4141)

R. P. Zimmerman (6295) 4 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 4

?

A 4

1 4

b 4

i

- Idf/009/ FORM-7'

.