Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198P799 + (14:31:20, 10 December 2024)
- ML20198P796 + (14:31:24, 10 December 2024)
- ML20198P794 + (14:31:24, 10 December 2024)
- ML20198P793 + (14:31:25, 10 December 2024)
- ML20198P787 + (14:31:26, 10 December 2024)
- ML20198P790 + (14:31:26, 10 December 2024)
- L-97-051, Submits Special Rept Required to Document,Prior to Resumption of Plant Operation,Results of SG Tube Insps Which Fall Into TS Category C-3.RC-E-1B SG Was pre-designated as Generator Required to Be Sampled During 971017 Insp + (14:31:28, 10 December 2024)
- ML20198P786 + (14:31:28, 10 December 2024)
- L-97-048, Confirms Completion of Requested Actions of GL 96-01. Actions Completed Prior to Completion of First Refueling Outage Following 970110 & Included Listed Instrumentation + (14:31:29, 10 December 2024)
- ML20198P781 + (14:31:30, 10 December 2024)
- ML20198P782 + (14:31:30, 10 December 2024)
- L-97-056, Submits Special Rept Documenting Results of ISI of SG Tubes, Performed During Unit 1 Twelfth Refueling Outage on 971026. Number of Tubes Inspected & Breakdown of Tubes Removed from Svc for Each SG Documented in Table 1 + (14:31:31, 10 December 2024)
- ML20198P778 + (14:31:34, 10 December 2024)
- ML20198P774 + (14:31:44, 10 December 2024)
- ML20198P772 + (14:31:48, 10 December 2024)
- ML20198P770 + (14:31:49, 10 December 2024)
- ML20198P771 + (14:31:49, 10 December 2024)
- ML20198P769 + (14:31:50, 10 December 2024)
- ML20198P768 + (14:31:50, 10 December 2024)
- ML20198P767 + (14:31:51, 10 December 2024)
- 05000263/LER-1997-014-01, :on 971219,determined That Division II ADS Inhibit Switch Was Not Tested as Required by Ts.Caused by Cognitive Error by Revision Preparer & Reviewer of Surveillance Test.Temporary Change in Surveillance Test + (14:31:53, 10 December 2024)
- 05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed + (14:31:54, 10 December 2024)
- ML20198P763 + (14:31:54, 10 December 2024)
- ML20198P759 + (14:31:55, 10 December 2024)
- ML20198P758 + (14:31:56, 10 December 2024)
- ML20198P756 + (14:31:56, 10 December 2024)
- ML20198P755 + (14:31:57, 10 December 2024)
- ML20198P754 + (14:31:57, 10 December 2024)
- ML20198P752 + (14:31:58, 10 December 2024)
- ML20198P750 + (14:31:59, 10 December 2024)
- 05000219/LER-1997-016, :on 971212,monitors May Not Have Operated for Required Time Due to Inadequate Calculation.Increased Low Pressure Limit of Reagent Gases & Ensures That Installed Gas Bottles Had Sufficient Pressure + (14:32:04, 10 December 2024)
- ML20198P746 + (14:32:05, 10 December 2024)
- ML20198P748 + (14:32:05, 10 December 2024)
- ML20198P743 + (14:32:06, 10 December 2024)
- BSEP-97-0483, Submits Revisions to Plant Emergency Procedures.List of Rev Procedures & Summary of Changes Encl + (14:32:07, 10 December 2024)
- ML20198P742 + (14:32:07, 10 December 2024)
- ML20198P739 + (14:32:08, 10 December 2024)
- ML20198P736 + (14:32:09, 10 December 2024)
- ML20198P737 + (14:32:09, 10 December 2024)
- ML20198P733 + (14:32:10, 10 December 2024)
- ML20198P734 + (14:32:10, 10 December 2024)
- ML20198P732 + (14:32:11, 10 December 2024)
- B16842, Provides Revised Commitment Stated in Which Responded to Recommendations Made by Little Harbor Consultants Inc During 970603 Meeting + (14:32:12, 10 December 2024)
- ML20198P728 + (14:32:12, 10 December 2024)
- 05000338/LER-1997-008, :on 971027,both EDGs Inoperable During Testing. Caused by TS Surveillance Requirement to Demonstrate Operability of Remaining EDG When One Inoperable.Required TS Actions Cleared Following 1J EDG Testing + (14:32:14, 10 December 2024)
- ML20198P726 + (14:32:15, 10 December 2024)
- ML20198P725 + (14:32:17, 10 December 2024)
- ML20198P723 + (14:32:18, 10 December 2024)
- L-97-049, Submits Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, + (14:32:26, 10 December 2024)
- ML20198P718 + (14:32:29, 10 December 2024)
- ST-HL-AE-5783, Submits 30-day Rept Re Significant Changes to Accepted Large Break LOCA ECCS Evaluation Model at Units 1 & 2 + (14:32:30, 10 December 2024)
- 05000455/LER-1997-003-08, :on 971010,reactor Trip Occurred,Due to age-related Failures of Redundant Power Supplies That Went Undetected by Alarm Sys.Modification to Power Supply Failure Alarm Will Be Submitted to TRC for Review + (14:32:32, 10 December 2024)