Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198S945 + (13:59:33, 10 December 2024)
- ML20198S946 + (13:59:33, 10 December 2024)
- ML20198S944 + (13:59:34, 10 December 2024)
- ML20198S943 + (13:59:34, 10 December 2024)
- ML20198S940 + (13:59:35, 10 December 2024)
- ML20198S941 + (13:59:35, 10 December 2024)
- ML20198S939 + (13:59:36, 10 December 2024)
- ML20198S937 + (13:59:37, 10 December 2024)
- ML20198S938 + (13:59:37, 10 December 2024)
- ML20198S934 + (13:59:39, 10 December 2024)
- ML20198S930 + (13:59:40, 10 December 2024)
- ML20198S931 + (13:59:40, 10 December 2024)
- ML20198S928 + (13:59:41, 10 December 2024)
- ML20198S929 + (13:59:41, 10 December 2024)
- ML20198S927 + (13:59:42, 10 December 2024)
- ML20198S925 + (13:59:43, 10 December 2024)
- ML20198S926 + (13:59:43, 10 December 2024)
- ML20198S924 + (13:59:44, 10 December 2024)
- ML20198S923 + (13:59:44, 10 December 2024)
- ML20198S921 + (13:59:45, 10 December 2024)
- ML20198S917 + (14:00:03, 10 December 2024)
- ML20198S918 + (14:00:03, 10 December 2024)
- ML20198S911 + (14:00:05, 10 December 2024)
- ML20198S915 + (14:00:05, 10 December 2024)
- 3F0198-35, Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes + (14:00:06, 10 December 2024)
- ML20198S907 + (14:00:07, 10 December 2024)
- 3F1197-09, Provides Description of Control Complex Habitability Envelope Inleakage Testing & Revisions to Calculational Methodology Used for Determining CR Operator Dose at Plant, Unit 3.W/plan for Resolving Discrepancies & Commitments + (14:00:11, 10 December 2024)
- ML20198S905 + (14:00:11, 10 December 2024)
- ML20198S898 + (14:00:12, 10 December 2024)
- 05000304/LER-1997-002-09, :on 971012,inadvertent Isolation of Svc Water Cooling to 2B DG During Sys Alignment,Occurred.Caused by Shift Mgt Not Ensuring All Operability Requirements Met. Valve 2MOV-SW0023 Opened to Restore Flow to 2B EDG + (14:00:17, 10 December 2024)
- ML20198S896 + (14:00:18, 10 December 2024)
- ML20198S895 + (14:00:18, 10 December 2024)
- ML20198S893 + (14:00:19, 10 December 2024)
- ML20198S890 + (14:00:19, 10 December 2024)
- ML20198S889 + (14:00:20, 10 December 2024)
- ML20198S886 + (14:00:21, 10 December 2024)
- PNO-I-97-065A, on 971018,Troxler Model 3430 Moisture/Density Gauge Had Been Stolen.Gauge Recovered by Ny Long Island Suffolk County Police on 971112 in Brentwood,Long Island. Police Transported Gauge to Brookhaven Natl Lab for Exam + (14:00:21, 10 December 2024)
- 05000454/LER-1997-017-03, :on 971009,completion of Shutdown Was Initiated.Caused by Degraded Condition of Safety Injection Sys Found.Caused by Failure of Cold Leg Check Valve. Leak-rate Determination Performed + (14:00:23, 10 December 2024)
- 05000440/LER-1986-011, :on 860503-05 & 0516-17,gaseous Effluent Vent Stack Flow Estimates Not Performed Every 4 H.Caused by Personnel Error.Personnel Will Be Trained & Counseled + (14:00:25, 10 December 2024)
- ML20198S879 + (14:00:26, 10 December 2024)
- ML20198S878 + (14:00:27, 10 December 2024)
- ML20198S877 + (14:00:27, 10 December 2024)
- ML20198S874 + (14:00:28, 10 December 2024)
- ML20198S873 + (14:00:29, 10 December 2024)
- ML20198S872 + (14:00:30, 10 December 2024)
- ML20198S869 + (14:00:39, 10 December 2024)
- ML20198S865 + (14:00:41, 10 December 2024)
- ML20198S868 + (14:00:41, 10 December 2024)
- ML20198S861 + (14:00:43, 10 December 2024)
- ML20198S860 + (14:00:44, 10 December 2024)
- NSD-NRC-97-5415, Forwards AP600 TS 3.3.1 & 3.3.2,incorporating NRC Comments Resolved During 971027 Telcon.Ts Changes Will Be Incorporated in Rev 8 & SSAR Markups Will Be Included in Next SSAR Rev.Open Item 6152 Is Statused Confirm-W + (14:00:45, 10 December 2024)
- ML20198S858 + (14:01:02, 10 December 2024)