Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320C019 + (09:07:14, 1 January 2025)
- ML19320C018 + (09:07:15, 1 January 2025)
- 05000313/LER-1980-022-01, /01T-0:on 800624,w/Mayflower 500 Kv Transmission Line Out of Svc & Unit Operating at Full power,500 Kv Mabelvale Line Tripped.Caused by Ground Fault & Overload. Lock-out Relays Were Reset & 500 Kv Bus re-energized + (09:07:17, 1 January 2025)
- ML19320C016 + (09:07:18, 1 January 2025)
- ML19320C015 + (09:07:19, 1 January 2025)
- 05000368/LER-1980-041, Forwards LER 80-041/03L-0 + (09:07:20, 1 January 2025)
- ML19320C012 + (09:07:23, 1 January 2025)
- ML19320C011 + (09:07:23, 1 January 2025)
- ML19320C010 + (09:07:24, 1 January 2025)
- 05000313/LER-1980-022, Forwards LER 80-022/01T-0 + (09:07:26, 1 January 2025)
- ML19320C006 + (09:07:27, 1 January 2025)
- ML19320C003 + (09:07:29, 1 January 2025)
- ML19320C002 + (09:07:31, 1 January 2025)
- ML19320C001 + (09:07:31, 1 January 2025)
- ML19320B999 + (09:07:32, 1 January 2025)
- ML19320B998 + (09:07:32, 1 January 2025)
- ML19320B997 + (09:07:33, 1 January 2025)
- ML19320B993 + (09:07:34, 1 January 2025)
- ML19320B995 + (09:07:34, 1 January 2025)
- ML19320B992 + (09:07:35, 1 January 2025)
- 05000313/LER-1980-016-03, /03L-0:on 800611,during Hydrogen Purge Sys Surveillance Testing,Proper Sys Flow Could Not Be Obtained. Caused by Rust Scale Lodged in Check Valves.Check Valves Cleaned & Reassembled + (09:07:36, 1 January 2025)
- ML19320B990 + (09:07:42, 1 January 2025)
- 05000313/LER-1980-016, Forwards LER 80-016/03L-0 + (09:07:43, 1 January 2025)
- ML19320B987 + (09:07:50, 1 January 2025)
- ML19320B986 + (09:07:51, 1 January 2025)
- ML19320B985 + (09:07:52, 1 January 2025)
- ML19320B983 + (09:07:53, 1 January 2025)
- ML19320B981 + (09:07:58, 1 January 2025)
- ML19320B977 + (09:08:02, 1 January 2025)
- ML19320B975 + (09:08:05, 1 January 2025)
- ML19320B973 + (09:08:06, 1 January 2025)
- ML19320B970 + (09:08:08, 1 January 2025)
- ML19320B968 + (09:08:10, 1 January 2025)
- ML19320B967 + (09:08:14, 1 January 2025)
- 05000346/LER-1980-048-01, /01T-0:on 800627,during IE Bulletin 79-14 Insp, Pipe Support HCB-40-B1 Found Not Installed & CCA-8-H15 Found Mislocated.Caused by Initial Const/Installation Error. Supports Will Be Installed in Proper Locations + (09:08:16, 1 January 2025)
- ML19320B964 + (09:08:19, 1 January 2025)
- ML19320B960 + (09:08:20, 1 January 2025)
- ML19320B959 + (09:08:21, 1 January 2025)
- ML19320B958 + (09:08:28, 1 January 2025)
- ML19320B957 + (09:08:28, 1 January 2025)
- ML19320B954 + (09:08:32, 1 January 2025)
- ML19320B950 + (09:08:36, 1 January 2025)
- ML19320B944 + (09:08:47, 1 January 2025)
- ML19320B943 + (09:08:48, 1 January 2025)
- 05000320/LER-1980-023-03, /03L-0:on 800603,boron Concentration in Boric Acid Mix Tank Found Exceeding Tech Specs.Caused by Evaporation from Use of Temporary Air Sparger Mixing Apparatus.Boron Solution Diluted & Regular Tank Mixer Returned to Svc + (09:08:49, 1 January 2025)
- 05000320/LER-1980-023, Forwards LER 80-023/03L-0 + (09:08:51, 1 January 2025)
- 05000320/LER-1980-025-03, /03L-0:on 800607,reactor Coolant Inlet Temp Meter on Remote Shutdown Monitoring Instrument Panel Found Inoperable.Caused by Instrument Failure.Replacement Ordered & Voltmeter Temporarily Installed + (09:08:53, 1 January 2025)
- 05000320/LER-1980-025, Forwards LER 80-025/03L-0 + (09:08:55, 1 January 2025)
- 05000327/LER-1980-084-01, /01T-0:on 800623,control Room Integrity Was Breached by Removal of Door C-49 for Maint & Removal of Tape from C-37 & C-50 for Access.Doors Repaired or Replaced. Personnel Reinstructed + (09:08:57, 1 January 2025)
- IR 05000302/1980019 + (09:09:01, 1 January 2025)
- ML19320B931 + (09:09:03, 1 January 2025)