O OPERATIllG DAT A REPORT CD DOCI'ET 110. 50-266 C
0 DATE July a, t980 4w Ot COMPLETED DY C.
W.
FAY C
Ob TELL PilOllE 414 277 2811 W
OPERATIllG STATUS OD
- 1. UNIT tlAME:
POINT DEACilflUCLEAR PLANT UtlIT 1 NOTES
- 2. REPORTItJG PERIOD:
JutlE 1980 3c LICEtlSED TilERMAL POWER (MWT):
1518.
- 4. NAMEPLATE RATING'(GROSS MWE):
523.8
- 5. DESIGil ELECTRICAL RATING (f1ET MWE):
497.
- 6. MAXIMUti DEPENDAllLE CAPACITY (GROSS MWEl:
519.
- 7. MAXItiUM DEPltlDA!!LE CAPACITY (t4ET MWE):
495.
8.
IF CllANGES OCCUR IN Ci.dACITY RATINGS (ITEMS tlUMill R 3 TilliOUGil 7) SINCE LAST REPORTe GIVE l(LASONS:
il0T APPLICADLE
~
- 9. POWER LEVEL TO WilICll RESTRICTED, IF ANY (ilET MWE):
390.0
- 10. REASONS FOR llESTRICTIONSe (IF ANY):
ElDIXXA3000DilGDNTE Power restriction is the result of a self-imposed reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubes within the tubesheet crevice.
TilIS MollTil YR TO DATE CUMULATIVE
- 11. Il0URS Ill REPORTIt40 PERIOD 720 4,367 84,599
-12. IlUMDER OF 1100RS REACTOR WAS CRITICAL 718 6 3,617.1 70,133.6
- 13. REACTOR fiESERVE SilVTDOWil ll0URS 03 19.1 601.3
- 14. IlOURS GENERATOR ON LINE 717.8 3,473.3 67e867.3
- 15. UNIT RESERVE SiluTDOWilll0URS 00 151.5 753.9
- 16. GROSS TilERMAL ENERGY GENERATED (MWlu 870e132 4e185,056 94,937,851
- 17. GROSS ELLCTRICAL ENERGY GENERATED (MWil) 282e500 1e364,180 31,997e930
- 18. NET ELECTRICAL ENERGY GENERATED (MWlH 267e047 le288e840 30,479,018 19 Ut1IT SERVICE FACTOR 99.7 79.5 80.2
- 20. UtlIT AVAILADILITY FACTOR 99 7 83.0 81.1
- 21. UNIT CAPACITY FACTOR (USING MDC llET) 74.9 59 6 74.0 2d. UtlIT CAPACITY FACTOR (USING DER NET) 74.6 59.4 72.5
- 23. UNIT FORCED OUTAGE RATE 0.3 0.1 3.4
- 24. SilUTDOWils SCllEDULED OVER NEXT 6 M0tillis (TYPEe DAlEr AND DURATION OF EACIO:
Unit scheduled to shut down July 25, 1980, for ten days to perform steam generator leak testing and eddy current inspection.
- 25. IF SilUTDOWN AT EllD OF REPORT PERIODe ESTIMATLD DATE OF STARTUP:
ilCT SilUTD0hN DATA PEPoltTED AND FACTORS CALCUL ATEl) AS REQUES1ED IN IIRC LETU R DATED SEPTEM11ER 2%e 1977
OPERATING DATA REPORT
.DOCVET tio. 50-301 DATE July 8, 1980 COMPLETED HY C. W. FAY TELEPilotiE 414 277 2811 OPERATIt4G STATUS
- 1. UtJIT NAME:
POINT DEACiltJUCLEAR PLAliT UNIT 2
. IJOTES
- 2. REPORTING PERIOD:
JUtJE 1980
- 3. LICEtJSED TilERMAL POWER (MWT):
1518.
- 4. NAMEPLATE RATIl1G (GROSS MWE):
523 8
- 5. DESIGN ELECTRICAL RATING (IIET MWE):
497.
- 6. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE):
519.
- 7. MAXIMUlf DEPEt4DADLE CAPACITY (IJET F1WE):
495.
8.
IF CilANGES OCCUR Ill CAPACITY RATINGS (ITEMS huMut R 3 TilROUGil 7) SIllCE LAST REPORT, GIVE RI.ASONS:
il0T APPLICADLE
- 9. POWER LEVEL TO WilICil RESTRICTED, IF ANY (t1ET MWE):
t10T API'LIC ADLE 10 REA50tl5 FOR RESTRICTI0tiSr (IF At4Y):
t10T APILICAUI.E
'illIS MONlil YR TO DATE CUMULATIVE
- 11. I10URS Ill REPORTItIG "ERIOD 720 4e367 69e384
- 12. NUMBER OF ll0URS REAC "1 WAS CRITICAL 720.0 3,266.9 62e.163.8
- 13. REACTOR RESERVE SiluTDOWi1Il0VRS 0.0 19 2 185.3
- 14. Il0URS GEilERATOR Oil LIllE 720.0 3e200.7 60,927.7
- 15. UtJIT RESERVE SilVTDOWitil0URS 0.0 13.5 119.9 16 GROSS TilERMAL EtJLRGY 6ENERATED (MWil) le068,238 se634,807 82 e 287 e 3863 1 7. GROSS ELLCTRICAL ENERGY GENERATED (MWil) 361,000 1e547e850 27e909,190 111. NET ELECTRICAL ENERGY GENERATED (MWil) 344,556 le472,182 26,5's7,309
)
- 19. UllIT SERVICE FACTOR 100.0 73.3 87.H
- 20. U!!IT AVAILADILITY FACTOR 100.0 73.6 8 11. 0
- 21. UllIT CAPACITY FACTOR (USIt1G MDC tlET) 96.7 68 1 78.0
- 22. UtlIT CAPACITY FACTOR (USING DER IJET) 96.3 67.8 7 /.0
- 23. UtlIT FORCED OUTAGE RATE 0.0 9.9 2.0
t10tlE 26 IF SilUTDOWil AT EllD OF REPORT PERIODe ESTIMAlED DATE OF STAR 1UP:
110T SliUTDOhti DATA REPORTED AllD FACTORS CALCULATED AS RE0th'Slt b Iti IIRC LET ILR DATED St.PTEMDER 22, 1977
DOCKET NO.
50-266 UNIT NAME' Point Beach Unit 1 DATE July 8, 1980 COMPLETED BY C. W.
Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH June, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET _
DAY MWe NET DAY MWe NET 1
374 11 377 21 37y 2
373 12 166 22 372 3
373 13 359 23 372 4
373 14 372 24 371 5
373 15 373 25 370 6
373 16 373 26 374 7
374 17 373 27 374 8
375 18 373 28 372 9
375 19 373 29 372 10 374 2d 372 30 370 31 AD-28A (1-77)
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE
.Tu ly. 8, 1980 COMPLETED BY C.
W.
Fay TELEPilONE 414/277-2811 AVERAGE D y1 Y Uti f't POWER LEVEL l
MONTH
_.l u ng, 1980 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POUi:R LEVEL POWER LEVEL DAY MWe NET DAY 181e NET DAY MWe NET 1
493 11 490 21 460 2
492 12 492 22 y,18 3
491 13 492 23 468 4
491 14 492 24 441 5
487 15 482 25 49) 6 491 16 487 26 492 7
491 17 491 27 490 8
483 18 490 28 452 9
,489 19
_,490 29 459 10 490 2d 494 30 486 31 AD-28A (1-77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 REPORT MONTH Tune, 1980 COMPLETED B C W.
Fay TELEPHONE 414/277-2811 m
c u mo v
as "c
St S'e L
- e au o
mae eo ce No.
Date Q
gg g
jgg Licensee Event gg gy Cause and Corrective Action U
cm e
o sc Report No.
m ao To Prevent Recurrence o~
M gmg g
8 2
800611 P
2.2 G
3 80-007/01T-0 EC GENERI The removal of a vital bus supply invert er from service with a communications mixup, and subse-quent upset of secondary plant conditions causing improper feed-water control and steam /feedwater flow mismatch caused unit trip.
Additional administrative controls will be initiated to help prevent further events.
F: Forced Reason:
3 4
Methol:
Exhibit G-Instruc-S: Scheduled A-Equipment Failure (explain) 1-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Entry C-Refueling 3-Automatic Scram Sheets for LER File D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5
AD-28B Exhibit I-Same G-Operational Error (explain)
Source 1
(01-78)
H-Other (explain)
UNIT SIIUTDOWNS Alli, POlli:lt REDUCTIONS DOCKET 110. 50-301 UNIT NAME Poi nt Ileach tini t 2 DATE J ul y 8, 1980 REPORT MONTil J u rio, 1980 COMPLETED BY C. W.
Fay TELEPHONE 414/277-2811 n
u m$
a cav "c
Jit B*e en e
au o
ooe vu ae ng g
jgg Licensee I: vent y
y Cause and Corrective Action No.
Date D.
N
- s :c e
4,.c Report 110.
to Eo To Prevent Recurrence Q~
(4
') to c o
E 3
U Q
d 1
3 4
F: Forced Reason:
Method:
Exhibit G-Instruc-S: Schaduled A-Equipment Failure (explain) l-Manual tions for Prepar-B-Maintenance or Test 2-Manual Scram ation of Data Eat cy C-Refueling 3-Automatic Scram Sheets for LER l'.i le i D-Regulatory Restriction 4-Other (explain)
E-Operator Training & License Exam F-Administrative 5 Exhibit I-Same
.AD-28B G-Operat.ional Error (explain)
Source (01-78) 11-Other (explain) i
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach Unit 1 Date July 8, 1980 Completed By C. W.
Fay Telephone 414/277-2811 Unit 1 operated at 375 MWe net throughout the period with no load reductions.
The unit generated its 32 billionth kilowatt hour at 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> on July 1.
At 1141 hours0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.341505e-4 months <br />, June 11, the unit tripped from a 390 MWe gross power level.
The trip was due to a communications mixup result ng in the removal of a vital bus supply inverter from service.
The trip of the unit was report 3d on the red phone at 1209 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.600245e-4 months <br /> on June 11.
A 24-hour notification,
" Loss of Containment Pressure Channel Redundancy" (Licensee Event Report No. 80-00 7/OlT-0), was issued on June 12.
The annual inspection of the 3" diesel was performed during the period and was returned to service at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on June 20.
Contractor personnel arrived on site during the period to start work on IE Sulletin 80-11, masonry wall design.
An emeroency evacuation drill was conducted on June 26 between 0948 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.60714e-4 months <br /> and 1013 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.854465e-4 months <br />.
The results of the drill were generally good with some minor items to be critiqued by the plant staff.
No other major safety-related maintenance was performed during the period.
Z 1
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date July 8, 1980 Completed By C. W.
Fay Telephone 414/277-2811 Unit 2 operated at 495 MWe net throughout tne period with few load reductions of a generally short duration per Power Supply.
The load was reduced to 340 MWe for four and one-half hours on June 8 for turbine stop valve testing.
A 24-hour notification " Cross-Connection of Engineered Safety Feature Buses" (Licensee Event Report No. 80-005/0lT-0),
was issued on June 10.
During a training walk-down of the safeguards electrical system, an improper electrical lineup was detected.
The A05 safeguards bus was supplied by the A06 safe-guards bus via the bus tie breaker in lieu of supplying A05 independently by A03.
In the event of a total loss of AC power, a failure of this tie breaker to open on automatic signal could jeopardize emergency power.
A 24-hour written notification, " Loss of Containment Spray During Testing" (Licensee Event Report No. 80-006/OlT-0),
was issued en June 18.
On June 17, a routine safeguards logic test was conducted with the 3D diesel out-of-service for annual maintenance.
Conducting this test with the 3D diesel out-of-service could have caused a total loss of automatic containment spray capability during a loss of AC follcwed by a LOCA.
A 24-hour written notification, " Loss of Residual Heat Removal (RHR) Redundancy During Testing" (Licensee Event Report No. 80-006/OlT-0), was issued on June 19.
At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on June 19, a routine valve' operability test required by ASME Code Section XI, was conducted with the 3D.iesel out-of-service for annual maintenance.
Conducting this test rendered the "B"
residual heat removal pump inoperable for about 90 seconds while the pump suction valve was being cycled.
The "A" residual heat removal pump was already inoperable in the event of a loss of AC since its. associated emeryency diesel generator was out-of-service.
Load was reduced to 275 MWe for 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> en June 22 and for seven hours on June 23 for condenser tube leak testing.
An old condenser tube leak in the No. 4 waterbox and a condenser 4
air inleakage path were identified and repaired.
An additional load reduction on July 1 was to fac.litate additional condenser tube leak checking and to repair a seal water injection line on the "B" main feed pump.
One leaking condenser tube was plugged.
, Work continues on the auxiliary feedwater line to steam generator flow indication modification.
The heater drain tank pump seals were replaced and check valves were installed in the primary coolant sampling lines.
No other major safety-related maintenance was performed
. during the period.
1 p