ML19320B993

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for June 1980
ML19320B993
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/10/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19320B994 List:
References
NUDOCS 8007150610
Download: ML19320B993 (1)


Text

_ _ _ _

I mia w

WISCONSIN Elecinc wcome 231 wr]T MICHIGAN, MIL A AVE, blSCONSIN 53201 July 10, 1980 Director of Regul tory Operations U.

S. NUCLEAR REGULATORY COMMISSION Washington, D.

C.

20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Urits 1 and 2, Point Beach Nuclear Plant, for the calendar month of June 1980.

Very truly yours, C. W.

Fay, Director Nuclear Power Department Attachments Copies to J.

G. Keppler - NEC, Region III NRC Resident Inspector - Point Beach Nuclear Plant C.

F.

Riederer - PSCW

[008 5

//

8007150610