ML19320B990
| ML19320B990 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/07/1980 |
| From: | Richard Bright FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3-0-3-A-4, IEB-80-11, NUDOCS 8007150598 | |
| Download: ML19320B990 (6) | |
Text
.
A,-
Florida Pw
...o.....e.,r.
July 7, 1980 File: 3-0-3-a-4 Mr. J. P. O'Reilly Di rector -
Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Suite 31ve 101 Marietta Street
-Atlanta, GA '30303
SUBJECT:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Bulletin 80-11 -- MASONRY WALL DESIGN
Dear Mr. O'Reilly:
Enclosed is our respense to IE Bulletin 80-11, Items 1, 2a, and 3.
Should'you have any questions cuncerning our response, please contact this office.
Very truly yours, FLORIDA POWER CORPORATION
-Ronald M. Bri ht-Acting Manager Nuclear Support Services Lobo (M05)DN-98-3 co/
Attachment 5
cc: Director
/-
Office of Inspection and Enforcement
///
Division of Reactor 0perations Inspection U.S. Nuclear Regulatory Commission Washington, DC 2055.5 General Office 3201 Tnerty tourin street souin. P O Box 14042, st Petersburg Florida 33733 813-866-5151
-8007150 5 9 7'
STATE OF' FLORIDA COUNTY OF PINELLAS R. M.
Bright states that he is the Acting Manager, Nuclear Support Services Department of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the infonnation attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
/
R. M. Aright Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 7th day of July, 1980.
bSt 4M f Notary Public
//
Notary Public, State of Florida at Large, My Commission Expires: June 8, 1984 Lobo (M05 Notary)DN-98-3 l-
FPC RESPONSE.T0 IE BULLETIN 80-11 MASONRY WALL DESIGN ITEMS 1, 2a, AND 3 ITEM 1 Identify all masonry. walls in your facility which are in proximity to or have attachments from safety-related piping or equipment such that wall failure could af fect a safety-related system.
Describe the systems and equipment, both safety and non-safety-related, associated with these ma-sonry wa!-Is.
Include in your review, masonry walls that are intended to resist impact or pressurization loads, such as missiles, pipe whip, pipe break, jet inpingement, or tornado, and fi re or water barriers, or shield walls. Equipment to be considered as attachments or in proximity to the walls shall include, but is not limited to, pumps, valves, mo-tors, heat exchangers, cable trays, cable / conduit, HVAC ductwork, cad electrical cabinets,. instrumentation, and controls.
Plant surveys, if necessary, for areas inaccessible during normal plant operation shall be performed at the earliest opportunity.
RESPONSE
We have reviewed CR-3 architectural drawings and.. identified below by buil di ng and elevation, the naser.ry walls and systems / equipment in the proximity of these masonry walls.
1.0 AIR SHAFT Turbine
- Building, Ei.
95'-0" to El. 182'-2", Column Line G at 304-305.
1.1 El. 95'-0" a.
Secondary Service Clos 5d Cycle Cooling Pump:
Non-Safety b.
Cable Trays:
Non-Safety 1.2 El. 119'-0" a.
Terminal MCC 3A:
Non-Safety b.
Cable Trays:
Non-Cafety 1.3 EL. 145'-0" a.
Feedwater = Pump 3A - Associated piping, valves, cables, and controls:
Non-Sa fety 1.4_
Posible blockage of Interraediate Building and Pene-tration Cooling intakes with internal collapse of wall.
Lobo (M05 Resp)DN-98-3 -
1.5 Main ' Supply and Exhaust Ducts to all levels of Con-trol Complex, other than Control Room:
Sa fety-related-2.0 TURBINE BUILDING
-2.1 Sample Room - El. 95"-0", Column Lines D&E at 310-311.
.a.
Sample Racks, etc.:
Non-Safety b.
Atmospheric Drain Tank: Non-Safety
,c.
Condensate Ejection Pumps 3A & 3B:
Non-Safety d.
Condensate Drain ' Injection Unit: Non-Safety e.
Air Cooling Unit: Non-Safety f.
Cable Trays:
Non-Safe ty 2.2 Instrument Room - El. 95'-0", Column Line G at 308-309 a.
Controls:
Non-Safety
" b.
Emergency Feedwater Pump Suction Trench:
Non-Safety c.
Air Conditioning Unit:
Non-Safety d.
Feedwater Booster Pump 3A:
Non-Safety e.
Cable Trays: Non-Safety 3.0 CONTROL C0:4 PLEX 3.1.
El. 95'-0" a.
Locker Rooms and'0ffices:
Non-Safety b.
Secondary Plant Laboratory:
Non-Safety c.
Radio-Chem Laboratory:
Non-Sa fe ty -
d.
Laundry Rooms:
Non-Sa fety 3.2.2 El.145'-0" - Satellite Instrument Room a.-
Cable Tray:
Safety-related 4.0 FIRE SERVICE PUMP HOUSE 4.1 Exterior Walls: Non-Safety Equipment 5.0 GUAR 0 HOUSE 5.1 Exterior and Interior Walls: Non-Safety Equipment 6.0 WATER TREATING PLANT 6.1 Office Walls: Non-Sa fety Functions of_ these masonry walls will be described in the re-sponse to-Item 2a.
Lobo (M05 Resp)0N-98-3.
t ITEM 2 Provide a re-evaluation of the design adequacy of the walls identified
- in. Item 1 above to determine whether the masonry wal?s will perform their intended function under all postulated loads and' load combina-tions.
In this regard, the NRC encourages the formation of an owners'
- group to establish' both appropriate re-evaluation criteria and where necessary, a laten confirmatory masonry test program to quantify the safety margins established by the re-evaluation criteria (this is dis-cussed fruther in Item 3 below).
a.
Establish a prioritized program for the re-evaluation of the masonry walls. Provide a description of the program and a de-tailed schedule for completion of the re-evaluatic ) for the categories in the program.
The completion date of all re-evaluations should not be more than 180 days from the date of this Bulletin. A higher priority should be placed on the wall re-evaluations considering safety-related piping 2-1/2 inches or greater in diameter, piping with support loads due to ther-mal expansion greater than 100 pounds, safety-related equip-merit weighing 100 pounds or greater, the safety significance of the potentially af fected systems, the overall loads on the
~
wall, and the opportunity for performing plant survey ; and, if necessary, modifications in areas otherwise inaccess4 ale.
The factors described above are meant to provide guidance in de-termining what loads may significantly affect the ma onry wall analyses.
' RESPONSE FPC reevaluation program includhs tne following:
1.
FPC, in conjunction with Gilbert Associates, Inc.,
will be performing a field survey of all Safety-related piping and equipments attached to or in the vicinity of the walls identified in Item 1.
2.
Results of item 2a.1 will be reviewed to set priori-ties for reevaluating walls depending upon impact on Safety-related systems and/or equipments.
Masonry walls in the vicinity of these Safety-related piping or equipments will be reevaluated and analyzed on a priority basis to determine loads.
Results of these analyses will be included in the 180-day re-
.sponse to the NRC.
ITEM 3 Existing test data or conservative assumptions may be used to justify the re-evaluation acceptance criteria if the criteria are shown to be.
Lobo (M05 Resp)DN-98-3 t
conservative and applicable for the actual plant conditions.
In the ab-sence of appropriate acceptance criteria a confirmatory masonry wall test program is required by the NRC in order to quantify the safety mar-Gins inherent in the re-evaluation criteria.
Describe in detail the ac-tions planned and their schedule to justify the re-evaluation criteria used in Item 2.-
If a test program is necessary, provide your comitment for such a program and a schedule for submittal of a description of the test program and a schedule for completion of the program.
This test program should address all appropriate loads (seismic, tornado, missile, etc.).
It is expected that the test program will extend beyond the 180-day period allowed for the other Bulletir :etions.
Submit the re-suits of the test program.upon its completion.
Resp 0NSE FPC will develop a reevaluation acceptance criteria for walls based on conservative design assumptions which is consistent with our schedule in Item 2a.
Should a test program te neces-sary, we will notify you immediately and provide our schedules for submittal of a description and completion of the test program.7 Lobo (M05 Resp)DN-98-3 I i