MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month ' June, 1980. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:1.1.c. of the-Technical Specifications.
During the report period the reactor remained in the' cold shutdown mode of operation. There were no significant events associated with the
-operation of the Unit. There was no significant maintenance completed during the month.
1 y
1 i
4
__. f 4.8 0 0_'7 2 8 9 5 73 I
OPERATING DATA REPORT DOCKETNO. 50~/33 DATE 7-3-So C051PLETED BY 'E wl BAsm TELEPliONE 707/443-2737 OPERATING STATUS
- 1. Unit Name.
mom AY o.J E 4.AwT Notes
- 2. Reporting Period:
L ar. /980
- 3. Licensed Thermal Power t.\\1ht):
2 2C)
- 4. Nameplate Rating (Gruss StWel:
dI
- 5. Design Electricai Rctmg e. Net Siber:
df
- 6. Sf aximum Dependable Capacity IGross AlWei-6
- 7. Sfaximum Dependable Capacity INet 31Wel:
dd
- 8. If Changes Occur in Capacity Ratings tirems Number 3 Through 7)Since Last Report. Give Reasons:
hllA
- 9. Power Lesel To which Restricted. If Any (Net SIWE :
A/
- 10. Reasons For Restrictions,if Any:
^/
Tids Stonth Yr.-to Date Cumulatis e I1. Ilours In Reporting Period 720 4367 MAY
- 12. Number Of !!aurs Reactor Was Critical O
O 98J 7 l
- 13. Reactor Reserve Shutdown flours O
O O
- 14. Ilours Generator On Line O
O 9 9, 2 J1
- 15. Unit Roene Shutdown flours O'
O O
- 16. Gross Thermal Energy Generated (51Wil)
O O
/S" g/df. M/
- 17. Gross Electrical Energy Generated IStWill O
O 4.739 732
- 18. Net Electrical Energy Generated (5thil)
- 2.14
-l l H 4,4E /g8
- 19. Unit Service Factor O
O df4%
- 20. Unit Availability Factor '
O O
df d P.
- 21. Unit Capacity Factor (Using.\\f DC Net) o O
48 0 A
- 22. Unit Capacity Factor iUsing DER Neti O
C 4d Do
- 23. Unit Forced Outage Rate O
O
/ 7 / ?,
- 24. Shutdowns Scheduled Oser Nest 6 Stonths IType.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estirnated Date of Startup:
NM
- 26. Units in Test Status (Prior o Commercial Operation):
Forecast
~ Achieved INITIAL CRITICA LITY INITIAL ELECTRICITY I
CO.\\talERCIAL OPERA IlON (9/77)
.. ~ ~ * +
1
.j
\\
UNITSHUTDOWNS AND POWER REDUCTIONS M ETNO.
UNIT NAME DATE COMPLETED BY REPORT MON 111 TELEPilONE E
c
.$ E
}
Y5 Licensce E -r, g""3 Cause & Corrective No.
Date g
3 ij
.c g 5 Event Uy o-Action to
~5g Report #
d' O hV Prevent Recurrence
$=
5 H
~
u cO 7f-f 7f o90),
5 720 C. H l
N/A s e ss m e. m assese.s;,sa c
~
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 0161)
E Operator Training & Ucense Examination F Administrative 5
G-Operational Erri.: (Esplain)
Exhibit I-Same Source (9/77) 11 Other ( E splain) i
AVERACE DA!LY UNIT POhER LEVEL DOCKET NO.
To -/3 3 UNIT NOEP Wo. 3 DATE 7 ~ 3 - SC CO3fPLETED BY W MdM 7 7 O-29a?
TFLEPHONE
~d~u N E., \\36O MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We Netn (3gwe.3,,3 I
I7~
O 2
33 3
19 4
20 5
21
'f 6
22 6
i 7
23 8
- 4 9
25 10 26 II 27 32 23 I3 29 I4 30 if i5 3g
'I 16 INSTRUCTIONS On this format. list the aserage daily unit power levelin StWe Net for each day in the report:1g month. Compute to l
j the netmt whole megawatt.
i l
(S/77 )
s
.