Monthly Operating Rept for June 1980
ML19320B975
Person / Time
Site: Humboldt Bay
Issue date: 07/03/1980
From: Baum P
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML19320B969 List:
References
NUDOCS 8007150573
Download: ML19320B975 (4)


Text

__

V_

MONTHLY NARRATIVE REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month ' June, 1980. This report was prepared by the Plant Staff and is submitted in accordance with Section IX:1.1.c. of the-Technical Specifications.

During the report period the reactor remained in the' cold shutdown mode of operation. There were no significant events associated with the

-operation of the Unit. There was no significant maintenance completed during the month.

1 y

1 i

4

__. f 4.8 0 0_'7 2 8 9 5 73 I

OPERATING DATA REPORT DOCKETNO. 50~/33 DATE 7-3-So C051PLETED BY 'E wl BAsm TELEPliONE 707/443-2737 OPERATING STATUS

1. Unit Name.

mom AY o.J E 4.AwT Notes

2. Reporting Period:

L ar. /980

3. Licensed Thermal Power t.\\1ht):

2 2C)

4. Nameplate Rating (Gruss StWel:

dI

5. Design Electricai Rctmg e. Net Siber:

df

6. Sf aximum Dependable Capacity IGross AlWei-6
7. Sfaximum Dependable Capacity INet 31Wel:

dd

8. If Changes Occur in Capacity Ratings tirems Number 3 Through 7)Since Last Report. Give Reasons:

hllA

9. Power Lesel To which Restricted. If Any (Net SIWE :

A/

10. Reasons For Restrictions,if Any:

^/

Tids Stonth Yr.-to Date Cumulatis e I1. Ilours In Reporting Period 720 4367 MAY

12. Number Of !!aurs Reactor Was Critical O

O 98J 7 l

13. Reactor Reserve Shutdown flours O

O O

14. Ilours Generator On Line O

O 9 9, 2 J1

15. Unit Roene Shutdown flours O'

O O

16. Gross Thermal Energy Generated (51Wil)

O O

/S" g/df. M/

17. Gross Electrical Energy Generated IStWill O

O 4.739 732

18. Net Electrical Energy Generated (5thil)

- 2.14

-l l H 4,4E /g8

19. Unit Service Factor O

O df4%

20. Unit Availability Factor '

O O

df d P.

21. Unit Capacity Factor (Using.\\f DC Net) o O

48 0 A

22. Unit Capacity Factor iUsing DER Neti O

C 4d Do

23. Unit Forced Outage Rate O

O

/ 7 / ?,

24. Shutdowns Scheduled Oser Nest 6 Stonths IType.Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estirnated Date of Startup:

NM

26. Units in Test Status (Prior o Commercial Operation):

Forecast

~ Achieved INITIAL CRITICA LITY INITIAL ELECTRICITY I

CO.\\talERCIAL OPERA IlON (9/77)

.. ~ ~ * +

1

.j

\\

UNITSHUTDOWNS AND POWER REDUCTIONS M ETNO.

UNIT NAME DATE COMPLETED BY REPORT MON 111 TELEPilONE E

c

.$ E

}

Y5 Licensce E -r, g""3 Cause & Corrective No.

Date g

3 ij

.c g 5 Event Uy o-Action to

~5g Report #

d' O hV Prevent Recurrence

$=

5 H

~

u cO 7f-f 7f o90),

5 720 C. H l

N/A s e ss m e. m assese.s;,sa c

~

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other ( Explain) 0161)

E Operator Training & Ucense Examination F Administrative 5

G-Operational Erri.: (Esplain)

Exhibit I-Same Source (9/77) 11 Other ( E splain) i

AVERACE DA!LY UNIT POhER LEVEL DOCKET NO.

To -/3 3 UNIT NOEP Wo. 3 DATE 7 ~ 3 - SC CO3fPLETED BY W MdM 7 7 O-29a?

TFLEPHONE

~d~u N E., \\36O MONTil DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We Netn (3gwe.3,,3 I

I7~

O 2

33 3

19 4

20 5

21

'f 6

22 6

i 7

23 8

4 9

25 10 26 II 27 32 23 I3 29 I4 30 if i5 3g

'I 16 INSTRUCTIONS On this format. list the aserage daily unit power levelin StWe Net for each day in the report:1g month. Compute to l

j the netmt whole megawatt.

i l

(S/77 )