OPERATING DATA REPORT DOCKET NO.
50-244 DATE Julv 7. 1980 COMPLETED BY dd '~b DC-9 A s
Andrew E. McNamara TELEPHONE l-315-524-4446.
OPERATING STATUS Ext. 205, 293 at Ginna
- 1. Unit Name:
GINNA STATION. UNIT 81 Notes The Reactor Power Level June 10, 1980 averaged 1007. in the
- 2. Reporting Period:
1520 Report Period, with a
- 3. Licensed Thermal Power (h!Tt):
e n
ex ep ns ggn
- 1. Nameplate Racing (Gross hfTe):
detailed on Page 4.
470
- 5. Design Electrical Rating (Net SITE):
490 ti. Sfaximum Dependable Capacity (Gross AITe):
470
'.11aximum Dependable Capacity (Net 5tTe):
- 8. If Changes Occur in Capacity Racings (Items Number 3 Through 7) Since Last Report. Give Reasons:
l
- 9. Power Level to Thich Restricted, if Any (Net 5fTe):
i
- 10. Reasons For Restrictions, If Any:
This hionth Yr.-to-Da te Cumulative 720 3.027.25 68.983.88
- 11. Ilours In Reporting Period 720 3,066.25 70.746.02
- 12. Number of Hours Reactor Tas Critical 0
0 1,621.57
- 14 Reactor Reserve Shutdown llours 720 3.027.25 68.983.88
- 11. Ilours Generator On Line 0
0 8.5
- 15. Unit Reserve Shutdown Hours 1,084,200 4.441.800 92.717.602
- 16. Gross Thermal Energy Generated (h!TH) 362,152 1,460,888 **
30,146,679
- 17. Gross Electrical Energy Generated (ifTH) 344,844 1,388,807 28.550.355
- 18. Net Electrical Energy Generated (51TH) 100.007.
69.327.
74.277.
- 19. Unit Service Factor 100.007.
69.327.
74.287,
- 20. Unit Availability Factor 101.907.
67.667.
67.747.
- 21. Unit Capacity Factor (Using AfDC Net) 101.907.
67.667.
67.747.
- 22. Unit Capacity Factor (Using DER Net) 07.
07.
9.527.
- 23. Unit Forced Outage Rate
- 21. Shutdowns Scheduled Over Next 6 5fonths (Type, Date and Duration of Each):
Scheduled - Steam Generator Inspection and Modifications -
10/24 thru 11/23
- 25. If Shut Down At End Of Repet. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationh Forecast Achieved INITIAL CRITICALITY LNITLAL ELECTRICITY C0515tERCLil OPERATION o cumulative total commencing January 1,1975
- Corrected figure to rectify error cade in March,1980 calculations.
a-a
. a ev. inn 8 00n so 59o.
AVER / 7E DAILY UNIT POWER UNIT DOCKET NO. 50 244
- I OI""
8 t*'i "
UNIT July 7, 1980 DATE
{. S W A -
COMPLETED BY c
Andrew E. McNat. ara TELEPHONE 1-315-524-4446 Ext. 293, 205 at Ginna MONTH June. 1980 DAV tVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
(:w e Net)
(Mwe. Net) r 477 1
483 17 2
483 is 478 481 483 13 3
484 482 20 3
486 3
482 482 6
486 22 480 7
486 23 47 3
483 24 9
481 25 480 4
482
'79 10 26 482 475 -
g 27 482
'77 12 28 422 13 481 29 478 480 gg 14 479 15 31 481 16 INSTRUCTIONS On this format,' list the average daily unit pow level in ME. Net for each day in the reporting month.
- Compute to the nearest whole megawatt.
49 47 t R EV. T/73 e
4-DOCKET NO.
50-244 IINITNAME.8I Ginna Station n
7 1980 -
UNIT SHUTDOWN AND POWER REDUCTIONS DATli Ju- - 2 8 M. ___ ^ - '
COMi*I.liTED fly rew E.
McNainara Hlil' ORT MON'III June, 1980 Tiil.lil'IlONE 1-315-524-4446 Ext. 205, 293 at Cinna 1
49 n
~a2 e**
Cause 8. Corrective e
- "g Licensee ev
.O
~
c Event 2
g.
Ac,;,,,
.j
}s{g No.
Date
=
a.
R*Por' 8 Ad
!0 Prevent Recurrence 8-d E.
j e
2 g
u o
No shutdowns or significant power reductions to report.
I i
1 2
3 4
F: Forced Hcason:
hfechoil:
Exhihis G - Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for l' reparation of Data Il-Maintenance or Tes 2-Manual Scram.
Entry Sheets for 1.icensee j
C-He fueling 3-Autinuatic Scram.
Event Report (1.liR) File (NilREG-D-Regulatory Hestriction 4-Osher (Explain) 0161) li-Operator Training & 1.icense fixamination F-Administrative 5
G-Operational Error (Explain) w
- e... u. a. v. i n.
II-Other (Explain)
Exhihis 1 - Same Source i
.. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-2 4 UNIT Ginna Station DATE July 7, 1980 COMPLETED BY 1~-
Andrew E. McNamar'a TELEPHONE 1-315-524-4446 Ext. 205, 293 at Ginna MONTH June, 1980 The Reactor Power Level was maintained at 1007. for the majority of the month, with the following exceptions of short duration:
6/17 - A power level reduction to N 957. due to a turbine runback.
6/25 - A pcuer level raduction to N 997, to perform a periodic test.
6/27 - A power level raduction to u 977 to perform a periedic test.
6/29 - A pcwer '_ weal raduction to " ?57. to perform Turbine Intercept, Reheat, Main Stean Stop Valves tests.
6/30 - A power level reduction to N 977. to perform a periodic test.
49 113 (1/70)
GINNA STATIGi e
FAINIDULNG EPORT ER JLE,1980 Durig Jt=e, nor:::al inspecticas and :::inor :::aintenance was performed.
Major sifety related maintenance included:
1.
Rep 1=cmt of the pt:mp and bowl assablies en both fire service eter ptmps with a new style assembly that will increase discharge
_ pressure above the required value at rated ficw.
4 j