ML19320B957
| ML19320B957 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/03/1980 |
| From: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| IEB-80-09, IEB-80-9, NUDOCS 8007150553 | |
| Download: ML19320B957 (2) | |
Text
,
m r1 o
w
- 4 v,..
- ..,. i. c,,... n
- q. c C T r,i n [ i i g u....' t,' n^ T '. ", ^
C 0 fi. o f.." Y '
.. m.
m.,..
.,.s
. u y
ILLUMINATihG SLOG. e PUBLIC SOUAPE e CLEVELAND. oHlo 44101 s TELEPHONE (216) 623-1350 e MAIL ADDRESS:
P, o. Box 5000 l
VICE prest 0ENT Serving The Best Location in the Nation Dalwy.) R. Davidson SYSTEM ENGaNEERING AND CONSTRUCTION 1
July 3, 1980 U. S. Nuclear Regulatory Commission Director of Reactor Constructica Inspection, 0.I.E.
Washington, D. C.
20555 Re: Perry Nuclear Power Plant Docket No's 50-440; 50-441 g
Ccastruction Permit No's.
d CPPR-148; CPPR-149 Gentlemen:
On June 18, 1980, we responded to the referenced IE Bulletin i
regarding Hydramotor Actuator Deficiencies.
Infor=ation received 4
subsequent to our response indicates that it should be supplemented 6
with the follcwing, additicnal information.
Litton Industrial Products, Inc. (Contramatics Division) and Fisher Controls Co., Inc. are also supplying ITT General Controls Model NH-90 Series Hydra:utor Actuators.
ITI General Controls has confir=ed that the actuators being supplied by Litton Industrial Products, Inc. utilize No. 2 springs and, therefore, have no possibility of being fabricated frcm incorrect material.
ITI General Controls has also confirmed that the actuators being supplied by Fisher Controls have spring forces below the reduced rating for the No. I springs and, therefore, are not undersized for their intended use.
/p 0
4 8 007150 6b L
a U. S. Nuclear Regulatory Co= mission July 3, 1980 Based on the above information and information reported in our earlier response, we have determined that the deficiencies identified in IE Bulletin No. 80-09 will not affect the performance of any valves at the Perry Nuclear Power Plant.
Very truly yours, je iv?,
[ } jv/.lfq Dalwyn R. Davidson Vice President System Engineering and Construction cc:
Mr. James C. Keppler, Director Region III Office of Inspection and Enforcement 799 Roosevelt Rd.
Glen Ellyn, Illinois 60137 U. S. Nuclear Regulatory Co= mission c/o Document Management Branch Washington, D.C.
20555
/