Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-LTR-95-091, Forwards Third-Yr Interval ISI Plan for Pilgrim Nuclear Power Station + (September 1, 1995)
- ML20217J789 + (September 1, 1995)
- 05000412/LER-1995-005-02, :on 950226,discovered That TS SR 4.2.4a, Quadrant Power Tilt Ratio Calculation Not Performed Due to Personnel Error.Operator Counseled & Surveillance Verification Log Will Be Further Factored + (September 1, 1995)
- 05000282/LER-1995-009, :on 950802,new Thermal Hydraulic Computer Model of Heat Removal Paths to Ultimate Heat Sink Developed.Caused by Design Basis Accident on Unit.Sys Design Changed + (September 1, 1995)
- ML20092A305 + (September 1, 1995)
- ML20092A313 + (September 1, 1995)
- ML20092A290 + (September 1, 1995)
- IR 05000400/1995012 + (September 1, 1995)
- ML17332A907 + (September 1, 1995)
- ML17311B166 + (September 1, 1995)
- ML17311B168 + (September 1, 1995)
- 05000244/LER-1995-007, :on 950803,lost Power from 34.5 Kv Offsite Power Circuit 751 Due to Offsite Electrical Storm,Resulting in Automatic Start of EDG B.Offsite Power Restored,Edg B Stopped & Realigned & Circuit 751 Cleared + (September 1, 1995)
- ML17332A908 + (September 1, 1995)
- ML17059A931 + (September 1, 1995)
- ML16141A948 + (September 1, 1995)
- ML18011B012 + (September 1, 1995)
- ML17228B261 + (September 1, 1995)
- Press Release-95-107, NRC Staff to Conduct Critical RE-EVALUATION of Agencys Activities + (September 1, 1995)
- ML17332A910 + (September 1, 1995)
- TAC:M93238 + (September 1, 1995)
- ML16141A963 + (September 1, 1995)
- ML17291B024 + (September 1, 1995)
- ML20092A270 + (September 1, 1995)
- TAC:M952007 + (September 1, 1995)
- ML17228B263 + (September 1, 1995)
- TAC:M92251 + (September 1, 1995)
- ML20092B105 + (September 2, 1995)
- ML20092B091 + (September 2, 1995)
- ML17311B171 + (September 4, 1995)
- ML20092B161 + (September 4, 1995)
- ML20092B141 + (September 4, 1995)
- ML20114F014 + (September 4, 1995)
- 05000528/LER-1995-004, :on 950329,containment Electrical Penetration Overcurrent Protective Devices Found Outside Design Basis. Caused by Error on Part of Original Architect Engineer. Modified Affected Circuits Critical to Normal Operational + (September 4, 1995)
- 05000528/LER-1995-005, Forwards Suppl LER 95-005 Reporting Six Electrical Penetration Circuits + (September 4, 1995)
- ML18128A308 + (September 5, 1995)
- ML18023A068 + (September 5, 1995)
- ML18023A067 + (September 5, 1995)
- ML17291B018 + (September 5, 1995)
- ML17291B016 + (September 5, 1995)
- Press Release-95-109, NRC Seeks Qualified Candidates for Adviisory Committee on Reactor Safeguards + (September 5, 1995)
- Press Release-95-108, SIX-MONTH Plant Performance Review Results Now Available to Licensees and Public + (September 5, 1995)
- ML18011B009 + (September 5, 1995)
- ML18038B407 + (September 5, 1995)
- ML20098B649 + (September 5, 1995)
- ML20094E067 + (September 5, 1995)
- ML20092G980 + (September 5, 1995)
- ML20092F774 + (September 5, 1995)
- ML20092C566 + (September 5, 1995)
- ML20092C123 + (September 5, 1995)
- ML20092B555 + (September 5, 1995)
- ML20092B533 + (September 5, 1995)
- ML20092B492 + (September 5, 1995)
- ML20092A751 + (September 5, 1995)
- ML20092A720 + (September 5, 1995)
- ML20092A633 + (September 5, 1995)
- ML20092A625 + (September 5, 1995)