Informs That Waterford 3 Preparing to Implement Temporary Changes to Primary Access Point to Facilitate Increased Traffic Flow During Upcoming Refueling Outage Scheduled to Start 950922
ML20094E067
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/05/1995
From: Burski R
ENTERGY OPERATIONS, INC.
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
W3F1-95-0136, W3F1-95-136, NUDOCS 9511070045
Download: ML20094E067 (5)


Text

-. -.-.

g

-=ENTERGY

%} "'l"'"*""*'

R. F. Burski W3F1-95-0136 A4.05 PR September 5,1995 Mr. L.J. Callan Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Modification to Primary Access Point

Dear Mr. Callan:

Please be informed that Waterford 3 is preparing to implement temporary changes to the Primary Access Point (PAP) to facilitate increased traffic flow during the upcoming refueling outage scheduled to start September 22, 1995, with an anticipated completion date of November 5,1995.

Waterford 3 will continue to implement appropriate steps necessary to ensure access to the plant is maintained in accordance with 10CFR73.55(d) requirements.

Waterford is currently planning to make these changes final and shall forward these changes to you in accordance with 10CFR50.54(p).

The attached documentation includes a description of the changes to the PAP which will be in place during our refueling outage.

Attached are drawings depicting the present and temporary configuration of the Primary Access Point.

9511070045 950905 PDR ADOCK 0S000382 P

PDR

(

4 Modification to Primary Access Point W3F1-95-0136 Page 2 September 5, 1995 Should you require additional information concerning this matter, please contact Glenn Zetsch at (505)739-6354.

i Very truly yours, A

R.F. Burski Director Nuclear Safety RFB/GCS/tjs Attachments cc:

C.P. Patel, NRC-NRR I

R.B. Manili NRC-NRR N.S. Reynolds R.B. McGehee NRC Document' Control Desk l

NRC Resident Inspectors Office

Jh

)

i l

Description of Temporary Alteration j

(include affected eauipment and functioni j

Personnel entering the protected area are processed through the Primary Access Point (PAP) which is located in the Access Control Facility.

The Access Control facility conforms to the requirements of 10CFR73.2 as a physical barrier for the protected area.

A layout drawing of the existing 4

PAP is included as sketch SK-B-C-0156, indicating the location of personnel and package monitoring areas and points of entrance and exit.

Personnel access into the protected area is through. turnstiles at the PAP. Waterford 3 has no alternate access point.

During refueling outages the traffic j

throu,gh the PAP is almost tripled during shift changes.

]

This Temporary Alteration will revise the layout of the PAP (See sketch SK-B-C-0157) to help expedite personnel and package monitoring by accomplishing the following:

1) Remove all bump turnstile stands.
2) Remove all rails except exit rail.
3) Swap metal detectors and explosive detectors.
4) Add new Hi-Scan 6040-A X-Ray machine between lanes 1 and 2.
5) Relocate existing X-Ray machine and mirror between lanes 3 and 4.
6) Relocate Sensormatic equipment to front of exit lane.
7) Install new security hollow metal door (DQ12) with lockset in South masonry block wall adjacent to gate turnstile 1.

Items that are delivered into the protected area are inspected visually or through the use of portable detection devices or package X-Ray examination devices.

The metal detection and explosive detection equipment is designed to detect firearms, explosives and incendiary devices at the PAP.

The Sensormatic equipment is designed to alarm locally if a badged personnel does not drop off his badge prior to exiting the PAP.

A hands-on search of persons authorized access is conducted when there is cause to suspect that the individual is attempting to introduce firearms, explosives, or incendiary devices into the protected area, or when the metal and/or explosives detection equipment fails. Alarms for the search equipment annunciate locally at the location of the equipment, as well as inside the Final Access Control Security Office (FACS0).

M3%

8 0C,NC SECYAlf'

, g go, CF8tCt

)

/

l ni x 4rs

\\

t rar-

=Ex i

N

,\\

~

gg

_un..u

,/

o S

SA

~

I gra ocart.c 3

arteroa e,roa

~e

\\

N CM n'

l iOJ3 I

-1llf-

!!!t 1

32 21 gg:f_{x

.j

>$1cIm 1

,$Nro.

s

.[ =

s I

g

,JUw h

a

.J

-T

/

I i

g 4fs gS j5 a f!Cf 0A E

1

.g ali lj g

n g

ro o..

wir=='

3 SLOC.

A 9

_9 i

O

=

=

c 2 3 l l 8

3 E

l l d.

8 a x

s j

9- (

e a

ll l 3

W 5

Ele s,

c5 5

3 s

e

s1 I

/ N

/ N TO Pt asst CL OM

  • x

._..t

.=m M

3. B r 4%CO tufmestit t funer5titt tyses,i1(t itpsats.tItt 2

e..

e....

g._3 E vE0testt moons 45 d5 45 45 a e att Stater 5ttpss esavt a tottatsett or

+1'-0* TOLanteett.

gg ggt grt g;t ze stcunite to attocart mt saoct once arr aos.

'hh

'fh hh hh 3e sutrts to taa 1s-oso tescistgar.ac sessimuCTIoses ron tesstattate(se so'-se sie -

9"-so tre

  • I'-6 3/4 e0'-9 tre
  • 4 attOtatles or Equiratur.

Collass eaccE tust 3

e: -een omer or 5

.I 5

T T

T T

!e; we v

ve ye a

t M

E X_

2L hl h~

i 5

3...

.j 3

a g

Q]

]

-E-if

-j

? ?

-[

~

7ar.__

1 LJ' 1

0 ot t.

7mp. ot t.

Enr.

Ot s.

tar.

ot1.M8f f.

I.

[

au nos 2

i WATERFORD SI.S. (mif NO. 3 g...

=

~- MTEN 1165 MW MSI ALL AllON 1

h

_ v -9 esse 6 y-e sia s -r era

)

8 e -t sie

/

I RECONFIGURATION Of i

u tuait, u sa I

!d PRIMARY ACCESS POINT l

\\

  • a i.

\\ od -

PER TAR 95-010 N

/

SCatEs urs D.

DATE:

8-I-95 EPI. DRAF flNG j

p g

nu

/

SK-B-C-0157 l Nik l Dart l surgeN DESCRIPil0N l BYl CHl APPROVEDTA l

cg r se rienser. - v = a