Forwards Insp Rept 50-400/95-12 on 950709-0805.No Violations Noted
ML18011B012
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/1995
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Robinson W
Carolina Power & Light Co
Shared Package
ML18011B013 List:
References
NUDOCS 9509180343
Download: ML18011B012 (3)


See also: IR 05000400/1995012

Text

September

1, 1995

Carolina

Power

h Light Company

ATTN:

Hr.

W.

R. Robinson

Vice President

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165 - Hail Code:

Zone

1

New. Hill, NC 27562-0165

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/95-12

Dear Hr. Robinson:

This refers to the inspection

conducted

on July 9 - August 5,

1995, at the

Harris facility.

The purpose of the inspection

was to determine

whether

activities authorized

by the license

were conducted safely

and in accordance

with NRC requirements.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

In accordance

with 10 CFR 2.790, of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosure will be placed in the

NRC Public Document

Room.

Sincerely,

Docket No.:

50-400

License No.:

NPF-63

David

.

Ve relli, Chief

Reactor Projects

Branch lA

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

H.

W. Habermeyer,

Jr.

Vice President

Nuclear Services

Department,

Carolina

Power 5 Light Company

P. 0.

Box 1551

'

Mail OHS7

Raleigh,

NC

27602

(cc w/encl cont'd - See

page

2)

950'F i80343 9'509'Oi

PDR

ADQCK 05000400

G

PDR

'

O>>

CP&L

(cc w/encl cont'd)

J.

W. Donahue

Plant Manager

- Harris Plant

Carolina

Power 5 Light Company

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165,

MC:

Zone

1

New Hill, NC

27562-0165

T.

D. Walt, Manager

Regulatory Affairs

Carolina

Power

8 Light Company

Shearon Harris Nuclear

Power Plant

P. 0.

Box 165, Mail Zone

1

New Hill, NC

27562-0165

R.

E. Jones

General

Counsel

- Legal Department

Carolina

Power

E Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environmental

Commerce

5 Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Karen

E.

Long

Assistant Attorney General

State of North Carolina

P. 0.

Box 629

Raleigh,

NC

27602

Public Service

Commission

State of South Carolina

P. 0.

Box 11649

Columbia,

SC

29211

Chairman of the North Carolina

Utilities Commission

P. 0.

Box 29510

Raleigh,

NC

27626-0510

Robert

P. Gruber

Executive Director

Public Staff NCUC

P. 0.

Box 29520

Raleigh,

NC

27626

Distribution w/encl:

(See

page 3)

E8 'd 1'.OJ.

< <>>WbQC 1v

NC'str

b tion w enc1.

0. Yerrellf, RII

N. Le,

NRR

G. A. Ha't'fstrom, RII

PUBLIC

OL

+ SNAB py

(M.Je('d( mouO

NRG Resident

Inspector

U. S. Nuclear Regulatory Ccmnissian

5421

Shearon Harris

Road

Hew Hilt, NC

27562-9998

OFF(CC

TO

Rl(>OR

R 0

DATE

IS

IPI

S

NO

VSS

NO

OB

YES

NO

OS I

I QS

YES

NO

OS I

198

OS

/95

YES

NO

YES

NO

OFFICIAL

(CORD COPY

Q(EUN NT::AN%&

"12'8d

8>S8 v98 6E6

Mdvt:v

96-E8-d3S

'IHR