Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17037B943 +
- L-76-426, Letter Relating to Review of 05000335/1976013 and Informing the NRC That It Does Not Contain Any Proprietary Information +
- ML18088B159 +
- ML18191A260 +
- ML19347A625 +
- ML19347A624 +
- ML19347A623 +
- ML19261F253 +
- ML18227D502 +
- L-76-428, Provide Model Tech Spec Re Steam Generator Tube Surveillance Requirements +
- ML19317F421 +
- ML19317F414 +
- ML19317F413 +
- ML19312C301 +
- ML19329A643 +
- ML19329A642 +
- ML20056B857 +
- ML20086F409 +
- ML20084A061 +
- ML20148M724 +
- ML20148M775 +
- ML20141L939 +
- ML20133G739 +
- ML20133G971 +
- ML20127C433 +
- ML20198F010 +
- ML20236F019 +
- ML20196F463 +
- ML20133N836 +
- 05000271/LER-1976-044-03, /03L:on 761121,during MSIV Partial Closure Testing,Reactor Protection Sys Relay 5A-K3F Deenergized Normally,Then Reset.Caused by Failure of Limit Switch. Return Springs Replaced.Further Action Will Be Taken +
- 05000272/LER-1976-023-03, /03L:on 761201 & 03,boron Injection Tank Parallel Suction Valves 1SJ4 & 1SJ5 & Parallel Discharge Valves 1SJ12 & 1SJ13 Cleared of Electrical Power & Tagged.Caused by Personnel Error.Procedure Revised +
- 05000272/LER-1976-025-03, /03L:on 761215,stuck Rod Moved to Maintain Reactor Critical While Measuring Stuck Rod Worth During Low Power Testing.Caused by Slight Overdilution of Reactor Coolant Boron Concentration +
- ML19347A669 +
- ML20037A789 +
- ML20039H242 +
- ML19329B682 +
- ML19329C473 +
- ML19329C496 +
- ML19329F234 +
- ML20039H207 +
- ML19320A472 +
- ML19317F944 +
- ML19317G014 +
- ML19291A488 +
- ML19291A471 +
- IR 05000289/1976026 +
- ML19261E875 +
- ML13308B522 +
- ML20039H203 +
- ML19329F310 +