ML13308B522

From kanterella
Jump to navigation Jump to search
Informs That IE Bulletin 75-04A Requirement for Progress Repts Re Fire Protection & Emergency Shutdown Reviews Terminated
ML13308B522
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/20/1976
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Woodbury R
SOUTHERN CALIFORNIA EDISON CO.
References
IEB-75-04A, IEB-75-4A, NUDOCS 8103110101
Download: ML13308B522 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V SUITE 202, WALNUT CREEK PLAZA 1990 N. CALIFORNIA BOULEVARD WALNUT CREEK, CALIFORNIA 94596 Southern California Edison Company Docket No. 50-206 P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Mr. Rollin E.-Woodbury Vice President & General Counsel Gentlemen:

Item 6 of IE Bulletin 75-04A required monthly progress reports for incomplete procedure changes and facility modifications resulting from the fire protection and emergency shutdown procedure reviews which were conducted following the Browns Ferry fire. Fire protection reviews are now being handled by the Office of Nuclear Reactor Regulation (NRR) in accordance with Appendix A to Branch Technical Position 9.5-1.

The changes related to emergency shutdown are either complete or the comple tion schedule has been established. For these reasons, the requirement for progress reports in IE Bulletin 75-04A (Item 6) is hereby terminated.

Sincgrely, R K'g ng1en I Arector cc: H. L. Ottoson, SCE 0

0/UTIOi o