L-76-428, Provide Model Tech Spec Re Steam Generator Tube Surveillance Requirements
| ML18227D296 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/20/1976 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Lear G Office of Nuclear Reactor Regulation |
| References | |
| L-76-428 | |
| Download: ML18227D296 (4) | |
Text
'Mr."George Lear QQ.ETTE R IFI,OR IG INANE CI COP Y DESGRIPTIPN 0 NOTO R IZE D
~
I'FUNC'LASSI F IED
)
I FIIIU F VI4M I aw (2 76)
NRC DISTRIBUTION FoR PROP INPUT FORM
~
ENCLOSURE
~
C
~
~
T 50 DOCKET MATERIAL FROM:
Florida Power 6 Light Company Miami, Florida Mr. Robert E. Uhrig
'FILE NUMBER ~
5O-Z5O/Zj~
DATE OF DOCUMENT
,. 12/20/76 DATE'RECEIVE 0
.; 12/27/76 NUMBER OF COPIES RECEIVED
<<k One signed
~
~
Ltr. re our 9/8/76 ltr. and their 10/27/76 and ll/24/76 ltrs....concerning Steam Generator. Surveillance.
PLANT NAME:
Turkey Point Units 3 & 4 (2-P)
IItIt)ioiiIl.QADI)
Do Not It'8'II')ove SAFETY ASSIGNED AD:
u Qg.
OJEC MANA E L C
-ASST L'e r
. 'Elliott Parrish FOR ACTION/INFORMATION PROJECT MANAGER LIC
.ASST-'2 30 7
RJL..
~
Vt
~
G F.
NRC.PDR I &E OELD GOSSICK & STAFF MIPC CASE HARLESS PROJECT MANAGEMENT BOYD P ~ COLLINS HOUSTON PETERSON MELTZ INTERNALD
- SYSTEMS SAFETY HEINEMAN SCHROEDER 4
I 0 I 4 ~ I I
~ 1
. -ENGINEERING KNIGHT
'SDSEIL
"'AWLICK REACTOR SAFE ROSS -.
NOVAK ROSZTOCZY CHECK ISTRl BUTION PLANT SYSTPi'IS '
TEDESCO 0
IPPOLITO
~
~ ~
~
OPERATING~REACTORS STELLO.
OPERATING TECH EISENHUT SITE SAFE E
T 0 ERNST BALLARD SPANGLER =ii~
s.a-SITE TECH GAD'IILL STEPP HULMAN SITE ANALYSIS VOLLMER HELTEMES SKOVHOLT PDR I'IC:
NSIC:
ASLB:
r ida AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION BAT LAB REG V.IE LA PDR CONSULTANTS:
B 00k ULRIKSON OR J,
COLLINS KREGER CONTR OL NUiM8 E R ACRS CYS 86BBIWO/ E T NRC FORM 196 I2 76)
~
~
~
'L
P. O. BOX 013100, MIAMI, FL 33101 FLORIDA POWER 8 LIGHT COiVIPANY Decem 20, 1976 L-(~e4 Office of Nuclear Reactor Regulation
, g~
.*~
Attention:
Mr. George Lear, Chief Operating Reactors Branch N3 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Lear:
Re:
Turkey Point Units 3
& 4 Docket Nos.
50-250 6 50-251 Steam Generator Surveillance Your letter of September 8,
1976 provided model technical specifications for Turkey Point Units 3 and 4 regarding steam generator tube surveillance requirements.
Our letter L-76-372 of October 27, 1976 stated that we would review and, in effect, establish our position on the model technical specifications by December 20, 1976.
Since October, there has been considerable activity relative to the condition of steam generator tubes at Turkey Point.
We began a joint inspection program with other utilities and Westinghouse Electric Corporation that was designed to investi-gate the status of steam generator tubes which had small radius U-bends.
The Unit.
4 inspection results were forwarded to you in our letter L-76-403 of November 24, 1976.
The Unit 3 portion of this inspection program was recently completed and a letter is being prepared to forward the results to you.
This issue has been the subject of NRC licensing action (Amendment 20 for Turkey Point Unit 4, effective December 3, 1976),
and we are keeping the NRC staff advised of the latest inspection results.
As part of the overall program, Westinghouse is continuing their analysis of tube samples and other data, and there is the possibility that new information may be developed.
Therefore, we feel that additional technical specifications on steam generator tube surveillance are not appropriate at this time.
In addition, we have been conducting steam generator Eddy Current (EC) testing at each refueling outage, even though it has not been a technical specification requirement.
We PEOPLE... SERVING PEOPLE
Office of Nuclear Reactor Regulation Attention:
Mr. George Lear, Chief Page Two plan, at this time, to continue the practice of EC testing during future refueling outages.
Very truly yours, '.
Robert E. Uhrig Vice President REU/MAS/cpc cc:
Mr. Norman C. Moseley Robert Lowenstein, Esquire