Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067D355 + (February 18, 1994)
- ML20024J197 + (February 18, 1994)
- ML20063L414 + (February 18, 1994)
- ML20029C618 + (February 18, 1994)
- ML19346E775 + (February 18, 1994)
- ML18100A930 + (February 18, 1994)
- ML18100A901 + (February 18, 1994)
- ML18100A898 + (February 18, 1994)
- ML18100A896 + (February 18, 1994)
- 05000255/LER-1992-031, :on 920402,left Channel DBA Sequencer Inadvertently Activated by Technician Preparing to Test Left Normal Shutdown Sequencer Due to Inadequate Test Procedures. Procedures RT-13A & B & RT-8C & D Revised + (February 18, 1994)
- 05000255/LER-1994-001, :on 940121,both Trains of Control Room Emergency Heating,Ventilation & Air Conditioning Inoperable. Caused by Screen Plugged W/Ice & Snow.Surveillance Procedure Revised + (February 18, 1994)
- 05000250/LER-1994-001-01, :on 940119,failure of SV-4-2924 to Fully Change Position Occurred Due to Failure of SVs to Change Position When de-energized.Normally Energized SVs Being Replaced W/ Normally de-energized Valves + (February 18, 1994)
- ML17331B229 + (February 18, 1994)
- IR 05000335/1994001 + (February 18, 1994)
- ML16293A822 + (February 18, 1994)
- ML17263A539 + (February 18, 1994)
- ML14178A447 + (February 18, 1994)
- ML14178A445 + (February 18, 1994)
- ML17310B057 + (February 18, 1994)
- ML17228A784 + (February 18, 1994)
- TAC:M87931 + (February 18, 1994)
- ML17228A450 + (February 18, 1994)
- ML14178A448 + (February 18, 1994)
- ML20063L419 + (February 18, 1994)
- ML20067D363 + (February 18, 1994)
- ML25259A198 + (February 18, 1994)
- ML16139A433 + (February 19, 1994)
- ML16139A435 + (February 19, 1994)
- TAC:M83363 + (February 19, 1994)
- ML20063L604 + (February 21, 1994)
- ML20063L217 + (February 21, 1994)
- ML20063L014 + (February 21, 1994)
- ML20063L009 + (February 21, 1994)
- ML20071A935 + (February 21, 1994)
- 05000265/LER-1994-001, Forwards LER 94-001-00.IST Procedures Revised to Incorporate Interim Procedure Requirements & RCIC Pump Tested Using Revised Procedures + (February 21, 1994)
- BSEP-94-0076, Responds to NRC Re Violations Noted in Insp Repts 50-324/93-58 & 50-325/93-58.C/A:addl Engineering & Nad Oversight for Vendors Tool Qualification Testing Is Being Provided + (February 21, 1994)
- LD-94-011, Forwards Rev to CESSAR - Design Certification Documenting Resolution of NRC Concern on Small Break LOCA W/Boron Dilution + (February 21, 1994)
- 05000325/LER-1994-004, :on 940126,loss of RPS a Bus Power & Associated ESF Actuations Occurred.Caused by Operator Error.Reviewed Event W/Involved Operator + (February 21, 1994)
- 05000265/LER-1994-001-03, :on 940216,RCIC Failed to Meet TS Flow & Pressure Requirements.Caused by Increased Clearances Between Pump Shaft Throttle Sleeve & Throttle Bushing & Wear Rings Reducing Margin of Performance.Rotating Element Replaced + (February 21, 1994)
- 05000338/LER-1994-001-02, :on 940122,EDG Fuel Oil Transfer Pumps Declared Inoperable Due to Improper Greasing of Pump Motor Bearings.Fuel Oil Pump House Exhaust Fans Secured & Portable Heaters Installed + (February 21, 1994)
- 05000424/LER-1994-001-02, :on 940202,transmitter Swung on Mounting Bolts & Impacted Handle of Isolation Valve for Sensing Line Causing Valve to Open.Caused by Personnel Error.Review Performed to Evaluate Use of test-in-bypass + (February 21, 1994)
- ML17228A466 + (February 22, 1994)
- ML17228A465 + (February 22, 1994)
- ML17228A456 + (September 30, 1991)
- ML17228A457 + (February 22, 1994)
- ML17334B499 + (February 22, 1994)
- ML17331B279 + (February 22, 1994)
- ML17331B278 + (February 22, 1994)
- ML17331B277 + (February 22, 1994)
- ML17331B276 + (February 22, 1994)
- ML17331B274 + (February 22, 1994)
- ML17352A467 + (February 22, 1994)
- ML18037A765 + (October 21, 1993)