FORD I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~
~
~
ACCESSION NBR:9402240036
DOC.DATE: 94/02/18
NOTARIZED: NO
DOCKET I
FACIL:50-315 Donald C.
Cook Nuclear
Power Plant, Unit 1, Indiana
M
05000315
50-316 Donald C.
Cook Nuclear
Power Plant, Unit 2, Indiana
M
05000316
AUTH.NAME
.
AUTHOR AFFILIATION
RING,M.A.
Region
3 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
FITZPATRICK,E.
Illinois Power
Co.
SUBJECT:
Forwards insp repts
50-315/93-25
a 50-316/93-25
on
940124-28.No violations noted. Operating portion of
requalification
exam administration
on facility control
room simulator not observed.
DISTRIBUTION CODE:
IE42D
COPIES
RECEIVED:LTR /
ENCL /
SIZE: 8+'
TITLE: Operator Licensing Examination Reports
NOTES:
RECIPIENT
'OPIES'D
CODE/NAME
LTTR ENCL
PD3-1
1
1
INTERNAL: N~
H HHFBPT
1
0
R
FILE
02
1
1
RECIPIENT
ID CODE/NAME
HICKMANIJ
NRR/DRCH/HOLB10
RGN3
FILE
01
COPIES
LTTR ENCL .
1
1
1
1
1
1
EXTERNAL: NRC
1
1-
NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAh<E FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
8
ENCL
7
February 18,
1994
Docket
No. 50-315
Docket
No. 50-316
Company
ATTN:
Hr.
E.
E. Fitzpatrick
Vice President
1 Riverside
Plaza
Columbus,
OH
43216
Dear Hr. Fitzpatrick:
The enclosed
report refers to the inspection
and re-take operating
examinations
conducted
by Hr.
C. Osterholtz
and Hr.
D. Shepard of this office
on January
24
28,
1994.
The inspection
evaluated activities at the
D.
C.
Cook Nuclear
Power Station,
Units
1 and 2, authorized
by
NRC 'Operating
License
Numbers
and
We discussed
our inspection findings with Mr. K.
Baker
and
members of your staff at the exit interview on January
28,
1994.
I
The purpose of the inspection
was to assess
the licensed
operator
requalification program.
The inspectors
reviewed training administrative
procedures,
representative
records,
r equalification training materials,
and
observed
licensed
operators during'equalification
examination administration.
Additionally, the inspectors
interviewed
members of the operations
and
training staffs.
The operating portion of requalification examination administration
on the
facility's control
room simulator
was not observed
in this inspection.
The
simulator portions of the operating test
(scenarios
and job performance
measures)
are being deferred until additional training
on control
room
upgrades
is complete.
Weaknesses
in your program administrative guidelines notwithstanding,
the.
inspectors
concluded that the licensed operator requalification training
program
was being
implemented
in accordance
with 10 CFR Part 55 requirements.
Re-take
dynamic simulator operating
examinations
were administered
to two
initial operator licensing candidates,
one senior reactor operator instant
and
one senior reactor operator
upgrade.
Both candidates
passed
the examinations.
4
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter
and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
9402240036
9402i8
ADOCN 05000355
8
1
4
Company
February
18,
1994
We will gladly discuss
any questions
you may have concerning
the inspection or
administered
operating
examinations.
Sincerely,
Enclosures:
l.
Inspection
Reports
No. 50-315/93025(DRS);
No. 50-316/93025(DRS)
2.
Simulation Facility Report
cc w/enclosure:
A. A. Blind, Plant Manager
OC/LFDCB
Resident
Inspector,
RIII
James
R. Padgett,
Michigan Public
Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
D.
C. Cook,
LPM,
R. Gallo,
LOLB,
M.
W. Hodges,
Rl
A. F. Gibson,
RII
S. J. Collins,
RIV
K.
E. Perkins,
RV
B. Boger,
RCHF,
J.
S. Wermiel,
HFAB,
bcc:
PUBLIC IE-42
Original Signed By
Mark A. Ring, Chief
Operations
Branch
RIII
RIII
RIII
Osterholtz/lc
Burdick
Kropp
2/
94
2/
/94
2/
/94
~RI I
Ring
2/g/94
Company
February 18,
1994
We will gladly discuss
any questions
you may have concerning
the inspection or
administered
operating examinations'incerely,
Enclosures:
1.
Inspection
Reports
No. 50-315/93025(DRS);
No. 50-316/93025(DRS)
2.
Simulation Facility Report
cc w/enclosure:
A. A. Blind, Plant Manager
OC/LFDCB
Resident
Inspector, RIII
James
R. Padgett,
Michigan Public
Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
D.
C.
Cook,
LPM,
Original Signed By
Mark A. Ring, Chief
Operations
Branch
cS
R 'I
Os erholtz/lc
2/ISA 4
RlQ
Burdock
2/ l9/94
RIII
Kropp
2/g /94
RIII
Ring
2/
/94