ML17352A467

From kanterella
Jump to navigation Jump to search
Forwards fitness-for-duty Program Performance Data for Period Ending 931231
ML17352A467
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 02/22/1994
From: Bohlke W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-42, NUDOCS 9403040378
Download: ML17352A467 (12)


Text

ACCELERATED DISTRIBUTION DEMONSTPWTION SYSTEM t

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9403040378 DOC.DATE: 94/02/22 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000250 05000251 05000335 05000389 R

D

SUBJECT:

Forwards fitness-for-duty program performance data for period ending 931231.

8 DISTRIBUTION CODE:

A021D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7 NOTES RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME CROTEAU,R COPIES LTTR ENCL 1

1 A

D D

INTERNAL: ACRS NUDOCS-ABSTRACT RGN2 02 EXTERNAL: NRC PDR 1

1 1

1 1

1 NRR/~DRSS/

SGB REG FILE 01 NSIC 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE AVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

l t

0

Florida Power & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 FEB22 AN L-94-42 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Semi-Annual Fitness-for-Duty Pro ram Performance Data Gentlemen:

In accordance with 10 CFR 26.71(d),

please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1993.

Should you have any questions, please contact us.

Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB:abk Attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC Turkey Point Senior Resident Inspector, USNRC, St. Lucie Plant 28Oi.span 940'5040578 940222 PDR ADOCK 05000250 PDR an FPL Group company P,t I

p J

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 Florida Power 8 Li ht Company Oecember 31 1993 6 Months Ending Turke Point Plant Location Arthur R. Cwmin s Contact Name 407 694-3573 Phone (Include Area Code)

Cutoffs:

Screen/Confirmation (ng/ml)

Appendix A to 10CFR 26 Marijuana 50 / 10 Amphetamines 300 / 500 Cocaine Opiates 300 / 150 Phencyclidine 25 / 25 300 / 200 Alcohol (XBAC)

.04K TESTING RESULTS LICENSEE EMPLOTEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL Average Number with Unescorted Access 1180 287 259 CATEGORIES TESTED POSITIVE

¹ TESTED POSITIVE

¹ TESTED POSITIVE Pre-Access For Post Accident Observed Behavior 56 202 616 153 132 Follow-up 14 Other TOTAL 153 334

Breakdown of Confirmed Positive Tests for Specific Substances Licensee Eaployees Long-Term Contractors Short-Term Contractors Narijuana Cocaine Op'Iates Ash etM-liness Phency-clidine Alcohol Refusal to Test 3

4 5

Total

    • ALL OF THE POSZTZVE DRUG TESTS LZSTED ABOVE EXCEEDED THE DHHS/NRC CUTOFF LEVELS'

MANAGEMENT ACTIONS TURKEY POINT PLANT Medical Services Contract Turnover Florida Power and Light awarded a new contract to Whole Health Medical Corporation.

This company provides MRO services and collection technicians.

The company replaces Industrial Medical Corporation and began services December 27, 1993.

Ritness for Duty Program Performance Data Personnel Subject to l.OCRR 26 Florida Power S Li ht Cocpany December 31 1993 6 Honths Ending St. Lucie Plant Location Arthur R. Cunnin s Contact Naae 407 694-3573 Phone (Include Area Code)

Cutoffs:

Screen/Confirmation (ng/ml)

Appendix A to 10CFR 26 Harijuana 50 / 10 Amphetamines 300 / 500 Cocaine Opiates 300 / 150 Phencyclidine 25 / 25 300 / 200 Alcohol (XBAC)

.04K TESTING RESULTS LICENSEE EHPLOYEES LONG-TERH CONTRACTOR PERSONNEL SNORT-TERH CONTRACTOR PERSONNEL Average Number with Unescorted Access 1432 CATEGORIES TESTED POSITIVE

¹ TESTED

¹ POSITIVE

¹ TESTED POSITIVE Prc-Access For Post Accident Observed Behavior 247 Follow-up 45 Other

'TOTAL 359

Breakdown of Confirmed Positive Tests for Specific Substances Licensee Eaployees Long-Term Contractors Short-Term Contractors Harijuana Cocaine Opiates Aaphet-mllnes Phency-clidine Alcohol Refusal to Test 1

2 3

Total All of the positive drug tests listed above exceeded the DHHB/NRC cutoff levels.

~

~

II MANAGEMENT ACTIONS ST LUCIE PLANT Medical Services Contract Turnover Florida Power and Light awarded a new contract to Whole Health Medical Corporation.

This company provides MRO services and collection technicians.

The company replaces Industrial Medical 'Corporation and began services December 27, 1993.

A