Ccmm::nw: tith Edison O
1400 Opus Place Downers Grove. lilinois 60515 February 21,1994 Dr. Thomas E. Murley, Director Oflice of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Subject:
Correction to the Byron /Braidwood Proposed License Amendment Regarding Implementation of Generic Letter 90-09, " Alternative Requirements For Snubber Visual Inspection Intervals and Corrective Actions" Byron Station Units 1 and 2 NPF-37/66; NRC Docket Nos. 50-454/455 Braidwood Station Units 1 and 2 NPF-72/77; NRC Docket Nos. 50-456/457
References:
- 1. D. M. Saccomando Letter to T. E. Murley dated August 27,1993
- 2. Generic Letter 90-09, " Alternative Requirements For Snubber l
Visual Inspection Intervals and Corrective Actions"
Dear Dr. Murley:
During review of the subject proposed license amendment, Mr. George Dick of your Staffidentified a deviation between the proposed wording on Byron Technical i
Specification page 3/4 7-22 and Generic Letter 90-09. The proposed wording on the subject Braidwood Technical Specification page was, however, consistent with the Generic Letter. Commonwealth Edison Company, therefore, wishes to correct the proposed wording in the Byron amendment to be consistent with the Generic Letter.
I t
k;\\nla\\bTdwdisnubcar\\1 i
9403030144 940221 15 fiM
- DUl {
PDR ADOCK 05000454 8
P PDR R
1
^..
Dr. T. E. Murley 2
February 21,1994 Attachment A to this letter contains a copy of the affected Byron Technical -
Specification page (page 3/4 7-22) and the associated Insert A. The word
" category" on Insert A has been changed to " type". Please incorporate this change into the proposed Byron amendment.
Please address any further comments or questions regarding this matter to this office.
Respectfully, l
L k. Yaut
.Of Joseph A. Bauer Nuclear Licensing Administrator i
i JAB /gp Attachment P
cc:
G. F. Dick, Byron Project Manager - NRR R. R. Assa, Braidwood Project Manager - NRR H. Peterson, Senior Resident Inspector - Byron S. G. Dupont, Senior Resident Inspector - Braidwood B. Clayton, Branch Chief-Region III
~
Office of Nuclear Facility Safety -IDNS