Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17325B379 +
- ML18022A778 +
- ML17347B588 +
- ML20012B904 +
- ML20012B902 +
- ML20012B694 +
- ML20012B374 +
- ML20012B345 +
- ML20012B092 +
- ML20012B094 +
- ML20012A866 +
- ML20012A680 +
- ML20012A675 +
- ML20012A674 +
- RBG-32417, Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits +
- ML20012A403 +
- ML20012A366 +
- ML20012A363 +
- ML20012A271 +
- ML20012A270 +
- ML20012A136 +
- ML20012A186 +
- ML20012A158 +
- ML20012A149 +
- ML20012A147 +
- NRC-90-0028, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses +
- ML20012A130 +
- ML20012A126 +
- ML20012A104 +
- ML20012A103 +
- ML20012A092 +
- ML20012A076 +
- ML20012A072 +
- ML20012A071 +
- ML20012A011 +
- ML20011F425 +
- ML20011F420 +
- 05000255/LER-1989-023, :on 891010,identified That U-bolt Connection Assembly for Main Steam Line Support Structure Exceeded Stress Allowed by FSAR by Approx 14%.Caused by Inadequate Review of Analyses by Vendor +
- ML18054B472 +
- ML18153C126 +
- ML18153C128 +
- ML20135E245 +
- RBG-33449, Annual Rept Per 10CFR50.59(b)(2) 890301-900301 +
- 05000266/LER-1989-008-01, Advises That Tech Spec Change Request to Clarify Table 15.3.5-3,Item 3.b Re ATWS Mitigating Actuation Circuitry Automatically Bypassed at Power Level Greater than 40% Power Level,Per LER 89-008-01 Will Be Submitted by 900412 +
- 05000254/LER-1989-024-03, :on 891214,main Turbine Unexpectedly Tripped Following Isolation of Reactor Water Level Switch.Caused by Channel B Having Been Previously Replaced W/Switch That Operated Reverse of What Is Required +
- 3F0390-02, Comments on risk-based Insp Guide for Plant.Guide Does Not Reflect Results of Plant Pra.Package of Results of Latest Quantification Encl +
- ML20042D657 +
- BSEP-90-0204, Revised Response to NRC Re Violations Noted in Insp Repts 50-325/88-33 & 50-324/88-33.Corrective Actions: Task Team Established to Develop Definition of Rework for Site +
- ELV-01399, Forwards Completed Questionnaire in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Input Survey. Info Provides NRC W/Insight on Time Managers Spend on Responding to Insps & Audits +
- ELV-01389, Responds to Violations Noted in Insp Repts 50-424/89-35 & 50-425/89-40 on 891202-900105.Corrective Actions:Qc Hold Points Not Assigned for Lifting of Wires & QC Hold Points Assigned for Retermination of Wires +