Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249B439 + (ML20249B439)
- ULNRC-03847, Forwards Response to 980519 RAI Re GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps. Encl Supplements Util Initial Response to Subject GL + (ML20249B440)
- ML20249B441 + (ML20249B441)
- ML20249B443 + (ML20249B443)
- ML20249B444 + (ML20249B444)
- ML20249B445 + (ML20249B445)
- ML20249B446 + (ML20249B446)
- ML20249B447 + (ML20249B447)
- ML20249B448 + (ML20249B448)
- ML20249B449 + (ML20249B449)
- ML20249B450 + (ML20249B450)
- ML20249B451 + (ML20249B451)
- ML20249B452 + (ML20249B452)
- ML20249B453 + (ML20249B453)
- ML20249B454 + (ML20249B454)
- ML20249B455 + (ML20249B455)
- ML20249B456 + (ML20249B456)
- ML20249B457 + (ML20249B457)
- ML20249B458 + (ML20249B458)
- ML20249B461 + (ML20249B461)
- DD-98-06, Directors Decision DD-98-06 Under 10CFR2.206.Petitioner Requested That NRC Take Action Re Concerns About Ability of Plant SGs to Withstand Major Seismic Event.Petitioner Requested Action Denied + (ML20249B462)
- ML20249B463 + (ML20249B463)
- ML20249B464 + (ML20249B464)
- ML20249B465 + (ML20249B465)
- ML20249B466 + (ML20249B466)
- ML20249B467 + (ML20249B467)
- ML20249B468 + (ML20249B468)
- ML20249B471 + (ML20249B471)
- ML20249B473 + (ML20249B473)
- ML20249B474 + (ML20249B474)
- ML20249B476 + (ML20249B476)
- IR 05000354/1998003 + (ML20249B478)
- ML20249B480 + (ML20249B480)
- ML20249B481 + (ML20249B481)
- ML20249B482 + (ML20249B482)
- ML20249B483 + (ML20249B483)
- ML20249B484 + (ML20249B484)
- ML20249B487 + (ML20249B487)
- 05000352/LER-1998-008-01, Forwards LER 98-008-01 Re Pressure Setpoint Drift of Thirteen Main Steam Sys SRVs Primarily Caused by Corrosion Induced Bonding within SRVs + (ML20249B488)
- 05000352/LER-1998-008, :on 980429,discovered Pressure Setpoint Drift of Five Main Steam Sys Srvs.Caused by Corrosion Induced Bonding.Replaced Fourteen SRV Pilot Valves W/Calibr Spares During 1R07 & Util Is Evaluating three-stage SRV Design + (ML20249B490)
- JAFP-98-0195, Responds to NRC Re Violations Noted in Insp Rept 50-333/98-01 on 980222-0419.Corrective Actions:Surveillance Test Procedure ST-39D Revised to Establish Test Methods That Demonstrate Capability of Each SGTS Train + (ML20249B491)
- ML20249B492 + (ML20249B492)
- ML20249B494 + (ML20249B494)
- B17323, Monthly Operating Rept for May 1998 for Millstone Nuclear Power Station,Unit 3 + (ML20249B495)
- ML20249B496 + (ML20249B496)
- ML20249B497 + (ML20249B497)
- ML20249B498 + (ML20249B498)
- LR-N980305, Forwards Proposed Rev 5 to Salem & Hope Creek Generating Stations,Security Contingency Plan.Summary of Proposed Changes to Plan Included,Per 10CFR50.4(b)(4).Encl Withheld + (ML20249B499)
- ML20249B501 + (ML20249B501)
- ML20249B503 + (ML20249B503)
- ML20249B504 + (ML20249B504)