Discusses 980616 Telcon Between J Williams & M Santiago Re Arrangements Made for Administration of Licensing Exams at Pilgrim Facility During Wk of 981019
ML20249B467
Person / Time
Site: Pilgrim
Issue date: 06/17/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Olivier L
BOSTON EDISON CO.
References
NUDOCS 9806230186
Download: ML20249B467 (4)


Text

.-

o

'N June 17,J1998-L H

{

Mr. Leon J. Olivier

. Vice President - Nuclear Operations / Station Manager -

' Boston Edison Company 4

-Pilgrim Nuclear Power Station 600 Rocky Hill Road l.-

Plymouth, Massachusetts 02360-5599

SUBJECT:

SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS - PILGRIM i

Dear Mr. Olivier:

-j

.J in a telephone conversation on June 16,1998, between Mr. Julian Williams and l

.Mr. Mark Santiago, arrangements were made for the administration of licensing j

examinations at the Pilgrim facility during the week of October 19,1998.

A's' agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revision 8, if NUREG-1021," Operator Licensing Examination Standards for Power Reactors." The.NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination 1

l" outlines by August 10,1998. The written examinations, operating tests, and the supporting reference materials requested by the chief examiner will be due by I

September 17,1998. Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance'with ES-302, your staff should retain the original simulator performance data

(.e.g., system pressures, temperatures, and levels) generated during the dynamic operating l

tests until the examination results are final.

' Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To' permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and -

budget (OMB) approval number 3150-0090],' medical certifications (OMB approval number 3150-0024),and waiver request (if any) (OMB approval number 3150-0090)at least 30

_ days before the first examination date.- If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications 9

- certifying that all training has been completed should be submitted at least 14 days before

?

- the first examination date.

l1 9906230 990617'

-PDR K 05000293 s

-V, PDR l

p.

m_.___________i-____._.

m u

r.

.y Mr. Leon J. Olivier.

2

. This letter contains information collections that subject to the Paperwork Reduction Act of:

L 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101,which~~ expires on

April 30,2000.

- The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including.

suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202,(3150-0101), Office of Management and Budget,-

. Washington, DC 20503.

.The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Santiago has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Williams at (610) 337-5124 or me at (610) 337-5183.

Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-293 a _ ____ _

~

L.

~~

l.-

! 6-Mr. Leon 'J. Olivieri 3

cc w/ encl:

R. Ledgett, Executive Vice President - Operations C. Goddard, Plant Department Manager ll N. Desmond, Regulatory Relations O. Tarantino, Nuclear Information Manager

" T. Sullivan, Manager - Nuclear Training & Management Services i

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts f

The Honorable Therese Murray The Honorable Joseph Gallitano

' B. Abbanat,' Department of Public Utilities Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee l

. Plymouth Civil Defense Director

' P. Gromer, Massachusetts Secretary of Energy Resources

- J. Miller, Senior issues Manager J. Fleming A. Nogee, MASSPIRG

- Office of the Commissioner, Massachusetts Department of Environmental Quality Engineering Office of the Attorney General, Commonwealth of Massachusetts T. Rapone, Massachusetts Executive Office of Public Safety

. Chairman, Citizens Urghg Responsible Energy Commonwealth of Mastrachusetts, SLO Designee l

i l

i

'i i

)

1 I

1 2_

.i

e 4

Mr. Leon J. Olivier 4

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC.

NRC Resident inspector R. Conte, DRS J. Williams, DRS C. Cowgil, DRP-R. Summers, DRP C. O'Daniell, DRP B. McCabe, OEDO C. Thomas, NRR (COT)

A. Wang, NRR inspection Program Branch, NRR (IPAS)

DOCDESK OL Facility File DRS File -

DOCUMENT NAME:' G:\\0LHP\\ WILLIAMS \\SROEXAM.Pil T3 tocolve a copy of this document. Indicate In the box:

"C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No Copy OFFICE - Rl/DRS gg l

Rl/DRS gj

/

l l

[

NAME JWilliams

RConte F DATE 06/17/98 06//798 06/ /98 06/ /98 06/ /98 OFFICIAL RECORD COPY