ML20249B498

From kanterella
Jump to navigation Jump to search
PNO-76-108:on 760629,craft Strike Commenced at Plant & Will Probably Continue Until Sometime After July 4th Weekend. Effect of Strike Has Not Been Determined.Project Schedule Assumed to Be Lengthened 1 Day for Each Day of Strike
ML20249B498
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/01/1976
From: Roy G, Thompson D, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-108, NUDOCS 9806230226
Download: ML20249B498 (1)


Text

- __ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ _

l h  ! /* $  % 0 1 i .)

w

)

PRELIMINARY NOTIFICATION

~

July 1, 6 76 l

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-108 ,

This preliminary notification constituted EARLY notice of an event of {

POSSIBLE safety or public interest significance. The information Presented is as inithily received without verification or evaluation and is basically all that is known by IE staff on this date. .

Fec.ility: Commonwealth Edison, LaSalle 1 & 2 (DN 50-373 & 50-374) g AA

Subject:

CRAFT STRIKE AT LaSALLE NUCLFaR STATION Commonwealth Edison Company informed Region III that the craft strike that commenced at LaSalle on June 29, 1976, will probably continue a until sometime after July 4th weekend. No negotiations between the ,

Company and the Union are being conducted today. No violence or j problems have been reported. g

' s  %

The overall effect. of the strike has not been determined; however, it is assumed that the project construction schedule will be lengthened one day for each day of the strike.

This PN is being issued at this time because the length of the strike is expected to last longer than seven days.

t Region III received notification of this occurrence by telephone from the QA Supervisor from Commonwealth Edison Company on June 29, 1976, l (10:00 AM).

4

Contact:

.RFWarnick, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution:

Chairman Rowden Commissioner Mason S. J. Chilk, SECY A

, Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE 4 l

-Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA j K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted: P Bldg I A. ; HSt[ _; MNBBI A. ; Luge  ;

! PRELIMINARY NOTIFICATION

> ,u - .

i 9806230226 760701 PDR I&E PNO-76-108 PDR

-_ - - - - - --- __ _ _ _