Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247Q411 + (ML20247Q411)
- ML20247Q412 + (ML20247Q412)
- 05000322/LER-1989-007, :on 890823,full Reactor Trip & Nuclear Steam Supply Shutoff Sys Actuation Occurred While Transferring Power Supply.Caused by Operator Error.Operations Personnel Instructed to Review Procedure + (ML20247Q413)
- ML20247Q416 + (ML20247Q416)
- ML20247Q417 + (ML20247Q417)
- ML20247Q419 + (ML20247Q419)
- ML20247Q421 + (ML20247Q421)
- ML20247Q422 + (ML20247Q422)
- 05000324/LER-1989-001-02, :on 890214,HPCI Initiation During Performance of Maint Surveillance Test on ECCS Trip Unit Occurred.Caused by Spurious Electrical Noise by Adjacent Trip Unit.Component Failures Tracked + (ML20247Q423)
- ML20247Q425 + (ML20247Q425)
- ML20247Q426 + (ML20247Q426)
- ML20247Q429 + (ML20247Q429)
- ML20247Q430 + (ML20247Q430)
- ML20247Q432 + (ML20247Q432)
- IR 05000317/1989021 + (ML20247Q433)
- IA-89-184, Final Response to FOIA Request for Documents.Forwards App B Document Also Available in PDR + (ML20247Q438)
- ML20247Q438 + (ML20247Q438)
- IR 05000395/1989007 + (ML20247Q441)
- ML20247Q445 + (ML20247Q445)
- 05000320/LER-1989-005-01, :on 890830,operations Personnel Observed That Voltage of Cell 71 of Station Storage Battery Decreased More than 0.1 Volts Below Baseline Voltage Required by Recovery Operation Plan.Caused by Degradation of Cell + (ML20247Q447)
- ML20247Q448 + (ML20247Q448)
- ML20247Q449 + (ML20247Q449)
- ML20247Q450 + (ML20247Q450)
- ML20247Q451 + (ML20247Q451)
- ML20247Q452 + (ML20247Q452)
- ML20247Q455 + (ML20247Q455)
- IA-89-192, Concurs W/Proposal to Refer Investigation of Case 5-84-008 Re Tdi to Another Investigative Organization W/Appropriate Jurisdiction + (ML20247Q456)
- ML20247Q456 + (ML20247Q456)
- ML20247Q457 + (ML20247Q457)
- ML20247Q458 + (ML20247Q458)
- ML20247Q459 + (ML20247Q459)
- ML20247Q460 + (ML20247Q460)
- TXX-8932, Advises That Date of Full Compliance for Deviations & Violations Noted in Insp Repts 50-445/86-22,50-446/86-20, 50-445/86-03 & 50-446/86-02 Rescheduled for Completion Prior to Unit 1 Fuel Load.Unit 2 Schedule Unchanged + (ML20247Q461)
- ML20247Q462 + (ML20247Q462)
- ML20247Q465 + (ML20247Q465)
- ML20247Q466 + (ML20247Q466)
- ML20247Q469 + (ML20247Q469)
- ML20247Q472 + (ML20247Q472)
- ML20247Q474 + (ML20247Q474)
- 05000213/LER-1998-002, :on 980421,determined That Visual Insp of Switchgear Cable Shaft Sprinkler Sys Was Not Being Performed Once Per 18 Months.Caused by Inadequate Implementation of License Amend.Fire Watch Patrol Established + (ML20247Q475)
- ML20247Q482 + (ML20247Q482)
- ML20247Q485 + (ML20247Q485)
- ML20247Q486 + (ML20247Q486)
- ML20247Q487 + (ML20247Q487)
- ML20247Q488 + (ML20247Q488)
- ML20247Q492 + (ML20247Q492)
- ML20247Q496 + (ML20247Q496)
- ML20247Q497 + (ML20247Q497)
- ML20247Q499 + (ML20247Q499)
- BECO-89-071, Forwards Supplementary Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment + (ML20247Q501)
- 05000259/LER-1989-015-01, :on 890627,both Doors of Unit 1 Airlock Opened Simultaneously for 5 Constituting Breach of Secondary Containment.Caused by Weld Failure on Door Lock Mechanisms. Bracket Reattached & Door Operation Verified + (ML20247Q503)
- ML20247Q505 + (ML20247Q505)