ML20247Q429

From kanterella
Jump to navigation Jump to search
Supplemental Deficiency Rept CP-87-068 Re Concrete Expansion Anchors Supplied by Hilti.Initially Reported on 880205. Hilti Bolts Evaluated Using Nonconformance Repts in Lieu of FVM-90
ML20247Q429
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/21/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CP-87-068, CP-87-68, TXX-89712, NUDOCS 8909280193
Download: ML20247Q429 (1)


Text

____-__ -

g;&>

+ P.-===

Log.: # TXX-89712

~""

7 File # 10110 C

C 903.8 7UELECTRIC Ref, # 10CFR50.55(e)

September 21, 1989 W. J. Cahill :

Executive Vice Presdent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)-

DOCKET NOS. 50-445 AND 50-446 HILTI BOLT INADEQUACIES SDAR:

CP-87-068 (SUPPLEMENTAL REPORT)

Gentlemen:

On February 5,1988, TU Electric notified the NRC by final report logged TXX-88174 of several deficiencies involving concrete expansion anchors supplied by Hilti. This report is submitted to clarify a statement made in TXX-88174 regarding the documents being utilized to implement the corrective actions.

TXX-88174 indicated that Field Verification Method (FVM) SWEC-FVM-EE/ME/IC/CS-090 (FVM-90) would be utilized to verify proper torque and the absence of bottomed-out nuts.

However, other FVMs and/or Attribute Evaluation Forms (AEFs) were also used.

Additionally, as stated in TXX-88174, rotating equipment was evaluated under (FVM) CPE-IM-E0-103. Where Hilti bolts were used, according to TXX-88174, bottoming out and torque were to be evaluated using FVM-90.

However, the Hilti bolts were evaluated using non-conformance reports in lieu of FVM-90.

Sincerely, William J. Cahill, Jr.