Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000508/1989001 + (ML20247L340)
- ML20247L341 + (ML20247L341)
- 05000346/LER-1989-008, :on 890622,fire Sys Monthly Valve Insp Missed. Caused by Administrative & Personnel Error.Test Revised to Provide More Flexibility in Determining Operable Flowpath. Meeting Held on 890717 Re Responsibilities + (ML20247L343)
- ML20247L344 + (ML20247L344)
- ML20247L345 + (ML20247L345)
- ML20247L348 + (ML20247L348)
- ML20247L349 + (ML20247L349)
- ML20247L351 + (ML20247L351)
- IR 05000482/1989016 + (ML20247L352)
- ML20247L357 + (ML20247L357)
- ML20247L358 + (ML20247L358)
- ML20247L361 + (ML20247L361)
- ML20247L363 + (ML20247L363)
- ML20247L365 + (ML20247L365)
- ML20247L366 + (ML20247L366)
- IR 05000483/1998007 + (ML20247L367)
- ML20247L369 + (ML20247L369)
- ML20247L370 + (ML20247L370)
- ML20247L372 + (ML20247L372)
- 05000259/LER-1989-015-02, :on 890627,both Doors of Airlock Opened Simultaneously for Approx 5 S.Caused by Failure of Two Welds Which Attach Bracket That Holds Lockset on Refuel Floor Side.Lockset Bracket Reattached & Signs Placed + (ML20247L373)
- ML20247L374 + (ML20247L374)
- ML20247L375 + (ML20247L375)
- IR 05000192/1989002 + (ML20247L376)
- ML20247L377 + (ML20247L377)
- ML20247L378 + (ML20247L378)
- ML20247L379 + (ML20247L379)
- ML20247L380 + (ML20247L380)
- ML20247L384 + (ML20247L384)
- ML20247L385 + (ML20247L385)
- ML20247L386 + (ML20247L386)
- ML20247L388 + (ML20247L388)
- 3F0589-09, Monthly Operating Rept for Apr 1989 for Crystal River Unit 3 + (ML20247L392)
- ML20247L393 + (ML20247L393)
- ML20247L395 + (ML20247L395)
- ML20247L396 + (ML20247L396)
- ML20247L398 + (ML20247L398)
- ML20247L400 + (ML20247L400)
- ML20247L401 + (ML20247L401)
- ML20247L402 + (ML20247L402)
- ML20247L405 + (ML20247L405)
- ML20247L406 + (ML20247L406)
- ML20247L407 + (ML20247L407)
- ML20247L408 + (ML20247L408)
- ML20247L409 + (ML20247L409)
- PNO-II-89-037, Region II Notified That 2 of 53 Capsules Failed Cluck Test.Two Capsules Segregated Until Suitable Storage Location Can Be Found by DOE.Pre-shipment Testing Will Continue + (ML20247L415)
- ML20247L417 + (ML20247L417)
- ML20247L418 + (ML20247L418)
- ML20247L419 + (ML20247L419)
- ML20247L420 + (ML20247L420)
- ML20247L424 + (ML20247L424)
- 05000259/LER-1989-017-02, :on 890701,potential Transformer Compartment Door on 4 Kv Shutdown Board B Fell Open Disconnecting Fuse & Cabinet Contacts.Caused by Door Latching Mechanism Failure. General Operating Instruction to Be Issued + (ML20247L426)