ML20247L395

From kanterella
Jump to navigation Jump to search
Special Rept:On 890614,Channel 7 of Steam Generator 2C Vibration & Loose Parts Monitor Sys Declared Inoperable. Caused by Strong 60 Hz Tone Present in Channel.Work Request 43769OPS Written to Investigate & Repair Channel
ML20247L395
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/25/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908010231
Download: ML20247L395 (2)


Text

--  ;-- - ~z 3;

I;)kfl

' ' l ;) *.

')5 .

l f,.

t? . '8'

~ '

,: 4 ,

I Duxz POWER GOMPANY P.O. box 33189 '

CliARLOTTE, N.C. 28242.:

? HAL B. TUCKER '. 'TE1.EPHONE

! ;- , vms enemment . I'D4) 373-4531 p

(<'

?

r -.

July;25,(1989-
Document Control Desk ~ ~

<U.~S.-Nuclear Regulatory Commission

~

.W ashington, D.;C. 20555

Subject:

Catawba' Nuclear Station, Unit 2 Docket'No. 50-414 Special Report.

Gentlemen:

Pursuantito Technical Specific'ation 3.3.3.9, please find attached a Special

' Report.concerning'the inoperability of Channel No. 7 of the Catawba Unit 2.

Vibration.'and Loose Parts Monitor System for more than thirty days. Channel No. 7..

was. declared' inoperable on. June 14, 1989.

'.Very truly yours, Hal B. Tucker JGT/3/SR89-243 xc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101'Marietta Street, NW, Suite 2900

- Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector Catawba' Nuclear Station fG0

, 1 4

pp S --

6 C  :

1 o-1 CATAWBA NUCLEAR STATION, UNIT 2

, SPECIAL REPORT E

INOPERABILITY OF CHANNEL No. 7 OF THE STEAM GENERATOR 2C 4 LOOSE PARTS MONITOR SYSTEM l 1

1 1

On June 14, 1989 Channel No. 7 of the Catawba Nuclear Station Unit 2 Steam Generator 2C Vibration and Loose Parts Monitor System was declared inoperable due to a strong 60 Hz tone being present on the channel. This 60 Hz tone is probably the result of a short in the detector cable which may be causing a current ground loop.

Channel No. 10 of the Unit 2 Steam Generator 2C is operable. Therefore, a redundant channel is available for Steam Generator 2C. Work request 437690PS was written to investigate and repair the channel. Tht repair will be carried out during a future outage of sufficient duration. Thio work is to be performed during an outage due to containment entry being required to repair the channel.

The inoperability of Channel No. 7 for more than 30 days is reportable pursuant to Catawba Technical Specification 3.3.3.9. ,