Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247E700 + (ML20247E700)
- ML20247E702 + (ML20247E702)
- IR 05000259/1988035 + (ML20247E704)
- ML20247E705 + (ML20247E705)
- 05000287/LER-1989-003-06, :on 890727,reactor Bldg Isolation Valve 3LWD-1 Returned to Svc W/O Being Leak Rate Tested Following Maint on Valve Operator.Caused by Deficient Communication Between Engineers.Leak Rate Test Performed + (ML20247E706)
- ML20247E708 + (ML20247E708)
- SVP-98-170, Advises That AL Misak,License SOP-30832-1,is No Longer Required to Maintain Operator License + (ML20247E709)
- ML20247E710 + (ML20247E710)
- ML20247E711 + (ML20247E711)
- ML20247E715 + (ML20247E715)
- 05000318/LER-1989-009-01, :on 890522,fire Damper Found in Closed Position by Fire Protection Design Engineer.Caused by Failure of Damper Fusible Link.Link Replaced,Damper Opened & Damper Insp Procedure Improved & Clarified + (ML20247E716)
- NPL-98-0269, Provides Status Update on Program Activities Re Verification of Seismic Piping Class Interfaces.Schedule for Final Resolution of Items,Discussed + (ML20247E719)
- ML20247E720 + (ML20247E720)
- ML20247E721 + (ML20247E721)
- ML20247E722 + (ML20247E722)
- ML20247E724 + (ML20247E724)
- ML20247E725 + (ML20247E725)
- ML20247E727 + (ML20247E727)
- ML20247E729 + (ML20247E729)
- CY-98-079, Notifies NRC of Cancellation of Licenses for Listed Individuals,Per 10CFR50.74 + (ML20247E730)
- ML20247E731 + (ML20247E731)
- ML20247E732 + (ML20247E732)
- NRC-89-0129, Monthly Operating Rept for June 1989 for Fermi 2 + (ML20247E733)
- ML20247E734 + (ML20247E734)
- ML20247E736 + (ML20247E736)
- IR 05000440/1989018 + (ML20247E738)
- ML20247E739 + (ML20247E739)
- ML20247E741 + (ML20247E741)
- ML20247E742 + (ML20247E742)
- ML20247E743 + (ML20247E743)
- ML20247E744 + (ML20247E744)
- 05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl + (ML20247E745)
- ML20247E747 + (ML20247E747)
- ML20247E750 + (ML20247E750)
- ML20247E751 + (ML20247E751)
- ML20247E752 + (ML20247E752)
- ML20247E754 + (ML20247E754)
- ML20247E755 + (ML20247E755)
- ML20247E759 + (ML20247E759)
- ML20247E760 + (ML20247E760)
- ML20247E761 + (ML20247E761)
- ML20247E762 + (ML20247E762)
- ML20247E763 + (ML20247E763)
- 05000454/LER-1998-011-01, :on 980409,integral Attachment Welds Were Not Inspected IAW ASME Code Due to Deficient ISI Program Plan. Cause of Event Unknown.Byron Site Engineering & Operation Dept Evaluated Operability Issues + (ML20247E765)
- ML20247E767 + (ML20247E767)
- ML20247E768 + (ML20247E768)
- ML20247E769 + (ML20247E769)
- 05000260/LER-1989-026, :on 890810,diesel Generator B Declared Inoperable When Min Air Start Sys Pressure Not Met Due to Air Leak on High Pressure Head of Compressor.Caused by Failure to Reassemble Head Correctly + (ML20247E770)
- 05000354/LER-1998-003-01, :on 980407,concurrent Inoperability of a & B CR Chillers Was Noted.Caused by Personnel Error. Performed IST Tests,Equipment Repairs,Training & Revised Procedures + (ML20247E771)
- ML20247E772 + (ML20247E772)
- ML20247E774 + (ML20247E774)