Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Rev to Engineering Std to Clarify Intent of Erosion/Corrosion Monitoring Program Expected to Be Completed by 890930
ML20247E768
Person / Time
Site: Beaver Valley
Issue date: 07/18/1989
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-08, GL-89-8, NUDOCS 8907260305
Download: ML20247E768 (3)


Text

-

Bea r Valley Power Station

' Shippingport. PA 15077-0004 Vm Pr a n Nuctw Opmamis July 18, 1989 l-l.

U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 and No.

2~

BV-1' Docket No. 50-334, License No. DPR-66 DV-2-Docket No. 50-412, License No. NPF-73 Generic Letter 89-08

. Gentlemen:

Generic Letter 89-08

" Erosion / Corrosion-Induced Pipe. Wall Thinning" requested-information requiring the implementation of a long-term erosion / corrosion monitoring program to assure the structural ' integrity. of high energy carbon steel piping systems.

Duquesne Light Company (DLC) implemented an Engineering Standard,

" Erosion / Corrosion Program, for Beaver Valley Power Station Units 1 i

2" in

November, 1987.

This program meets the intent'of the NUMARC program and was intended as a long-term erosion / corrosion monitoring program for Beaver Valley Power Stations (BVPS).

However, since the engineering standard primarily provides engineering guidelines and control, and does not provide site-wide administrative controls, a Nuclear Group Directive has been drafted i

and is in the. review and approval phase.

The Nuclear Group Directive will ensure the implementation of a

long-term erosion / corrosion monitoring program and will administratively control the participation of all responsible personnel 'at the site.

A scheduled implementation date for the Nuclear Group Directive is November 15, 1989.

The engineering standard will also be revised in order to clarify the intent of the erosion / corrosion monitoring program.

A scheduled completion date for the engineering standard revision is September 30, 1989.

8907260300 890718 PDR ADOCK 05000334 gol P

PDC

' \\

l

_n

___1__

-y-;_-____

Betvar,Vallcy Powar Stetion,' Unit Nos.

l' & 2 4,.

Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Generic Letter 89-08 Page 2 If there are any questions concerning this response, please contact my office.

Very truly yours, D.

Sieber Vice President Nuclear Group cc:

Mr. J.

Beall, Sr. Resident Inspector Mr. W.

T. Russell, NRC Region I Administrator Mr.

P. Tam, Sr. Project Manager Director, Safety Evaluation & Control (VEPCO) i i

l i

l

e.

I V.

e.

l.

l l

COMMONWEALTH OF PENNSYLVANIA)

)

SS:

COUNTY OF BEAVER

)

l I

day of

[ ' u [ /-

1989, On this-

/d M'f a No ry P lic in and for said before me,

~

/

P

/

Commonwealth e.nd County, personally appeared J.

D. Sieber, who being duly

sworn, deposed, and said that (1) he is Vice President of Dug esne
Light, (2) he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his

' knowledge, information and belief.

1 l

l l

I h,

/

Notanal Sea!

Sheila M. Fattore. Notary Pubic SNppingport Boro, Buver County My Cammaston Eures 0ct.23.1989

_ MemW, Pervisyivane Awmaten os Noianas l

_____J