ML20247E725

From kanterella
Jump to navigation Jump to search
Requests 29-day Extension in Reporting Results of Nuclear Matl Control Sys Review.Listed Circumstances Necessitated by Listed Circumstances,Including Physical Inventory Scheduled to Commence on 890714.Fee Paid
ML20247E725
Person / Time
Site: 07000371
Issue date: 06/06/1989
From: Grenon N
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
To: Kasun D
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
25717, NUDOCS 8907260272
Download: ML20247E725 (2)


Text

.

9 Q

6 c'

a, e n y a 67 Sandy Desert Road i,

UNGNavalPro cts m : w -,82 y

gg 203/848-1511 Telecopy 203/848-0022

~

TWX 710/4321243 ggg

~

June 6, 1989 U,s.NucuAR REGULATORY, -

00EISS10ti NMSS on Falisectiort s

J, N

Mr. Donald J.

Kasun, Act1 cd

. Domestic Safeguards and Re'gional Oversite Br Division of Safeguards and Transportation, 00CKETED 9

U.

S. Nuclear Regulatory Commission 5'

USNRC I

Washington, D.C.

20555 MS4E4 g

JUL131989 ) 4

Reference:

Docket No.70-371 NMSS License SNM 368 N

//

D R

Dear Mr. Kasun:

d 4

Statement of Reculation - Code of. Federal Regulation 10_CFR

70. 58 (c) (2) requires a review at least every 12 months of the nuclear material control system.- Such a review includes a review and audit of material control and accounting procedures and practices and an audit of the nuclear material records.

Notwithstanding the above stated code requirement, UNC requests a 29 day extension in reporting results of subject review.

(September 15th instead of August 17, 1989).

The following circumstances have necessitated this request for extension:

1.

SNM Physical Inventory scheduled to commence July 14, 1989.

2.

Fourth of July holiday 3.

UNC anndal shutdown scheduled to commence July 24, 1989 4.

Annual INMM Meeting 5.

The independent contractors performing the review unable to meet the concluding report deadline on August 17, 1989.

This 29 day extension will enable the independent contractors time to complete the review of the nuclear material control system.

Enclosed is a check for $150.00 for administrative fees involved with the processing of this request.

I I hope you will act favorably on this Request for Extension.

Very truly yours, Leg -[%ia&d

)

f i

Remitter _--- f$$

- - - - - ~ ~ ~

\\

Check No.- -

i.

/t.

Mtm Amount -- - g9--(- /d -

s N. M Grenon i

Fee Category-.- -.

-,,7 NMC Manager (Acti @ po of Fee - - -- ' - F-

/kjh ste emplete 1

F 11.

07000 37 / F3oM B y : _ -

_ - - -fAAM--

OSSP0551 8907260272 890606 A UNC Company 25717

}l PDR ADOCK 07000371

_ C_

PDC

__