Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245K935 + (ML20245K935)
- ML20245K937 + (ML20245K937)
- ML20245K940 + (ML20245K940)
- ML20245K941 + (ML20245K941)
- ML20245K945 + (ML20245K945)
- ML20245K948 + (ML20245K948)
- ML20245K949 + (ML20245K949)
- ML20245K953 + (ML20245K953)
- 0CAN088905, Forwards Application for Amends to Licenses DPR-51 & NPF-6, Requesting Approval for Entergy Operations,Inc to Assume Responsibility for Plant Operation + (ML20245K954)
- ML20245K959 + (ML20245K959)
- ML20245K960 + (ML20245K960)
- ML20245K964 + (ML20245K964)
- ML20245K966 + (ML20245K966)
- ML20245K970 + (ML20245K970)
- ML20245K975 + (ML20245K975)
- ML20245K978 + (ML20245K978)
- ML20245K982 + (ML20245K982)
- ML20245K984 + (ML20245K984)
- ML20245K985 + (ML20245K985)
- ML20245K988 + (ML20245K988)
- ML20245K989 + (ML20245K989)
- ML20245K990 + (ML20245K990)
- SNRC-1593, Forwards Amend 3 to Indemnity Agreement B-87 + (ML20245K994)
- ML20245K995 + (ML20245K995)
- ML20245K999 + (ML20245K999)
- IR 05000346/1989015 + (ML20245L001)
- ML20245L002 + (ML20245L002)
- ML20245L003 + (ML20245L003)
- ML20245L004 + (ML20245L004)
- ML20245L006 + (ML20245L006)
- ML20245L008 + (ML20245L008)
- ML20245L012 + (ML20245L012)
- ML20245L013 + (ML20245L013)
- ML20245L014 + (ML20245L014)
- ML20245L016 + (ML20245L016)
- 05000213/LER-1989-010, :on 890530,quarterly Functional Test Required by Tech Spec 4.2 Not Met Due to Lack of Consideration of Channel Alarms on Refueling Water Storage Tank.Caused by Procedural Deficiency.Audit Performed + (ML20245L019)
- 05000352/LER-1989-045, :on 890716,radiation Monitor Indication Drifted Above Isolation Setpoint of 1.35 Mr/H Causing ESF Actuation. Caused by Equipment Failure.Radiation Monitor Declared Inoperable & Isolation Reset + (ML20245L021)
- NLS8900175, Responds to 890301 Request for Discussion of Facility Drawing Update Efforts,Together W/Schedule for Completing Updates,Per Insp Rept 50-298/89-02.Project Under Direction of Nuclear Configuration Mgt Dept + (ML20245L022)
- ML20245L023 + (ML20245L023)
- 05000327/LER-1989-012, :on 890410,containment Ventilation Isolation Occurred Due to High Radiation Spike on Radiation Monitor. Cause of Spike Undetermined.Containment Ventilation Isolation Reviewed to Evaluate ESF Actuations + (ML20245L024)
- ML20245L026 + (ML20245L026)
- ML20245L027 + (ML20245L027)
- ML20245L029 + (ML20245L029)
- ML20245L030 + (ML20245L030)
- RBG-31153, Special Rept:On 890530 & 31,temp in Div I & II Diesel Generator Above Tech Spec 3.7.8 Limit of 10 F.Caused by Heat Generated in Bldg & Insufficient Ventilation in Sys.Mod Request to Increase Exhaust Fans Prepared + (ML20245L031)
- ML20245L032 + (ML20245L032)
- ML20245L033 + (ML20245L033)
- ML20245L034 + (ML20245L034)
- ML20245L036 + (ML20245L036)
- 05000260/LER-1989-009, :on 890411,spurious Spikes on Independent Main Steam Line Radiation Monitors Resulted in Full Scram.Cause for Spikes Undetermined.Welding & Grinding in Area Stopped & Scram & Isolation Logic Reset + (ML20245L037)
- ML20245L039 + (ML20245L039)