ML20245L016

From kanterella
Jump to navigation Jump to search
Informs That 2-wk Extension to Complete Response to NRC Re Replacement of Amphenol Electrical Penetration Assemblies Necessary.Final Response to Be Submitted by 890515
ML20245L016
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/01/1989
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905050236
Download: ML20245L016 (1)


Text

1 l

1 l

1 E

- E ortlandGeneralElectricCorprzy

)

P i

I David W. Cockfield Vice President, Nuclear l

May 1, 1989 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington DC 20555

Dear Sir:

Amphenol (Bunker Ramo)

Electrical Penetration Assemblies By letter dated January 31, 1989, the Nuclear Regulatory Commission (NRC) requested Portland Ceneral Electric company (PGE) to respond within 90 days with our plans and schedule to qualify, test or replace Amphenol electrical penetration assemblies (EPAs) which the NRC staff concluded had inadequate environmental qualification documentation. The options for resolving this issue are still under management review. A two-week extension is necessary to complete our responso. The final response will be submitted by May 15, 1989.

Sincerely, E

wto

-(9 Q c:

Mr. John B. Martin

@[

Regional Administrator, Region V g@

U.S. Nuclear Regulatory Commission C0 0 w

Mr. William T. Dixon y

State of Oregon oo Department of Energy in(I y

b Mr. R. C. Barr i

y 0~. Q NRC Resident Inspector I o Trojan Nuclear Plant 121 S.W SMmon Sneet. Po'tand. Oregon 97204

_ _ _ _ - - - - _ _