Radial Peaking Factor Limit Repts for Four Loop & Three Loop Operation
ML20245L003
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/28/1989
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20245K992 List:
References
NUDOCS 8905050232
Download: ML20245L003 (5)


Text

._

e:

WESTINGHOUSE PROPRIETARY CIASS 3 I

I ATTACHMENT 1 Millstone Unit 3. Cycle 3 Radial Peaking Factor Limit Reports for Four Loop and Three Loop Operation 8905050232 890428 PDR ADOCK 05400423 P

@C

WESTINGHOUSE PROPRIETARY CIASS 3 Radial Peaking Factor Limit Report Four Loop Operation This Radial' Peaking Factor Limit Recort is provided in accordance with Paragraph 6.9.1.6 of the Millstone Unit 3 Nuclear Plant Technical Specifications.

4 The four loop operation F limits for RATED THERMAL POWER within specific core planes for Cycle 3 shall be:

1.

F less than or equal to 1.79 for all core planes containing xy Bank "D" control rods, and 2.

F less than or equal to 1.67 for all unrodded core planes.

These F (z) limits were used to confirm that the heat flux hot channel factor F (z) will be limited to the Technical Specification q

values of:

F (z) 5 [ p ] [K(z)] for P > 0.5 and, q

F (z) $ [4.64] [K(z)] for PS 0.5 q

assuming that most limiting axial power distributions expected to result from the insertion and removal or Control Banks B, C and D during operation, including the accompanying variations in the axial xenon and power distributions as described in the " Power Distribution Control and Load Following Procedures", WCAP-8403, September, 1974.

Therefore, these F limits provide assurance that the initial conditions assumed in the LOCA analysis are met, along with the ECCS acceptance criteria of 10CFR50.46.

See Figure 1 for a plot of [F

.PRel) versus Axial Core Height.

2.50 i

0.0. 2.32 l 6.0.2.32l 1

I I

I 10.8. 2.18l

~

~

,v,

l 2.25 7

,1

_, +++

3

++++

+

++

++

u

=,

I v

4

+

+

s, 2.00 t

?*',

' +

4

+

8

+

m a

+

W Q:1.75

'\\

Q-

\\

i r\\

ij

+

1.50 H

l12.0, 1.50 o

i w

U i

X 1.25 4

':E 1.00 +

.750

.500 0

2 4

6 8

10 12 COREHEIGHT(FEET)

Toe Bonou FIGURE 1 MAXIMUM FQT. pREL VERSUS AXIAL CORE HEIGHT DURING NORMAL CORE 4 LOOP OPERATION

WESTINGHOUSE PROPRIETARY CLASS 3 Radial Peaking Factor Limit Report Three Loop Operation This Radial Peaking Factor Limit Report is provided in accordance with Paragraph 6.9.1.6 of the Millstone Unit 3 Nuclear Plant Tectaical Specifications.

The three loop operation F ' limits for 65% of RATED THERMAL POWER xy within specific core planes for Cycle 3 shall be:

1.

F less than or equal to 1.64 for all core planes containing Bank "D" control rods, and 2.

F.65 RTP less than or equal to 1.53 for all unrodded core O

xy planes.

3.

In the relationship for F the multiplier M is equal to 0.312.

These F (z) limits were used to confirm that the heat flux hot channel factor F (z) will be limited to the Technical Specification q

values of:

F (z) 5 [ p ') [K(z)] for 0.65 > P > 0.325 and, q

F (z) 5 [5.20] [K(z)] for P $ 0.325 q

assuming that most limiting axial power distributions expected to j

I l

l result from the insertion and removal of Control Banks B, C and D during operation, including the accompanying variations in the axial xenon and power distributions as described in the " Power Distribution Control and Load Following Procedures", WCAP-8403, September, 1974.

f Therefore, these F limits provide assurance that the initial l

xy

(

conditions assumed in the IDCA analysis are met, along with the ECCS l

acceptance criteria of'10CFR50.46.

See Figure 2 for a plot of [F

.PRel) versus Axial Core Height.

t'*,, "

2.00 i

l l

1.75 0.0, 1.690l 6.0. 1.6901

.its,

y g

10.8,1.589l

~^

"-=a 4

m

_ 1.50

  1. , ++

LtJ

+

4

,+ ++*

+

.+

t f* +,

t+"

p

+ +,

,,, + ++++

r i,

+

1.25

,1 g

4 O

r Lt_

+

^

v s

y

< 1~00 si 2

l12.0,0.975 s

4 s

.750 C

l

.500 0

2 4

6 8

10 12 COREHEIGHT(FEET)

FIGURE 2 MAXIMUM FqT pRg VERSUS AXIAL CORE HEIGHT DURING NORMAL CORE 3 LOOP OPERATION i}