Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217K304 + (ML20217K304)
- ML20217K305 + (ML20217K305)
- ML20217K307 + (ML20217K307)
- ML20217K310 + (ML20217K310)
- NOC-AE-000111, Submits Listed Info in Support of Request for Relief from IWA 5250 of Section XI of ASME Boiler & Pressure Code in Order to Defer Permanent Repair of Flaw Identified in STP Unit 2 Ecw Sys Piping + (ML20217K311)
- 05000440/LER-1999-004, :on 990916,loss of Safety Function Resulted in TS 3.0.3 Entry.Caused by Design Deficiency in Control Complex Architectural Walls.Revised Storm Contingencies Instructions.With + (ML20217K312)
- ML20217K313 + (ML20217K313)
- U-602989, Annual Radioactive Effluent Release Rept for Clinton Power Station,Jan-Dec 1997 + (ML20217K314)
- ML20217K316 + (ML20217K316)
- ML20217K317 + (ML20217K317)
- ML20217K318 + (ML20217K318)
- ML20217K320 + (ML20217K320)
- ML20217K322 + (ML20217K322)
- ML20217K325 + (ML20217K325)
- ML20217K326 + (ML20217K326)
- ML20217K327 + (ML20217K327)
- ML20217K328 + (ML20217K328)
- ML20217K329 + (ML20217K329)
- ML20217K330 + (ML20217K330)
- ML20217K333 + (ML20217K333)
- ML20217K334 + (ML20217K334)
- ML20217K335 + (ML20217K335)
- ML20217K336 + (ML20217K336)
- ML20217K339 + (ML20217K339)
- ML20217K341 + (ML20217K341)
- ML20217K342 + (ML20217K342)
- ML20217K343 + (ML20217K343)
- ML20217K344 + (ML20217K344)
- ML20217K345 + (ML20217K345)
- ML20217K346 + (ML20217K346)
- ML20217K347 + (ML20217K347)
- ML20217K348 + (ML20217K348)
- 05000317/LER-1998-004, :on 980303,battery Charger Circuit Breakers Were Noted Missing from Seismic Positioner.Caused by Quality Issue Related to Vendor.All safety-related 480-volt Circuit Breakers Have Been Inspected + (ML20217K349)
- ML20217K351 + (ML20217K351)
- ML20217K352 + (ML20217K352)
- ML20217K353 + (ML20217K353)
- ML20217K356 + (ML20217K356)
- ML20217K357 + (ML20217K357)
- ML20217K358 + (ML20217K358)
- ML20217K361 + (ML20217K361)
- PY-CEI-NRR-2194, Forwards Response to NRC Re Violations Noted in Insp Rept 50-440/97-201 on 970217-0327.Corrective Actions: Calculation P11-12 Was Revised on 970305 + (ML20217K364)
- ML20217K365 + (ML20217K365)
- NRC-97-0076, Ro:On 970703,seismic Monitoring Instrumentation Sys Was Declared Inoperable.Seismic Instrumentation Was Not Located in RHR Complex Pump Room as Described in Ts.De Intends to Restore Instruments to Operable Status + (ML20217K369)
- 05000245/LER-1996-066, :on 960326,discovered LPCI Heat Exchangers Were Inoperable.Caused by Failure to Develop Adequate Heat Exchanger Performance Testing,Monitoring & Insp Program. Program Based on GL 89-13 Developed Prior to Restart + (ML20217K373)
- ML20217K375 + (ML20217K375)
- 05000278/LER-1999-005-03, :on 990920,uplanned Esfas During Planned Mod Activitives in Main CR Were Noted.Caused by Inattention to Detail by Individuals Performing Work.All CR Mods Were Ceased to Allow Review of Mod Work Packages.With + (ML20217K376)
- ML20217K378 + (ML20217K378)
- L-97-007, Forwards Annual Rept of Facility Changes,Tests & Expirements for Period of 951101-961031.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations + (ML20217K379)
- ML20217K380 + (ML20217K380)
- ML20217K382 + (ML20217K382)
- ML20217K386 + (ML20217K386)