ML20217K351

From kanterella
Jump to navigation Jump to search
Forwards Units 2 & 3 Tech Specs Bases Changes Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19.Encl Bases Reflect Changes Through Apr 1998,thereby Satisfying Frequency Requirements of 10CFR50.71
ML20217K351
Person / Time
Site: Peach Bottom  
Issue date: 04/28/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K355 List:
References
NUDOCS 9805010183
Download: ML20217K351 (1)


Text

Ct:.tlon Support Department

_A 10CFR50.71(e)

PECO NUCLEAR reco u,c A Unit of PECO Energy

$y[rYNN""

April 28,1998 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Changes to Technical Specifications Bases

Dear Sir / Madam:

In accordance with the requirement of Peach Bottom Atomic Power Station (PBAPS)

Units 2 and 3, Technical Specification 5.5.10.d, PECO Energy Company hereby submits all Unit 2 and Unit 3 Technical Specifications Bases changes through Unit 2 Bases Revision 17 and Unit 3 Bases Revision 19. The enclosed Bases reflect changes through April 1998, thereby satisfying the frequency requirements of 10CFR50.71.

If you have any questions or require further information, please contact us.

Very truly yours, Garrett D. Edwards Director-Licensing

Enclosures:

g\\g PBAPS Unit 2 Bases

\\

PBAPS Unit 3 Bases (P

cc: H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS 9805010183 980428 PDR ADOCK 05000277 P

PDR